Home
Workspace
Klise
Target
Seer
Signals
Competitors
Contacts
Log in
Seer/Prospects/Prism Electric Inc
Back to prospects

Prism Electric Inc

AUSTIN, TX · Outside service region

AnalysisCompany profileContactsEmail draftSources

Analysis

Overall 7 / 20Tier C
Keyword
Seer chat
1 / 5
0 keyword-matching signals in the last 90 days.
Freshness5 / 5Latest signal is within 30 days.
Place0 / 5TX is outside the seller’s region and target regions.
Target fit1 / 5No target company types set; baseline is 1 star.

Company profile

Company
Prism Electric Inc
Source for Company (opens in new tab)
Signal source
Austin issued construction permits
Signal date
Nov 9, 2026
Source for Signal date (opens in new tab)
Signal count
58 saved signals, 11 in the last 90 days
Signal summary
Electrical Permit · ePlan: Commercial Expedited Review - [PULBLIC PROJECT] New Construction of Austin Convention Center - Area 4.
Source for Signal summary (opens in new tab)
Address
2985 Market, Garland, 75041-____
Source for Address (opens in new tab)
Phone
5129262000
Source for Phone (opens in new tab)
Email
Not found
Website
Not found
Decision maker
Not found
DM title
Not found

Contacts

No contact found

Phone: not found · See the source record

Log in to search contacts

Email draft

Add a contact before generating a draft.

Sources

58 signals
  • Nov 9, 2026
    Permit
    Electrical Permit · ePlan: Commercial Expedited Review - [PULBLIC PROJECT] New Construction of Austin Convention Center - Area 4.
    No product keyword matched · Austin issued construction permits
    Source record (opens in new tab)
  • Nov 9, 2026
    Permit
    Electrical Permit · ePlan: Commercial Expedited Review - [PULBLIC PROJECT] New Construction of Austin Convention Center - Area 1.
    No product keyword matched · Austin issued construction permits
    Source record (opens in new tab)
  • Nov 9, 2026
    Permit
    Electrical Permit · ePlan: Commercial Expedited Review - [PULBLIC PROJECT] New Construction of Austin Convention Center - Area 3.
    No product keyword matched · Austin issued construction permits
    Source record (opens in new tab)
  • Nov 4, 2026
    Permit
    Electrical Permit · INTERIOR REMODEL - EXISTING OFFICE SPACE DEMO FINISHES AND MEP AS SHOWN ON THE PLANS.
    No product keyword matched · Austin issued construction permits
    Source record (opens in new tab)
  • Oct 28, 2026
    Permit
    Electrical Permit · ePlan: Commercial Expedited Review - Interior Remodel to Existing 5th Floor- New Inpatient Units with NCCU and Universal Care Beds (372026 SF).
    No product keyword matched · Austin issued construction permits
    Source record (opens in new tab)
  • Oct 6, 2026
    Permit
    Building Permit · Installation of Building UPS System for Building 2000
    No product keyword matched · Austin issued construction permits
    Source record (opens in new tab)
  • Oct 1, 2026
    Permit
    Electrical Permit · We are fixing an AE meter enclosure on a 175amp 120/208v 3phase service. We have to have it permitted because the AE is going to have to shut down this building/transformer.
    No product keyword matched · Austin issued construction permits
    Source record (opens in new tab)
  • Sep 25, 2026
    Permit
    Electrical Permit · Interior remodel existing hospital areas. CT-2 (1st Floor)
    No product keyword matched · Austin issued construction permits
    Source record (opens in new tab)
  • Sep 25, 2026
    Permit
    Electrical Permit · Interior remodel existing hospital areas. Xray 5
    No product keyword matched · Austin issued construction permits
    Source record (opens in new tab)
  • Aug 27, 2026
    Permit
    Electrical Permit · Addition of two (2) natural gas backup generators on a leveling pad on existing concrete.
    No product keyword matched · Austin issued construction permits
    Source record (opens in new tab)
  • Aug 27, 2026
    Permit
    Electrical Permit · ePlan: BAUS - First Time Finish out of New Airline Lounge (20500 SF)
    No product keyword matched · Austin issued construction permits
    Source record (opens in new tab)
  • Aug 10, 2026
    Permit
    Electrical Permit · ePlan: Commercial Expedited Review - Interior Remodel to Existing Energy X Office Building (2575 SF)
    No product keyword matched · Austin issued construction permits
    Source record (opens in new tab)
  • Aug 6, 2026
    Permit
    Electrical Permit · 46000 SF of Level I and II interior renovations (IEBC) to an existing building for Round Rock ISD & minor site improvements.
    No product keyword matched · Austin issued construction permits
    Source record (opens in new tab)
  • Aug 4, 2026
    Permit
    Electrical Permit · ePlan: Commercial Expedited Review - Interior Remodel to Existing Emergency Department at Hospital - Phase 2 (1007145 SF)
    No product keyword matched · Austin issued construction permits
    Source record (opens in new tab)
  • Jul 31, 2026
    Permit
    Electrical Permit · Interior remodel of existing space. Demo and install new partition walls new finished and lighting fixtures. Existing business offices.
    No product keyword matched · Austin issued construction permits
    Source record (opens in new tab)
  • Jul 15, 2026
    Permit
    Electrical Permit · Install new CT can that needs Austin Energys design
    No product keyword matched · Austin issued construction permits
    Source record (opens in new tab)
  • Jun 16, 2026
    Permit
    Electrical Permit · (3600 Presidential Blvd) Interior renovations within an existing building for virtual ramp control system improvements; includes finishing of existing space (paint carpet electrical desk and monitor installation) for control room. Electrical and communications (2901 Employee Ave) Interior renovations with an existing building for virtual ramp control system improvements. Electrical and communications work proposed (3011 Employee Ave). [Control Rooms Permits]
    No product keyword matched · Austin issued construction permits
    Source record (opens in new tab)
  • Jun 16, 2026
    Permit
    Electrical Permit · Construction of structural towers attached to main terminal building stairwells and light poles to allow camera installation for Virtual Ramp Control System. Work proposed in electrical rooms IT rooms etc. with new conduits/circuits (power and signal) being run from those rooms. Mechanical work proposes installation of compressor systems that go with the camera houses. These are dedicated systems that SAAB maintains and do not connect to any HVAC or other airport mechanical systems. Infrastructure (electrical =mechanical) for powering and maintaining camera systems. [Airside Permits]
    No product keyword matched · Austin issued construction permits
    Source record (opens in new tab)
  • May 19, 2026
    Permit
    Electrical Permit · Interior remodel of medical office tenant space in existing 7-story office building
    No product keyword matched · Austin issued construction permits
    Source record (opens in new tab)
  • May 1, 2026
    Permit
    Electrical Permit · Remodel existing 1st floor hospital areas.
    No product keyword matched · Austin issued construction permits
    Source record (opens in new tab)