Companies with dated public signals, ranked by fit with your products.
| Tier | Company | Score | Latest signal | Signals 90d | Last signal |
|---|---|---|---|---|---|
| B | 374 FULTON ASSOCIATES LLC NYC DOB building permits | 11 | Sign · ILLUMINATED NON-ADVERTISING DOUBLE-FACE PROJECTING ACCESSORY SIGN - APPLE BANK. NO CHANGE OF USE, EGRESS OR OCCUPANCY. No product keyword matched | 1 | Oct 26, 2026 |
| B | COBURN CONSTRUCTION MANAG NYC DOB building permits |
| 11 |
Construction Fence · INSTALL A TEMPORARY CONSTRUCTION WOOD FENCE AS SHOWN ON DRAWING. FILED IN CONJUNCTION WITH CONSTRUCTION APPLICATION NUMBER B00953069-I1. No product keyword matched |
| 6 |
| Oct 26, 2026 |
| B | JUST RENOVATIONS & GC LLC NYC DOB building permits | 11 | General Construction · APARTMENT 1E KITCHEN CEILING RESTORATION INCLUDING REPLACEMENT OF CEILING JOIST. NO CHANGE IN USE, EGRESS OR OCCUPANCY No product keyword matched | 2 | Oct 26, 2026 |
| B | KLEEN CONSTRUCTION LLC NYC DOB building permits | 11 | Mechanical Systems · This Alteration application is being filed for the mechanical work in conjunction with Alt CO application #B00777324-I1 as per plans filed herewith. There are no change of use, egress or occupancy under this application. No product keyword matched | 1 | Oct 26, 2026 |
| B | SUPERIOR PLUMBING & HEATI NYC DOB building permits | 11 | Plumbing · Plumbing related to combination of apt 18a & 18b No product keyword matched | 2 | Oct 26, 2026 |
| B | AM&G WATERPROOFING LLC NYC DOB building permits | 11 | General Construction · Replace main and bulkhead roofs and facade repairs as plans filed herewith. No change in use, occupancy or egress. No product keyword matched | 26 | Oct 26, 2026 |
| B | VOLMAR CONSTRUCTION INC. NYC DOB building permits | 11 | General Construction · INTERIOR RENOVATION OF EXISTING BUILDING, NEW FINISHES, NEW INTERIOR & EXTERIOR LIGHTING, REPLACEMENT OF WINDOWS & DOORS AND REPLACEMENT OF KITCHEN & BATHROOM FIXTURES IN EXISTING LOCATIONS. MINOR MASONRY REPAIR, MINOR FACADE WORK, AND ROOFING REPLACEMENT No product keyword matched | 3 | Oct 26, 2026 |
| B | WEDGEWOOD TENANTS CORP NYC DOB building permits | 11 | Sidewalk Shed · TEMPORARY INSTALLATION AND USE OF SIDEWALK SHED AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY. No product keyword matched | 3 | Oct 26, 2026 |
| B | E B H HOLDING LLC NYC DOB building permits | 11 | Construction Fence · INSTALL 8' TEMPORARY CONSTRUCTION FENCE AT THE ABOVE ADDRESS No product keyword matched | 6 | Oct 26, 2026 |
| B | PARK USA DESIGN & REMODEL NYC DOB building permits | 11 | Mechanical Systems · MECHANICAL WORK PROPOSED SUPERMARKET UNDER THE FRESH PROGRAM AT THE FIRST AND CELLAR FLOOR. INSTALL A NEW COMMERCIAL KITCHEN EXHAUST HOOD, DUCTWORK AT KITCHEN AND EXHAUST FAN ON THE ROOF. No product keyword matched | 5 | Oct 26, 2026 |
| B | CONCEPTUAL CONSTRUCTION NYC DOB building permits | 11 | General Construction · Interior renovation to existing apartment #11A. Work to include non-structural demolition, general construction and finishes, as per plans filed herewith. No change in use, egress or occupancy proposed under this application. No product keyword matched | 2 | Oct 26, 2026 |
