Home
Workspace
Klise
Target
Seer
Signals
Competitors
Contacts
Log in
Seer/Prospects/VOLMAR CONSTRUCTION INC.
Back to prospects

VOLMAR CONSTRUCTION INC.

Bronx, BRONX, Brooklyn, NY · Outside service region

AnalysisCompany profileContactsEmail draftSources

Analysis

Overall 11 / 20Tier B
Keyword
Seer chat
0 / 5
No keyword-matching signal in the last 90 days.
Freshness5 / 5Latest signal is within 30 days.
Place5 / 5NY matches the seller’s region.
Target fit1 / 5No target company types set; baseline is 1 star.

Company profile

Company
VOLMAR CONSTRUCTION INC.
Source for Company (opens in new tab)
Signal source
NYC DOB building permits
Signal date
Oct 26, 2026
Source for Signal date (opens in new tab)
Signal count
11 saved signals, 3 in the last 90 days
Signal summary
General Construction · INTERIOR RENOVATION OF EXISTING BUILDING, NEW FINISHES, NEW INTERIOR & EXTERIOR LIGHTING, REPLACEMENT OF WINDOWS & DOORS AND REPLACEMENT OF KITCHEN & BATHROOM FIXTURES IN EXISTING LOCATIONS. MINOR MASONRY REPAIR, MINOR FACADE WORK, AND ROOFING REPLACEMENT
Source for Signal summary (opens in new tab)
Address
4400 SECOND AVENUE
Source for Address (opens in new tab)
Phone
Not found
Email
Not found
Website
Not found
Decision maker
Not found
DM title
Not found

Contacts

No contact found

Phone: not found · See the source record

Log in to search contacts

Email draft

Add a contact before generating a draft.

Sources

11 signals
  • Oct 26, 2026
    Permit
    General Construction · INTERIOR RENOVATION OF EXISTING BUILDING, NEW FINISHES, NEW INTERIOR & EXTERIOR LIGHTING, REPLACEMENT OF WINDOWS & DOORS AND REPLACEMENT OF KITCHEN & BATHROOM FIXTURES IN EXISTING LOCATIONS. MINOR MASONRY REPAIR, MINOR FACADE WORK, AND ROOFING REPLACEMENT
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)
  • Oct 26, 2026
    Permit
    General Construction · INTERIOR RENOVATION OF EXISTING BUILDING, NEW FINISHES, NEW INTERIOR & EXTERIOR LIGHTING, REPLACEMENT OF WINDOWS & DOORS AND REPLACEMENT OF KITCHEN & BATHROOM FIXTURES IN EXISTING LOCATIONS. MINOR MASONRY REPAIR, MINOR FACADE WORK AND ROOFING REPLACEMENT.
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)
  • Oct 26, 2026
    Permit
    General Construction · INTERIOR RENOVATION OF EXISTING BUILDING, NEW FINISHES, NEW INTERIOR & EXTERIOR LIGHTING, REPLACEMENT OF WINDOWS & DOORS AND REPLACEMENT OF KITCHEN & BATHROOM FIXTURES IN EXISTING LOCATIONS. MINOR MASONRY REPAIR, MINOR FACADE WORK, AND ROOF REPLACEMENT.
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)
  • May 5, 2026
    Permit
    Plumbing · INSTALL WASHER AND DRYERS FOR BUILDING TENANT'S ACCESSORY USE AT CELLAR. WORK INCLUDES PLUMBING PIPING, NEW SPRINKLER HEADS OFF EXISTING DOMESTIC WATER SYSTEM, AND DRYER VENTING. ALL AS PER PLAN. NO CHANGE IN EGRESS USE OR OCCUPANCY.
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)
  • May 5, 2026
    Permit
    Plumbing · INSTALL WASHER AND DRYERS FOR BUILDING TENANT'S ACCESSORY USE AT CELLAR. WORK INCLUDES PLUMBING PIPING, NEW SPRINKLER HEADS OFF EXISTING DOMESTIC WATER SYSTEM, AND DRYER VENTING. ALL AS PER PLAN. NO CHANGE IN EGRESS USE OR OCCUPANCY.
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)
  • Mar 20, 2026
    Permit
    Supported Scaffold · Installation of a temporary system scaffold per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)
  • Mar 2, 2026
    Permit
    Solar · Installation of 47.385 kw solar energy system on roof. No change of occupancy, use or egress.
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)
  • Jan 16, 2026
    Permit
    Plumbing · HE PROJECT SCOPE OF WORK INCLUDES THE INSTALLATION OF KITCHENETTESINKS AND ASSOCIATED PIPING AT ALL THIRD FLOOR TENANT SPACES (THIRD FLOOR TENANT SEPARATION WORK FILED SEPARATELY).
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)
  • Jan 9, 2026
    Permit
    General Construction · THE PROJECT CONSISTS OF 'WHITE BOX' / TENANT SEPARATION ALTERATIONS TOTHE THIRD FLOOR OF AN EXISTING OFFICE BUILDING. PROPOSED WORK INCLUDES NEW METAL STUD AND DRYWALL PARTITIONS, ACOUSTIC INSULATION, DOORS, MISC. CASEWORK, LIGHTING, POWER, AND PAINTING.
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)
  • Dec 11, 2025
    Permit
    Plumbing · INSTALL HEAT PUMP HOT WATER HEATING UNIT AND ASSOCIATED PLUMBING PIPING AS PER PLANS. NO CHANGE TO USE, OCCUPANCY OR EGRESS.
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)
  • Dec 8, 2025
    Permit
    Plumbing · INSTALL HEAT PUMP HOT WATER HEATING UNIT AND ASSOCIATED PLUMBING PIPING AS PER PLANS. NO CHANGE TO USE, OCCUPANCY OR EGRESS.
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)