Home
Workspace
Klise
Target
Seer
Signals
Competitors
Contacts
Log in
Seer/Prospects/STATIC ENERGY, INC
Back to prospects

STATIC ENERGY, INC

SEATTLE, WA · Outside service region

AnalysisCompany profileContactsEmail draftSources

Analysis

Overall 7 / 20Tier C
Keyword
Seer chat
1 / 5
0 keyword-matching signals in the last 90 days.
Freshness5 / 5Latest signal is within 30 days.
Place0 / 5WA is outside the seller’s region and target regions.
Target fit1 / 5No target company types set; baseline is 1 star.

Company profile

Company
STATIC ENERGY, INC
Source for Company (opens in new tab)
Signal source
Seattle electrical permits
Signal date
Oct 30, 2026
Source for Signal date (opens in new tab)
Signal count
43 saved signals, 8 in the last 90 days
Signal summary
Class 2 LV Controls: Terminate (22) VAV's and associated T-stats · Electrical
Source for Signal summary (opens in new tab)
Address
Not found
Phone
Not found
Email
Not found
Website
Not found
Decision maker
Not found
DM title
Not found

Contacts

No contact found

Phone: not found · See the source record

Log in to search contacts

Email draft

Add a contact before generating a draft.

Sources

43 signals
  • Oct 30, 2026
    Permit
    Class 2 LV Controls: Terminate (22) VAV's and associated T-stats · Electrical
    No product keyword matched · Seattle electrical permits
    Source record (opens in new tab)
  • Oct 14, 2026
    Permit
    Class 2LV Controls: (1) VAV w/ field mounted controls and wires. · Electrical
    No product keyword matched · Seattle electrical permits
    Source record (opens in new tab)
  • Oct 9, 2026
    Permit
    L35 Scope of Work: Re-wire (6) Relocated VAVs FPVAV-35-06p, 35-16i, 35-18i, 35-20i, 35-50i, 35-54p. (24) Relocated Thermostats field mounted and wired. (1) FCU with field mounted and wired controls. L36 Scope of Work: Re-wire (9) Relocated VAVs FPVAV-36-11, 36-36, 36-13, 36-38, 36-14, 36-17, 36-21, 36-25, 36-28. (30) Relocated Thermostats field mounted and wired. (1) FCU with field mounted and wired controls. Re-wire (6) Relocated VAVs FPVAV-36-11, 36-13, 36-17, 36-21, 36-25, 36-28. (28) Relo · Electrical
    No product keyword matched · Seattle electrical permits
    Source record (opens in new tab)
  • Oct 5, 2026
    Permit
    Class 2 LV HVAC Controls (2) Relocated thermostats. (2) Damper Actuators · Electrical
    No product keyword matched · Seattle electrical permits
    Source record (opens in new tab)
  • Sep 24, 2026
    Permit
    Class 2 LV HVAC  (1) New FCU with field mounted and wired controls  (8) New VAVs with field mounted and wired controls. · Electrical
    No product keyword matched · Seattle electrical permits
    Source record (opens in new tab)
  • Sep 14, 2026
    Permit
    Class II LV Controls: -(4) FCU's with field mounted and wired controls. -(2) Exhaust Fan with start/stop/status and Speed control. -(1) UPS. -(6) TVSS for Surge Protection on power supplies. -(1) Power home Run for Transformer Power. · Electrical
    No product keyword matched · Seattle electrical permits
    Source record (opens in new tab)
  • Aug 27, 2026
    Permit
    Class 2 LV Controls: (27) VAV with field mounted and wired new Alerton controls. (4) Occ sensor field wired to nearby VAV controller. · Electrical
    No product keyword matched · Seattle electrical permits
    Source record (opens in new tab)
  • Aug 17, 2026
    Permit
    Class 2 LV Controls: Relocate [Qty. 1] Terminal Unit and the associated space temperature sensor (FPVAV-0106p) Relocate [Qty. 1] Terminal Unit and the associated space temperature sensor (EHP-20) [Qty. 1] New 5-Ton Heat Pump (EPH-22) [Qty 1] New 1.25 Ton Heat Pump (EHP-20A) [Qty. 2] New CO2 sensors; sensors are to be connected to existing Alerton controller(s). · Electrical