| B | LARGAVISTA COMPANIES NYC DOB building permits | 11 | Structural · Structural Work No product keyword matched | 3 | Oct 26, 2026 |
| B | 60 WEST 57 REALTY INC NYC DOB building permits | 11 | Suspended Scaffold · INSTALLATION OF SUSPENDED SCAFFOLD EQUPMENT TO ACCESS FACADE WORK AND FACADE INSPECTIONS. No product keyword matched | 2 | Oct 26, 2026 |
| B | EDWARDS SISTERS REALTY NYC DOB building permits | 11 | General Construction · Filing for limited exterior repairs at E1 and E2 facades. No change in use, egress, or occupancy. No product keyword matched | 1 | Oct 26, 2026 |
| B | BILTMORE GENERAL CONTRACT NYC DOB building permits | 11 | Structural · Application file in conjunction with GC application #S01280723-I1. No product keyword matched | 2 | Oct 26, 2026 |
| B | ELBE CONSTRUCTION LLC NYC DOB building permits | 11 | General Construction · ordinary facade repairs are south elevation, parapet repairs and cornice removal as per plans. No product keyword matched | 1 | Oct 26, 2026 |
| B | GALLERY RESTORATION LTD NYC DOB building permits | 11 | Mechanical Systems · REPLACEMENT OF FIVE (5) FAN COIL UNITS TIED TO EXISTING BASE-BUILDING 2-PIPE HEATING/COOLING SYSTEM. NO CHANGE TO VENTILATION SYSTEMS. NO CHANGE TO USE, OCCUPANCY OR EGRESS. No product keyword matched | 4 | Oct 26, 2026 |
| B | EMPHASIS CONSTRUCTION LLC NYC DOB building permits | 11 | Mechanical Systems · COMBINATION OF APTS 14CF FILED UNDER TPPN 3/97 FILED IN CONJUNCTION WITH DOB NOW PL. NO CHANGE TO USE, OCCUPANCY OR EGRESS. No product keyword matched | 2 | Oct 26, 2026 |
| B | KATONAH PROPERTY MGMT CORP NYC DOB building permits | 11 | Plumbing · SUBSEQUENT FILING OF PLUMBING & SPRINKLER (OFF DOMESTIC) WORK IN CONJUNCTION WITH DOB#X01459528-I1. (GC: LAUNDRY) WORK INCLUDES INSTALLATION OF NEW WASHERS & DRYERS, SPRINKER HEADS AS PER THE PLANS HEREWITH. NO CHNAGE IN USE, EGRESS, AND OCCUPANCY. No product keyword matched | 4 | Oct 26, 2026 |
| B | FALCON CONSTRUCTION & DEV NYC DOB building permits | 11 | General Construction · APPLICATION HEREWITH FILED FOR INTERIOR RENOVATION OF CELLAR INCLUDING DEMO OF NON-LOAD-BEARING PARTITION WALLS, NEW FIRE-RATED PARTITION WALLS & NEW FPSC DOORS. NO CHANGE TO USE, OCCUPANCY, EGRESS, OR BULK. No product keyword matched | 2 | Oct 26, 2026 |
| B | PYRUS MANAGEMENT LLC NYC DOB building permits | 11 | Plumbing · FILED HEREWITH FOR CONNECTION OF AN EXISTING GAS METER TO SERVE A NEW GAS-FIRED OVEN REPLACING AN EXISTING ELECTRIC OVEN. NO CHANGE TO USE, OCCUPANCY, OR MEANS OF EGRESS UNDER THIS APPLICATION. No product keyword matched | 1 | Oct 26, 2026 |
| B | TA & MT CONSTRUCTION INC NYC DOB building permits | 11 | Foundation · FOUNDATION & SPECIFICATIONS FOR EXISTING (2) STORY BUILDING AND CELLAR No product keyword matched | 7 | Oct 26, 2026 |
| B | 2155 MORRIS, LLC NYC DOB building permits | 11 | Plumbing · INSTALL DIRECT VENTED HOT WATER HEATERS AND GAS PIPING. No product keyword matched | 1 | Oct 26, 2026 |
| B | SHERWOOD EQUITIES, INC. NYC DOB building permits | 11 | Mechanical Systems · Herewith filing for the install of new partitions and hvac unit as shown in plan. plumbing filed separately. No product keyword matched | 2 | Oct 26, 2026 |
| B | MARLEX MANAGEMENT INC NYC DOB building permits | 11 | General Construction · INTERIOR RENOVATION OF APT 5H No product keyword matched | 2 | Oct 26, 2026 |
