Replace existing 125A, 120/208V panel in rooftop mechanical room with new 125A panel, like-for-like. Reconnect existing circuits. No service or feeder changes. · Electrical
Replace existing 125A, 120/208V panel in rooftop mechanical room with new 125A panel, like-for-like. Reconnect existing circuits. No service or feeder changes. · Electrical
No product keyword matched · Seattle electrical permits
Temporary construction power for interior demolition under permit 7126775-CN. Install 4 spider boxes (50A, 120/240V) fed from existing breakers in existing panels. No new circuits, no emergency power. Educational facility plan review waived by Scott Lau, SDCI Electrical Official, 11/6/26. · Electrical
No product keyword matched · Seattle electrical permits
Install 4 new branch circuits (one 2-pole 30A, three 20A) in existing exam rooms, fed from existing 225A panel. No service or feeder changes. · Electrical
No product keyword matched · Seattle electrical permits
Replace existing ATS with new ATS with load bank. Existing ATS to be a termination/splice box per the new one line. [10/29/26 BGO - Approved Plan Set with Comments] · Electrical
No product keyword matched · Seattle electrical permits
Add (2) fire alarm modules to the existing building fire alarm system in the Tower 1, Level A fire pump control room. The modules were installed in conjunction with the fire pump and controller replacement under finaled permit 7138889-EL. No changes to the fire alarm control panel. SFD acceptance testing to be coordinated with Convergint. · Electrical
No product keyword matched · Seattle electrical permits
Extend Existing 100a 480v circuit for new equipment
We are to disconnect existing equipment and use the existing circuit for new equipment, the connection is in a different spot so we need to extend the circuit length by 10 feet or less · Electrical
No product keyword matched · Seattle electrical permits
Replace 4 like for like panels and breakers, all breakers and panels are replacing existing breakers and panels with amperage and voltage. [*7-27-29 D Rankin - we need photos of the existing, fault current available at the panels and for the new, information on the new products, i.e. panel drawings of the ordered panels along with rating of breakers.] · Electrical
No product keyword matched · Seattle electrical permits
Per email from Jeff Chriest on 07-17-26, plan review will be waived for this installation. Jeff told us to purchase a 225 to 350 amp feeder on an OTC permit. Scope: We will be replacing a 400A feeder panel at an Amazon commercial facility with a like-in-kind replacement. The main breaker for the panel is upline, at the distribution equipment. There is no 400A main in the panel being replaced. No load is being added or removed. · Electrical
No product keyword matched · Seattle electrical permits
Disconnect (2) fire pumps so Columbia fire can replace
Once the fire pumps are replaced reconnect the same circuits
Relocate existing jockey pump controller to the center of the room to make room for new controller
Install new fire pump controller. Re using circuit that feeds old main pump controller
Disconnect/reconnect fire alarm wiring as needed [9-24-26 D Rankin - Client took out a Fire Alarm permit, which has been corrected to Power wiring permit, and review to be conducted. · Electrical
No product keyword matched · Seattle electrical permits
Gut MCC cabinet control contactors and utilize existing fused switch as a disconnect
Build Strut rack to hold 2 new VFD's
Use basement of MCC as race way and existing raceway to the motor(s). · Electrical
No product keyword matched · Seattle electrical permits