Companies with dated public signals, ranked by fit with your products.
| Tier | Company | Score | Latest signal | Signals 90d | Last signal |
|---|---|---|---|---|---|
| C | Southland Industries Austin issued construction permits | 7 | Mechanical Permit · Replacement of complete existing central heat and air system with or without duct work Replacement of any self-contained packaged units Change out of RTUs and split systems. Work will take place on the roof and ceiling
spaces of levels 1 and 2. New controls wiring will installed and new t-stats No product keyword matched | 4 | Nov 10, 2026 |
| C |
| Mauldin Electric Company Austin issued construction permits |
| 7 |
Electrical Permit · Temporary meter for Verizon
REF:2026-105476 TUP No product keyword matched |
| 2 |
| Nov 10, 2026 |
| C | As You Wish Electric Seattle electrical permits | 7 | replacing air handler in home with HP/AH (2T HP) · Electrical No product keyword matched | 114 | Nov 10, 2026 |
| C | Bowie Electric Service Inc Seattle electrical permits | 7 | Relocating the existing homerun wires so that they are not in the path of the opening to the future garage · Electrical No product keyword matched | 36 | Nov 10, 2026 |
| C | A&A ELECTRIC Service LLC Seattle electrical permits | 7 | Relocate connection for double oven. Relocate wiring for and replace u/c lights, replace laundry light, reinstall wiring for kitchen penicila switch and receptacle. Replace GFCI protection for counter receptacles. · Electrical No product keyword matched | 12 | Nov 10, 2026 |
| C | VECA ELECTRIC & TECHNOLOGIES, LLC Seattle electrical permits | 7 | 830654 -834 8SW Telemetry and Patient LIft Power Seattle DPD: Provide (3) new emergency circuits Patient Lift and Telemetry Monitors [11/10/26 KEF - Plan set approved.] · Electrical No product keyword matched | 45 | Nov 10, 2026 |
| C | ECO ELECTRIC & PLUMBING Seattle electrical permits | 7 | Remove old panel/junction enclosure, re-splice wiring, and install two dedicated 20A circuits for microwave and bathroom. · Electrical No product keyword matched | 50 | Nov 10, 2026 |
| C | Johnson Controls Fire Protection Seattle electrical permits | 7 | Modification to existing fire alarm system. Installation of (1) new device. · Electrical No product keyword matched | 44 | Nov 10, 2026 |
| C | Lucid Electrical Services LLC Seattle electrical permits | 7 | New 400amp overhead service for 3 dwelling units. Service only. No rough-in. SCL SR 2606014.[11-10-26 VRF approved for service only.] · Electrical No product keyword matched | 14 | Nov 10, 2026 |
| C | Parkway C and A Austin issued construction permits | 7 | Building Permit · Interior finish out. All structural beams joists columns etc to remain. Existing electrical service to the space to remain. New finishes fixtures and equipment to be installed at existing retail. No product keyword matched | 1 | Nov 10, 2026 |
| C | Prism Electric Inc Austin issued construction permits | 7 | Electrical Permit · ePlan: Commercial Expedited Review - [PULBLIC PROJECT] New Construction of Austin Convention Center - Area 4. No product keyword matched | 11 | Nov 9, 2026 |
| C | Qual-Con General Contractor LLC Austin issued construction permits | 7 | Building Permit · Upgrade electrical service. No product keyword matched | 4 | Nov 9, 2026 |
| C | Prime Electric Seattle electrical permits | 7 | Temp Power for Christmas Tree - Job 1028594: Provide Temporary Power for the Christmas Tree. · Electrical No product keyword matched | 125 | Nov 9, 2026 |
| C | VITI ELECTRIC LLC Seattle electrical permits | 7 | Basement Remodel · Electrical No product keyword matched | 7 | Nov 9, 2026 |
| C | BRIGHT & RIGHT ELECT SRVS LLC DBA MOGOVOLT Seattle electrical permits | 7 | EV charger · Electrical No product keyword matched | 27 | Nov 9, 2026 |
| C | Fischer Services Seattle electrical permits | 7 | Heat pump · Electrical No product keyword matched | 21 | Nov 9, 2026 |