| B | 532 NEPTUNE AVENUE NYC DOB building permits | 11 | Sprinklers · MODIFICATION TO EXISTING SPRINKLER SYSTEM AS PER NEW TENANT LAY OUT. FILED IN CONJUNCTION WITH CONSTRUCTION APPLICATION # B01452278-I1. No product keyword matched | 8 | Oct 26, 2026 |
| B | NY BROOKLYN BREAD NYC DOB building permits | 11 | Plumbing · PROPOSED INSTALLATION OF PLUMBING, GAS AND STORMWATER FIXTURES AND ASSOCIATED PIPING FOR A NEW TWO-FAMILY DETACHED RESIDENCE. No product keyword matched | 1 | Oct 26, 2026 |
| B | IRVINE REALTY GROUP NYC DOB building permits | 11 | General Construction · Exterior repairs at north and south elevations, including resealing joints, balcony concrete repairs. No change to use, egress, or occupancy. No product keyword matched | 4 | Oct 26, 2026 |
| B | GO HPS LLC NYC DOB building permits | 11 | Sign · INSTALLATION OF AN ILLUMINATED BUSINESS ACCESSORY SIGN . NO CHANGE IN USE, EGRESS OR OCCUPANCY. No product keyword matched | 2 | Oct 26, 2026 |
| B | MENTORS CONSTRUCTION INC NYC DOB building permits | 11 | Mechanical Systems · Installation of mechanical systems in conjunction with renovation of apartment residence. Installation of new split system air conditioners and associated ductwork. No change to use, egress, or occupancy. No product keyword matched | 3 | Oct 26, 2026 |
| B | LEVEL UP PLUMBING CORP NYC DOB building permits | 11 | Sprinklers · Gut renovation of an existing single-family. Sprinkler work as per plans filed herewith. No change in use, egress, or occupancy. No product keyword matched | 8 | Oct 26, 2026 |
| B | PARK AVENUE ARMORY NYC DOB building permits | 11 | Structural · Installation of temporary performance platforms. No product keyword matched | 4 | Oct 26, 2026 |
| B | WHITE ROSE ARTISTS CORP. NYC DOB building permits | 11 | Mechanical Systems · NEW MECHANICAL SYSTEM WITH VRF UNITS & ASSOCITED DUCTS & PIPING IN CONJUCTION WITH ALL APPLICABLE CODES AND ASSOCIATED DOB FILINGS AS STATED ON PLAN. NO CHANGE TO USE, OCCUPANCY OR EGRESS. No product keyword matched | 5 | Oct 26, 2026 |
| B | TOWER ISLES FROZEN FOODS LTD NYC DOB building permits | 11 | Mechanical Systems · REPLACE, RELOCATE AND REFURBISH EXISTING ROOFTOP CONDENSING UNIT ON EXISTING DUNNAGE. NO CHANGE IN USE, EGRESS OR OCCUPANCY. No product keyword matched | 1 | Oct 26, 2026 |
| B | 101 Greenwich Property Owner LLC NYC DOB building permits | 11 | Construction Fence · INSTALLATION OF CONSTRUCTION FENCE AND HEAVY DUTY SIDEWALK SHED AS PER PLANS. TEMPORARY EQUIPMENT SHALL COMPLY WITH CHAPTER #33 OF THE 2022 CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION. No product keyword matched | 1 | Oct 26, 2026 |
| B | partner NYC DOB building permits | 11 | Construction Fence · temporary construction fence; 8' high at lot lines No product keyword matched | 1 | Oct 26, 2026 |
| B | SAMSON BUILDING CONSULTAN NYC DOB building permits | 11 | General Construction · PREPARE ARCHITECTURAL DRAWINGS IN RESPONSE TO DOB COMPLAINT NO. 3A77696 FOR DOB REVIEW AND PERMITTING. DRAWINGS SHALL DOCUMENT THE EXISTING ENCLOSED GARAGE MEZZANINE AND SHOW THE EXISTING AND PROPOSED GARAGE LAYOUT, MEZZANINE, ACCESS, AND RELATED BUILDING No product keyword matched | 1 | Oct 26, 2026 |
