Home
Workspace
Klise
Target
Seer
Signals
Competitors
Contacts
Log in
Seer/Prospects

Prospects

Companies with dated public signals, ranked by fit with your products.

Prospects22,539
Tier S19
New this week163
AllSABC
TierCompanyScoreLatest signalSignals 90dLast signal
SRICHARD NEU
NYC DOB electrical permits
16
INSTALLATION OF LIGHTING FOR SIDEWALK SHED.
No product keyword matched
535Nov 11, 2026
SNYC SCHOOL CONSTRUCTION AUTHORITY
NYC DOB building permits
16
Plumbing · Installation of two new sinks and one dual level drinking fountain, plus height adjustment of one existing drinking fountain - all on third floor.
Seer chat
No product keyword matched
565
Nov 10, 2026
SWCK ELECTRIC CORP.
NYC DOB electrical permits
16
This is to replace wiring throughout first floor apt
No product keyword matched
95Nov 10, 2026
SBERGER QUALITY ELEC'L CON
NYC DOB electrical permits
16
Rewiring of a new garage behind the main house
No product keyword matched
119Nov 10, 2026
SSOLAS ELECTRICAL CORP
NYC DOB electrical permits
16
Wiring for 95' of sidewalk shed lighting. Not responsible for power feed or maintaining lights
No product keyword matched
137Nov 10, 2026
SJOSEPH WEINSTEIN ELECTRIC
NYC DOB electrical permits
16
Installing Panels and A/C Disconnect Switches
No product keyword matched
162Nov 10, 2026
SSOLAR ELEC CONTRACTNG LLC
NYC DOB electrical permits
16
Connect the solar system to the main service via line side tap with micro inverters. 1 Solar disconnect. 1 Combiner panel and 1 feeder conductor
No product keyword matched
93Nov 10, 2026
SA & S ELECTRIC INC.
NYC DOB electrical permits
16
Trouble -shoot electrcial systems serving (2) motorized partirion doors located on the east and west side of Auditorium. Key switches replace to restore operation
No product keyword matched
49Nov 10, 2026
SHIVOLTS ELECTRICAL INC
NYC DOB electrical permits
16
REINSTATE ABANDONED APPLICATION B170185
No product keyword matched
34Nov 10, 2026
SINDY ELECTRIC CORP.
NYC DOB electrical permits
16
One family, Gut-Rehab.
No product keyword matched
22Nov 10, 2026
SMASTEC NETWORK SOLUTIONS
Austin issued construction permits, NYC DOB building permits
16
Suspended Scaffold · IRA FOR THE VERTICAL CABLE TRAY LOCATION INSPECTION
No product keyword matched
11Nov 9, 2026
SK & G ELECTRIC CO., INC
NYC DOB electrical permits
16
Picking up abandoned permit M247073 in apartment 7D for four receptacles.
No product keyword matched
110Nov 9, 2026
SDM ELECTRICAL CORPORATION
NYC DOB electrical permits
16
Upgrade electrical service from single phase 120V to 208 single phase
No product keyword matched
8Nov 8, 2026
SVERIZON
NYC DOB building permits
16
General Construction · SELECTIVE DEMOLITION, CONSTRUCTION AND FINISH WORK AT BASEMENT LEVEL B IN SUPPORT OF STRUCTURAL REPAIRS
No product keyword matched
21Nov 6, 2026
SADCO ELEC'L CORP
NYC DOB electrical permits
16
260035- HORIZON DETENTION CENTER BOILERS & RTU REPLACEMENT- new 400A BLR panel fed from the EXISTING MSB Section A. Power for new Boilers 1 & 2, RTU-5 and associated pumps
No product keyword matched
21Nov 6, 2026
SCITY OF NEW YORK
NYC DOB building permits
16
Foundation · FILING HEREWITH CONTRACT JA-179: JAMAICA WRRF STRUCTURAL ACTIVITIES AS PER SUBMITTED PLANS.
No product keyword matched
19Nov 5, 2026
SNASH ELECTRIC SERVICES IN
NYC DOB electrical permits
16
SIDEWALK SHED LIGHTING FOR MC SUPERSTRUCTURE ONLY. WE ARE NOT RESPONSIBLE FOR FEED OR MAINTAINING LIGHTS
No product keyword matched
94Nov 5, 2026
SRELENTLESS ELECTRIC.CONTR
NYC DOB electrical permits
16
Service upgrade from 60 amps to 125 amps. Service voltage upgrade from 120v to 220v. Installation of (1) Remote Emergency Disconnect Stop button.
No product keyword matched
13Oct 30, 2026
SN.Y.C. HOUSING AUTHORITY
NYC DOB electrical permits
16
Install temporary feeder to mobile boiler for heat and hotwater.
No product keyword matched
6Oct 29, 2026
Showing 1–19 of 19