| C | MASTERCRAFT ELECTRIC, INC. Seattle electrical permits | 7 | Replace current under bar lights with new LED lights · Electrical No product keyword matched | 9 | Nov 9, 2026 |
| C | Benchmark Home Services Inc. Seattle electrical permits | 7 | Removing two existing panels and replacing with Modern Cutler Hammer Type CH panels, No Service Upgrade, CT cabinet is located in garage and is existing, no modification. Install new 14-50 EV receptacle in the garage. Fish one 14.2 NM cable from upstairs receptacle to one new receptacle outlet below. · Electrical No product keyword matched | 1 | Nov 9, 2026 |
| C | Performance Systems, Puget Sound Seattle electrical permits | 7 | 10312670 - Replace one (1) booster power supply (BPS). · Electrical No product keyword matched | 10 | Nov 9, 2026 |
| C | Skyway Electric, Inc. Seattle electrical permits | 7 | New DADU rough in and electrical service · Electrical No product keyword matched | 3 | Nov 7, 2026 |
| C | CM Constructors *MAIN* Austin issued construction permits | 7 | Building Permit · SMALL PROJECT - Interior tenant improvement of approximately 4800 sq ft of usable floor area. program is preventive out patient clinc with (1) MRI (1) CT prep area waiting/reception and staff support spaces. SPD 2026-082268DA No product keyword matched | 5 | Nov 6, 2026 |
| C | SOUTH WEST PLUMBING & WATERHEATERS, INC. Seattle electrical permits | 7 | Alteration of circuit for 90-90 furnace swap. · Electrical No product keyword matched | 68 | Nov 6, 2026 |
| C | LIGHTSMITH ELECTRIC LLC Seattle electrical permits | 7 | 3 added circuits for receptacles · Electrical No product keyword matched | 17 | Nov 6, 2026 |
| C | Cisco Electric Inc Seattle electrical permits | 7 | Adding bidet outlets, ceiling fan and 2 sub panels · Electrical No product keyword matched | 5 | Nov 6, 2026 |
| C | QUEEN ANNE ELECTRIC LLC Seattle electrical permits | 7 | Upgrade to 200A electrical service. Add circuits for appliances, heating/AC, living room, bedrooms, bathroom and kitchen outlets, install exterior GFCI receptacles and utility lighting. · Electrical No product keyword matched | 20 | Nov 6, 2026 |
| C | Parker Brothers Electric LLC Seattle electrical permits | 7 | Temporary Power Pole · Electrical No product keyword matched | 15 | Nov 6, 2026 |
| C | JH Kelly, LLC Seattle electrical permits | 7 | Replace existing 125A, 120/208V panel in rooftop mechanical room with new 125A panel, like-for-like. Reconnect existing circuits. No service or feeder changes. · Electrical No product keyword matched | 9 | Nov 6, 2026 |
| C | Olsen Electric Inc Seattle electrical permits | 7 | Install Misc Power for TI · Electrical No product keyword matched | 23 | Nov 6, 2026 |
| C | Beckett Electrical Services Austin issued construction permits | 7 | Electrical Permit · INTERIOR ALTERATION OF AN EXISTING OFFICE AND ASSEMBLY SPACE. No product keyword matched | 13 | Nov 5, 2026 |
| C | Liquid Contracting Austin issued construction permits | 7 | Building Permit · replace outdated electrical meter with a new 400a transocket and upgrade the existing disconnect panel. existing 400a-3ph electrical service to remain unchanged. building is currently vacant. no interior renovations structural modifications or tenant finish out in this scope. No product keyword matched | 1 | Nov 5, 2026 |
| C | EXACT ELECTRIC, LLC Seattle electrical permits | 7 | Adding a circuit for the family room receptacles. · Electrical No product keyword matched | 34 | Nov 5, 2026 |
| C | sunergy systems Seattle electrical permits | 7 | Installing rooftop photovoltaic system · Electrical No product keyword matched | 16 | Nov 5, 2026 |
| C | ALL WIRE ELECTRIC INC Seattle electrical permits | 7 | Joint venture All Wire Electric, Inc. and QNorthwest LLC. Adding (1) 20a outlet and low volt wire to each room (1516, 1544, 1550). · Electrical No product keyword matched | 9 | Nov 5, 2026 |