| B | DINO KOLJENOVIC BDC CORP NYC DOB building permits | 11 | General Construction · proposed interior renovation , no change of use, egress or occupancuy. Wood stud partition wall to be removed @ 4th floor only refer to subsequent structural filing under this application. No product keyword matched | 3 | Oct 26, 2026 |
| B | KSW MECHANICAL,LLC NYC DOB building permits | 11 | Mechanical Systems · REPLACEMENT OF 4 TON SPLIT SYSTEM ON FLOOR 001 AND THE ROOF. NO CHANGE TO EGRESS, USE, OR OCCUPANCY. No product keyword matched | 1 | Oct 26, 2026 |
| B | FIRST STANDARD CONSTR INC NYC DOB building permits | 11 | General Construction · CONSTRUCT NEW MIXED USE BUILDING 6 STORIES + CELLAR. No product keyword matched | 4 | Oct 26, 2026 |
| B | CONCEPT NATIONAL, LLC NYC DOB building permits | 11 | Plumbing · RECONNECT GAS LINE TO DIRECT REPLACEMENT OF ROOFTOP HVAC UNIT. No product keyword matched | 2 | Oct 26, 2026 |
| B | 205 E78TH ST NYC DOB building permits | 11 | Plumbing · Plumbing work is proposed in the existing unit #2RS on the 2nd floor. Initial general construction application has been filed. No changes to use, egress, or occupancy under this application. No product keyword matched | 2 | Oct 26, 2026 |
| B | COLIN CONSTRUCTION CO.INC NYC DOB building permits | 11 | Structural · HEREWITH FILING STRUCTURAL MODIFICATIONS FOR INTERIOR FIT-OUT PER PLANS. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION. No product keyword matched | 2 | Oct 26, 2026 |
| B | JC CONSULTING & MANAGEME* NYC DOB building permits | 11 | Support of Excavation · SOE IN CONJUNCTION WITH ALTERATION No product keyword matched | 6 | Oct 26, 2026 |
| B | BATH & KITCHEN INC NYC DOB building permits | 11 | General Construction · MERGING AND INTERIOR RENOVATION OF APT 12MN, MINOR DEMOLITION OF NON-LOAD BEARING PARTITIONS, FINISHING WORK, AND PAINTING. ALL AS PER PLANS AND APPLICATIONS. NO CHANGE TO USE, EGRESS OR OCCUPANCY. AS PER TPPN#3 No product keyword matched | 3 | Oct 26, 2026 |
| B | HIGH PRIORITY BUILDERS INC NYC DOB building permits | 11 | Construction Fence · PROPOSED 8' HIGH TEMPORARY CONSTRUCTION FENCE No product keyword matched | 1 | Oct 26, 2026 |
| B | The Safe Foundation NYC DOB building permits | 11 | General Construction · Application filed to combine #251 and #255 Avenue W, Block 7150, Lots 36 & 37. Also, a building renovation including a horizontal enlargement with a change in use, egress and occupancy under this application. Subsequent filings filed for FO,ST,PL & MS No product keyword matched | 2 | Oct 26, 2026 |
| B | INSPARISK NYC DOB building permits | 11 | Sprinklers · Modification to existing plumbing system. New sprinkler heads on first floor. No product keyword matched | 2 | Oct 26, 2026 |
| B | PIPEWORKS NYC INC NYC DOB building permits | 11 | Plumbing · INSTALL NEW GAS SERVICE FOR THE BUILDING, (1) NEW GAS METER AND NEW GAS PIPING TO NEW BOILER CONVERTED FROM OIL TO GAS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. No product keyword matched | 4 | Oct 26, 2026 |
| B | I.M.P. Plumbing & Heating CORP. NYC DOB building permits | 11 | Sprinklers · Propose to install sprinkler system as per plans filed herewith. No change in use egress or occupancy is proposed under this application. No product keyword matched | 6 | Oct 26, 2026 |