    No product keyword matched · Seattle electrical permits
    Source record (opens in new tab)
  • Aug 12, 2026
    Permit
    Provide and install (1) new 100 Amp Fused Service Disconnect at the new RTU. Includes Fuses. Connect the new RTU to the Service Disconnect. Provide and install a new 480-volt 3 phase 70 Amp Circuit Braker and install it in the existing Panel Board. · Electrical
    No product keyword matched · Seattle electrical permits
    Source record (opens in new tab)
  • Aug 4, 2026
    Permit
    Class 2 LV Controls: (1) Global controller with transformer and enclosure. (1) VRF Central controller field mounted and wired. (25) FCs with field interconnecting wiring and field mounted and wired thermostats. (2) BCs with field interconnecting wiring. (2) ODUs with field interconnecting wiring (3) ERVs with field mounted and wired (5) loosely shipped devices and (6) Dampers. · Electrical
    No product keyword matched · Seattle electrical permits
    Source record (opens in new tab)
  • Aug 3, 2026
    Permit
    Class 2 Lighting control retrofit. · Electrical
    No product keyword matched · Seattle electrical permits
    Source record (opens in new tab)
  • Jul 28, 2026
    Permit
    Class 2 LV Controls · Electrical
    No product keyword matched · Seattle electrical permits
    Source record (opens in new tab)
  • Jul 15, 2026
    Permit
    Class 2 LV HVAC Controls.  (3) New FCUs with field mounted and wired controls.  (2) New EFs with field mounted and wire start/stop/status. (EF-2304, 2305)  (12) Relocated VAVs and associated thermostat. (VAV-2301, 2302, 2304, 2307, thru 2311, 2315, 2322, 2323, 2321). · Electrical
    No product keyword matched · Seattle electrical permits
    Source record (opens in new tab)
  • Jun 29, 2026
    Permit
    Class 2 LV HVAC Controls  Relocate (2) TUs and associated thermostat (TU-808p, 821i).  (2) New TU with field mounted controls (TU-809p, 827i). · Electrical
    No product keyword matched · Seattle electrical permits
    Source record (opens in new tab)
  • Jun 12, 2026
    Permit
    Class 2 LV Controls: -Relocate [Qty. 1] terminal unit and associated thermostat FST-50618 -[Qty. 1] New Packaged ERV (ERV-6-01) -[Qty. 1] Split System (FCU-6-01/HP-R-01) · Electrical
    No product keyword matched · Seattle electrical permits
    Source record (opens in new tab)
  • Jun 2, 2026
    Permit
    Class 2 LV HVAC Controls. L5:  Relocate (5) Thermostats (VAV-0502, 0513,0514, 0523, 0524).  (6) Relocated VAVs and associated thermostat. (VAV-0501, 0511, 0512, 0515, 0516 0522).  (1) Relocated WSHP and associated thermostat.  (2) New VAVs with field mounted and wired controls. L16:  Relocate (5) Thermostats (VAV-1607, 1608, 1609, 1625, 1627, 1628).  (10) Relocated VAVs and associated thermostat. (VAV-1603, 1604, 1605, 1606, 1620, 1621, 1622, 1623, 1624, 1626).  (2) New VAVs with field · Electrical
    No product keyword matched · Seattle electrical permits
    Source record (opens in new tab)
  • May 20, 2026
    Permit
    Class 2 LV Mechanical Controls · Electrical
    No product keyword matched · Seattle electrical permits
    Source record (opens in new tab)
  • May 7, 2026
    Permit
    Class 2 LV Controls. · Electrical
    No product keyword matched · Seattle electrical permits
    Source record (opens in new tab)
  • May 1, 2026
    Permit
    Class 2 LC Controls for mechanical devices and units · Electrical
    No product keyword matched · Seattle electrical permits
    Source record (opens in new tab)
  • Apr 28, 2026
    Permit
     (1) New VAV with field mounted controls (re-use controller and thermostat from VAV-909i) · Electrical
    No product keyword matched · Seattle electrical permits
    Source record (opens in new tab)