Home
Workspace
Klise
Target
Seer
Signals
Competitors
Contacts
Log in
Seer/Prospects/BOONE ELECTRIC
Back to prospects

BOONE ELECTRIC

SEATTLE, Seattle, WA · Outside service region

AnalysisCompany profileContactsEmail draftSources

Analysis

Overall 7 / 20Tier C
Keyword
Seer chat
1 / 5
0 keyword-matching signals in the last 90 days.
Freshness5 / 5Latest signal is within 30 days.
Place0 / 5WA is outside the seller’s region and target regions.
Target fit1 / 5No target company types set; baseline is 1 star.

Company profile

Company
BOONE ELECTRIC
Source for Company (opens in new tab)
Signal source
Seattle electrical permits
Signal date
Nov 2, 2026
Source for Signal date (opens in new tab)
Signal count
18 saved signals, 4 in the last 90 days
Signal summary
(2) 200 AMP PANELS, (2) FEEDERS · Electrical
Source for Signal summary (opens in new tab)
Address
Not found
Phone
Not found
Email
Not found
Website
Not found
Decision maker
Not found
DM title
Not found

Contacts

No contact found

Phone: not found · See the source record

Log in to search contacts

Email draft

Add a contact before generating a draft.

Sources

18 signals
  • Nov 2, 2026
    Permit
    (2) 200 AMP PANELS, (2) FEEDERS · Electrical
    No product keyword matched · Seattle electrical permits
    Source record (opens in new tab)
  • Oct 30, 2026
    Permit
    TEMP POWER POLE · Electrical
    No product keyword matched · Seattle electrical permits
    Source record (opens in new tab)
  • Oct 22, 2026
    Permit
    TEMP POWER, 200AMP 480 SERVICE, OVERHEAD · Electrical
    No product keyword matched · Seattle electrical permits
    Source record (opens in new tab)
  • Sep 22, 2026
    Permit
    ADDED 125AMP GENERATOR FOR ELEVATOR SERVICE · Electrical
    No product keyword matched · Seattle electrical permits
    Source record (opens in new tab)
  • Aug 10, 2026
    Permit
    Telecom and electrical. Changing (1) metered 200 amp, to (2) separate 100 amp metered panels · Electrical
    No product keyword matched · Seattle electrical permits
    Source record (opens in new tab)
  • Aug 5, 2026
    Permit
    ADDING EV CHARGER, CHANGE KITCHEN CANS ADD CANS DINING AND LIVING ROOMS, MINOR CHANGES IN THE MASTER BATHROOM. · Electrical
    No product keyword matched · Seattle electrical permits
    Source record (opens in new tab)
  • Jul 24, 2026
    Permit
    ADD EV 50AMP CHARGER AND MODIFIY 6 CIRCUITS · Electrical
    No product keyword matched · Seattle electrical permits
    Source record (opens in new tab)
  • May 27, 2026
    Permit
    129- dryer 30 amp circuits · Electrical
    No product keyword matched · Seattle electrical permits
    Source record (opens in new tab)
  • May 19, 2026
    Permit
    This permit is for the electrical work associated with the conveyor system that we are installing in the building. Work is currently underway and ongoing - We have an approved permit in Tukwila where 95%+ of this installation takes place, we were informed late that a portion of this building goes into Seattle. The section of our installation within Seattle jurisdiction is approximately 92 linear feet in length, and represents approximately 296.75 square feet. Reference Permit in Tukwila i · Electrical
    No product keyword matched · Seattle electrical permits
    Source record (opens in new tab)
  • Apr 28, 2026
    Permit
    TELECOM AND MAIN ELECTRICAL FOR 118 UNIT MIXED USE BUILDING WITH 4 RETAIL SPACES [4/28/26 KEF - Plan set approved.] · Electrical
    No product keyword matched · Seattle electrical permits
    Source record (opens in new tab)
  • Apr 7, 2026
    Permit
    200 amp generator temp power · Electrical
    No product keyword matched · Seattle electrical permits
    Source record (opens in new tab)
  • Apr 1, 2026
    Permit
    Providing Electrical West SFR [4/1/26 BGO Approved Plan Set for West SFR interior wiring and feeder; Service resulted under record 7135031-EL] · Electrical
    No product keyword matched · Seattle electrical permits
    Source record (opens in new tab)
  • Apr 1, 2026
    Permit
    Providing Electrical for Duplex Town House [4/1/26 BGO - Approved Plan set; This permit is for the interior wiring and feeders to the duplex; Service resulted under record 7135031-EL] · Electrical
    No product keyword matched · Seattle electrical permits
    Source record (opens in new tab)
  • Apr 1, 2026
    Permit
    Providing Electrical rough in and trim for Ravenna project [4/1/26 BGO - Approved Plan Set for Service to (4) Dwellings and the Interior wiring of an SFR. See related records for the duplex and second SFR] · Electrical
    No product keyword matched · Seattle electrical permits
    Source record (opens in new tab)
  • Mar 13, 2026
    Permit
    For temporary construction office, 1-200 amp panel, 1-200 amp feeder, 15-devices, 8- 20 amp circuits · Electrical
    No product keyword matched · Seattle electrical permits
    Source record (opens in new tab)
  • Mar 12, 2026
    Permit
    ELECTRICAL AND TELECOM FOR MIXED USE BUILDING [10/8/2026 GBO - Approved Revised Plan Pages] · Electrical
    No product keyword matched · Seattle electrical permits
    Source record (opens in new tab)
  • Mar 6, 2026
    Permit
    Temp power overhead 600 amps · Electrical
    No product keyword matched · Seattle electrical permits
    Source record (opens in new tab)
  • Dec 12, 2025
    Permit
    INSTALL PVC FROM METER PACK TO UNITS- conduit only (goitj- 12-17-2025) · Electrical
    No product keyword matched · Seattle electrical permits
    Source record (opens in new tab)