| C | BALLARD NATURAL GAS Seattle electrical permits | 7 | Install EV charger in the garage · Electrical No product keyword matched | 68 | Nov 5, 2026 |
| C | LT Electric Seattle electrical permits | 7 | Commercial tenant improvement for Sahara Beauty Salon. Electrical work includes installation of four (4) new 120V branch circuits serving two (2) power poles, one (1) dedicated 120V circuit for a washing machine, one (1) dedicated 240V, 30A circuit for an electric dryer, and installation of two (2) new GFCI receptacles along the rear wall utilizing an existing branch circuit. Work includes associated wiring, conduit, breakers, receptacles, connections, and supports. Existing electrical service · Electrical No product keyword matched | 3 | Nov 5, 2026 |
| C | Tapps Electric Seattle electrical permits | 7 | Removing a 60amp breaker, installing feed through lug kit for the subpanel it was feeding. · Electrical No product keyword matched | 12 | Nov 4, 2026 |
| C | Keithly Electric Company Seattle electrical permits | 7 | Service and panel upgrade and relocation
Install new heater/fan in bathroom · Electrical No product keyword matched | 16 | Nov 4, 2026 |
| C | Everon LLC Seattle electrical permits | 7 | installing 1 device · Electrical No product keyword matched | 13 | Nov 4, 2026 |
| C | HP Electric LLC Seattle electrical permits | 7 | new standby generator, gas by others. · Electrical No product keyword matched | 3 | Nov 4, 2026 |
| C | Daybreak Electric Seattle electrical permits | 7 | Service upgrade from 100 to 200 amps. Installing new meter/disco combination. Will feed 2 100 amp panels out of main service. · Electrical No product keyword matched | 1 | Nov 4, 2026 |
| C | Jabooda Construction Inc Seattle electrical permits | 7 | Temporary electrical service (construction power) for new townhome construction at 6711 42nd Ave S. 200A temporary service panel. · Electrical No product keyword matched | 1 | Nov 4, 2026 |
| C | Holaday Parks Inc Seattle electrical permits | 7 | Low voltage controls for HVAC system, 1 MAU, 24 WSHP. · Electrical No product keyword matched | 16 | Nov 3, 2026 |
| C | Sea-Tac Electric Inc Seattle electrical permits | 7 | 120 amp 120 V circuit to control new chemical pump feed · Electrical No product keyword matched | 24 | Nov 3, 2026 |
| C | SEQUOYAH ELECTRIC LLC Seattle electrical permits | 7 | Alter (14) 30 AMP Circuits - SEQ #7319090 · Electrical No product keyword matched | 11 | Nov 3, 2026 |
| C | Streamline Integration, Inc. Seattle electrical permits | 7 | New Bathroom and Bidet Circuit. · Electrical No product keyword matched | 4 | Nov 3, 2026 |
| C | KINGS HEATING & AIR CONDITIONING Seattle electrical permits | 7 | Adding (1) outdoor circuit for ductless heat pump · Electrical No product keyword matched | 9 | Nov 3, 2026 |
| C | BOONE ELECTRIC Seattle electrical permits | 7 | (2) 200 AMP PANELS, (2) FEEDERS · Electrical No product keyword matched | 4 | Nov 2, 2026 |
| C | STATIC ENERGY, INC Seattle electrical permits | 7 | Class 2 LV Controls:
Terminate (22) VAV's and associated T-stats · Electrical No product keyword matched | 8 | Oct 30, 2026 |
| C | Jennings Electric, Inc Seattle electrical permits | 7 | We are adding an Emergency back up power system for (2) existing 2 hp sump pumps in crawlspace
Add (1) 20KW, diesel, Back up generator, Add (1) 60a 3ph 208v ATS, Add (1) 60a 208v 3ph Panel "GP", relocate (2) 20a 208v circuits from Panel B to panel GP for (2) existing sump pumps in crawlspace. · Electrical No product keyword matched | 1 | Oct 30, 2026 |
| C | Enertech Resources, LLC Austin issued construction permits | 7 | Building Permit · Upgrade antennas on existing rooftop wireless telecommunications facility - no backup batteries or generator proposed. No product keyword matched | 3 | Oct 29, 2026 |