Home
Workspace
Klise
Target
Seer
Signals
Competitors
Contacts
Log in
Seer/Prospects/MASTERCRAFT ELECTRIC, INC.
Back to prospects

MASTERCRAFT ELECTRIC, INC.

SEATTLE, WA · Outside service region

AnalysisCompany profileContactsEmail draftSources

Analysis

Overall 7 / 20Tier C
Keyword
Seer chat
1 / 5
0 keyword-matching signals in the last 90 days.
Freshness5 / 5Latest signal is within 30 days.
Place0 / 5WA is outside the seller’s region and target regions.
Target fit1 / 5No target company types set; baseline is 1 star.

Company profile

Company
MASTERCRAFT ELECTRIC, INC.
Source for Company (opens in new tab)
Signal source
Seattle electrical permits
Signal date
Nov 9, 2026
Source for Signal date (opens in new tab)
Signal count
40 saved signals, 9 in the last 90 days
Signal summary
Replace current under bar lights with new LED lights · Electrical
Source for Signal summary (opens in new tab)
Address
Not found
Phone
Not found
Email
Not found
Website
Not found
Decision maker
Not found
DM title
Not found

Contacts

No contact found

Phone: not found · See the source record

Log in to search contacts

Email draft

Add a contact before generating a draft.

Sources

40 signals
  • Nov 9, 2026
    Permit
    Replace current under bar lights with new LED lights · Electrical
    No product keyword matched · Seattle electrical permits
    Source record (opens in new tab)
  • Oct 28, 2026
    Permit
    Adding 10 notification devices and 2 relays to the existing fire alarm system. · Electrical
    No product keyword matched · Seattle electrical permits
    Source record (opens in new tab)
  • Oct 22, 2026
    Permit
    CORPORATE TENANT IMPROVEMENT PROJECT AREA 4,313 SF OFFICE POWER AND LIGHTING 250A PANEL, 45KVA TRANSFORMER & 150A PANEL · Electrical
    No product keyword matched · Seattle electrical permits
    Source record (opens in new tab)
  • Oct 19, 2026
    Permit
    Install a 30A temp power whip · Electrical
    No product keyword matched · Seattle electrical permits
    Source record (opens in new tab)
  • Oct 8, 2026
    Permit
    We're adding an EV Charger to this home (Unit 601- parking stall 38) · Electrical
    No product keyword matched · Seattle electrical permits
    Source record (opens in new tab)
  • Oct 1, 2026
    Permit
    Swap out existing lighting with new LED fixtures. · Electrical
    No product keyword matched · Seattle electrical permits
    Source record (opens in new tab)
  • Sep 30, 2026
    Permit
    Disconnect and then reconnect power to rooftop 9 HVAC units · Electrical
    No product keyword matched · Seattle electrical permits
    Source record (opens in new tab)
  • Sep 21, 2026
    Permit
    Relocating light fixtures in the first and second floor office spaces. New lighting controls for new conference rooms. New circuits with receptacles for general purpose, furniture connections and equipment. [9/21/26 KEF - Plan set approved.] · Electrical
    No product keyword matched · Seattle electrical permits
    Source record (opens in new tab)
  • Sep 21, 2026
    Permit
    Install new LED lighting and controls in warehouse space. Install new circuits with receptacles for general purpose use and for equipment and furniture connections. [9/21/26 BGO - Approved Plan Set] · Electrical
    No product keyword matched · Seattle electrical permits
    Source record (opens in new tab)
  • Aug 7, 2026
    Permit
    Cat6 cabling to install cord drops for warehouse workstations · Electrical
    No product keyword matched · Seattle electrical permits
    Source record (opens in new tab)
  • Aug 7, 2026
    Permit
    Installing a new wall mounted telecom cabinet and Cat6 patch panels sized for cable count along with cabling to workstations within the office space · Electrical
    No product keyword matched · Seattle electrical permits
    Source record (opens in new tab)
  • Jul 21, 2026
    Permit
    Locate and extend the closest, constant hot, 120V circuit, to the new ADA door opener for power.power · Electrical
    No product keyword matched · Seattle electrical permits
    Source record (opens in new tab)
  • Jul 14, 2026
    Permit
    For the big festival the church is putting on in July, our event planning team recently found out that the city has updated their Special Event permit application and now there is an Electrical Permit required for the temporary power needed for the festival. We have / have always used (2) 50A temp sub panels · Electrical
    No product keyword matched · Seattle electrical permits
    Source record (opens in new tab)
  • Jul 9, 2026
    Permit
    Running power to new ice machine · Electrical
    No product keyword matched · Seattle electrical permits
    Source record (opens in new tab)
  • Jul 9, 2026
    Permit
    designate two 30Amp circuits for HVAC · Electrical
    No product keyword matched · Seattle electrical permits
    Source record (opens in new tab)
  • Jun 30, 2026
    Permit
    outlet for portable AC unit · Electrical
    No product keyword matched · Seattle electrical permits
    Source record (opens in new tab)
  • Jun 24, 2026
    Permit
    Paint Booth Bell · Electrical
    No product keyword matched · Seattle electrical permits
    Source record (opens in new tab)
  • Jun 18, 2026
    Permit
    Temp power connect/disconnect whip · Electrical
    No product keyword matched · Seattle electrical permits
    Source record (opens in new tab)
  • Jun 8, 2026
    Permit
    The Intent of this project is to increase the output of the 35 existing EV Chargers from 16A to 30A- thus allowing more vehicles to charge each day. To accomplish this, we will install a second 150kva transformer and a 500A panel alongside the existing transformer and panel of the same size, then move half the EV chargers to this new panel. The existing main lug panel board will also be replaced with a main breaker type in order to maximize the availale footprint. A 30 day load study was just p · Electrical
    No product keyword matched · Seattle electrical permits
    Source record (opens in new tab)
  • Jun 8, 2026
    Permit
    THE INTENT OF THIS PROJECT IS TO PROVIDED A NEW ELECTRIC SERVICE IN THE BASEMENT BOILER ROOM OF THE BUDDHIST TEMPLE, A PRIMARILY RELIGIOUS FACILITY WITH OFFICES AND A GYMNASIUM/AUDITORIUM. MUCH OF THE EXISTING HVAC EQUIPMENT IS BEING REPLACED WITH NEW, ALL HEATING AND COOKING WILL EVENTUALLY BE ELECTRIC. MOST OF THE BRANCH CIRCUIT PANELBOARDS AND FEEDERS ARE ALSO BEING REPLACED · Electrical
    No product keyword matched · Seattle electrical permits
    Source record (opens in new tab)