Home
Workspace
Klise
Target
Seer
Signals
Competitors
Contacts
Log in
Seer/Prospects/VERIZON
Back to prospects

VERIZON

Manhattan, Brooklyn, Bronx, NY · Outside service region

AnalysisCompany profileContactsEmail draftSources

Analysis

Overall 16 / 20Tier S
Keyword
Seer chat
5 / 5
At least 5 keyword-matching signals in the last 90 days.
Freshness5 / 5Latest signal is within 30 days.
Place5 / 5NY matches the seller’s region.
Target fit1 / 5No target company types set; baseline is 1 star.

Company profile

Company
VERIZON
Source for Company (opens in new tab)
Signal source
NYC DOB building permits
Signal date
Nov 6, 2026
Source for Signal date (opens in new tab)
Signal count
47 saved signals, 21 in the last 90 days
Signal summary
General Construction · SELECTIVE DEMOLITION, CONSTRUCTION AND FINISH WORK AT BASEMENT LEVEL B IN SUPPORT OF STRUCTURAL REPAIRS
Source for Signal summary (opens in new tab)
Address
100 PARK AVENUE
Source for Address (opens in new tab)
Phone
Not found
Email
Not found
Website
Not found
Decision maker
Not found
DM title
Not found

Contacts

No contact found

Phone: not found · See the source record

Log in to search contacts

Email draft

Add a contact before generating a draft.

Sources

47 signals
  • Nov 6, 2026
    Permit
    General Construction · SELECTIVE DEMOLITION, CONSTRUCTION AND FINISH WORK AT BASEMENT LEVEL B IN SUPPORT OF STRUCTURAL REPAIRS
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)
  • Nov 6, 2026
    Permit
    Sidewalk Shed · INSTALLATION OF TEMPORARY SIDEWALK SHED AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)
  • Nov 4, 2026
    Permit
    Suspended Scaffold · Installation of suspended scaffold for facade inspection/repair.
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)
  • Nov 4, 2026
    Permit
    Sprinklers · Hereby filing modification to existing sprinkler system. Existing piping and sprinkler head to be modified to accommodate new layout.
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)
  • Oct 7, 2026
    Permit
    General Construction · REMOVE EXISTING 200KW TURBINE GENERATOR AND EXISTING 350KWDIESEL ENGINE ON FIRST FLOOR. REMOVE EXISTING INTERIOR PARTITIONSIN ORDER TO ENLARGE ROOM FOR NEW ELECTRICAL SWITCH GEAR.PROVIDE NEW STEEL ROOF DUNNAGE FOR NEW 800KW ROOFTOPGENERATOR WITH ENCLOSURE
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)
  • Oct 2, 2026
    Permit
    Supported Scaffold · PROPOSED INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. WORK SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)
  • Oct 2, 2026
    Permit
    Sidewalk Shed · INSTALLATION OF TEMPORARY SIDEWALK SHED AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)
  • Sep 30, 2026
    Permit
    General Construction · Filing for Emergency Facade Repairs
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)
  • Sep 29, 2026
    Permit
    Structural · Filing for partial foundation on grade, structural first floor framing and Roof Dunnage framing to support the NEW Emergency Generator Equipment.
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)
  • Sep 29, 2026
    Permit
    Suspended Scaffold · SUSPENDED SCAFFOLD OUTRIGGER SYSTEM FOR EXTERIOR FACADE RESTORATION AND INSPECTION WORK AT 370 EAST 150 STREET, BRONX, NY 10455
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)
  • Sep 24, 2026
    Permit
    General Construction · Hereby filing related architectural construction on basement, 1st and roof levels in support of replacement of rooftop emergency generator and associated equipment. No change to use, egress, or occupancy.
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)
  • Sep 24, 2026
    Permit
    Mechanical Systems · HEREBY FILING NEW GENERATOR , SWITCHGEAR AND RELATED PIPING PER PLAN FILED HEREWITH
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)
  • Sep 22, 2026
    Permit
    Sidewalk Shed · INSTALLATION OF NEW SIDEWALK SHED AT 97-15 CHRISTIE AVENUE QUEENS NY 11368 AS INDICATED ON PLANS. THERE WILL BE NO CHANGE IN THE USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)
  • Sep 22, 2026
    Permit
    Supported Scaffold · INSTALLATION OF PIPE SCAFFOLD AT 97-15 CHRISTIE AVENUE QUEENS NY 11368 AS INDICATED ON PLANS. THERE WILL BE NO CHANGE IN THE USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)
  • Sep 18, 2026
    Permit
    General Construction · Filing for Emergency Facade repair work To include Brick replacement, mortar joint repointing, Stone repairs, Cracking repairs and sealant replacement.
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)
  • Sep 16, 2026
    Permit
    Suspended Scaffold · Installation of suspended scaffold for facade inspection/repair.
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)
  • Sep 15, 2026
    Permit
    Suspended Scaffold · Installation of suspended scaffold for facade inspection/repair.
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)
  • Sep 11, 2026
    Permit
    Structural · Filing Structural work associated with the additions and alterations to replace emergency generator as per plans file herewith,. No change of use, occupancy or egress under this application.
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)
  • Sep 10, 2026
    Permit
    General Construction · Filing Alt-2 application for a new emergency generator and associated equipment as per the drawings file herewith, there is no change of use, occupancy, or egress under this application.
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)
  • Sep 9, 2026
    Permit
    General Construction · Filing for Emergency Facade repair work To include Brick replacement, mortar joint repointing, Stone repairs, Cracking repairs and sealant replacement.
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)