Relocating light fixtures in the first and second floor office spaces. New lighting controls for new conference rooms. New circuits with receptacles for general purpose, furniture connections and equipment. [9/21/26 KEF - Plan set approved.] · Electrical
No product keyword matched · Seattle electrical permits
Install new LED lighting and controls in warehouse space. Install new circuits with receptacles for general purpose use and for equipment and furniture connections. [9/21/26 BGO - Approved Plan Set] · Electrical
No product keyword matched · Seattle electrical permits
Installing a new wall mounted telecom cabinet and Cat6 patch panels sized for cable count along with cabling to workstations within the office space · Electrical
No product keyword matched · Seattle electrical permits
For the big festival the church is putting on in July, our event planning team recently found out that the city has updated their Special Event permit application and now there is an Electrical Permit required for the temporary power needed for the festival. We have / have always used (2) 50A temp sub panels · Electrical
No product keyword matched · Seattle electrical permits
The Intent of this project is to increase the output of the 35 existing EV Chargers from 16A to 30A- thus allowing more vehicles to charge each day. To accomplish this, we will install a second 150kva transformer and a 500A panel alongside the existing transformer and panel of the same size, then move half the EV chargers to this new panel. The existing main lug panel board will also be replaced with a main breaker type in order to maximize the availale footprint. A 30 day load study was just p · Electrical
No product keyword matched · Seattle electrical permits
THE INTENT OF THIS PROJECT IS TO PROVIDED A NEW ELECTRIC SERVICE IN THE BASEMENT BOILER
ROOM OF THE BUDDHIST TEMPLE, A PRIMARILY RELIGIOUS FACILITY WITH OFFICES AND A
GYMNASIUM/AUDITORIUM.
MUCH OF THE EXISTING HVAC EQUIPMENT IS BEING REPLACED WITH NEW, ALL HEATING AND COOKING
WILL EVENTUALLY BE ELECTRIC.
MOST OF THE BRANCH CIRCUIT PANELBOARDS AND FEEDERS ARE ALSO BEING REPLACED · Electrical