Home
Workspace
Klise
Target
Seer
Signals
Competitors
Contacts
Log in
Seer/Prospects/IRVINE REALTY GROUP
Back to prospects

IRVINE REALTY GROUP

Manhattan, MANHATTAN, NY · Outside service region

AnalysisCompany profileContactsEmail draftSources

Analysis

Overall 11 / 20Tier B
Keyword
Seer chat
0 / 5
No keyword-matching signal in the last 90 days.
Freshness5 / 5Latest signal is within 30 days.
Place5 / 5NY matches the seller’s region.
Target fit1 / 5No target company types set; baseline is 1 star.

Company profile

Company
IRVINE REALTY GROUP
Source for Company (opens in new tab)
Signal source
NYC DOB building permits
Signal date
Oct 26, 2026
Source for Signal date (opens in new tab)
Signal count
13 saved signals, 4 in the last 90 days
Signal summary
General Construction · Exterior repairs at north and south elevations, including resealing joints, balcony concrete repairs. No change to use, egress, or occupancy.
Source for Signal summary (opens in new tab)
Address
86-88 HAUSMAN STREET
Source for Address (opens in new tab)
Phone
Not found
Email
Not found
Website
Not found
Decision maker
Not found
DM title
Not found

Contacts

No contact found

Phone: not found · See the source record

Log in to search contacts

Email draft

Add a contact before generating a draft.

Sources

13 signals
  • Oct 26, 2026
    Permit
    General Construction · Exterior repairs at north and south elevations, including resealing joints, balcony concrete repairs. No change to use, egress, or occupancy.
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)
  • Oct 22, 2026
    Permit
    Suspended Scaffold · FACADE REPAIRS, SCAFFOLD INSPECTIONS, THREE MEN LETTER
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)
  • Oct 19, 2026
    Permit
    Suspended Scaffold · FACADE REPAIRS, SCAFFOLD INSPECTIONS, THREE MEN LETTER
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)
  • Sep 17, 2026
    Permit
    General Construction · This project includes general construction work associated with the renovation of a penthouse apartment and adjoining roof terraces. There is no change proposed to use, egress, or occupancy whatsoever.
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)
  • Jun 2, 2026
    Permit
    Plumbing · The scope of work includes plumbing associated with the interior renovation of an existing penthouse apartment. There is no exterior work proposed. There is no change proposed to use, egress, or occupancy.
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)
  • May 28, 2026
    Permit
    General Construction · GENERAL CONSTRUCTION SCOPE OF WORK: NEW NON-STRUCTURAL PARTITIONS AND MILLWORK, NEW CABINETRY, FLOORING, DOORS DROPPED CEILINGS AND FNISHES.NO CHANGE TO USE OCCUPANCY OR EGRESS
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)
  • May 21, 2026
    Permit
    Plumbing · PLUMBING SCOPE OF WORK: NEW, REPLACED & RELOCATED FIXTURES AS PER PLANSFILED. NO CHANGE TO USE OCCUPANCY OR EGRESS
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)
  • Feb 10, 2026
    Permit
    General Construction · GENERAL CONSTRUCTION ARCHITECTURAL FOR THE RENOVATION OF EXISTING DUPLEX APARTMENT #4 ON THE 2ND & 3RD FLOORS. AS PER PLANS FILED HEREWITH. NO CHANGE OF USE, EGRESS, OR OCCUPANCY.
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)
  • Feb 5, 2026
    Permit
    General Construction · Renovation to unit #3A including bath and kitchenette. Relocation of non-bearing partitions.
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)
  • Feb 4, 2026
    Permit
    Mechanical Systems · REPLACE ONE (1) 25 TON AIR COOLED CHILLER ON ROOF.
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)
  • Jan 29, 2026
    Permit
    General Construction · GENERAL CONSTRUCTION SCOPE OF WORK: NEW NON-STRUCTURAL PARTITIONS AND MILLWORK, NEW CABINETRY, FLOORING, DOORS DROPPED CEILINGS AND FNISHES.NO CHANGE TO USE OCCUPANCY OR EGRESS
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)
  • Jan 27, 2026
    Permit
    Plumbing · PLUMBING WITH THE RENOVATION OF EXISTING DUPLEX APARTMENT #4 ON THE 2ND & 3RD FLOORS. AS PER PLANS FILED HEREWITH. NO CHANGE OF USE, EGRESS, OR OCCUPANCY.
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)
  • Jan 22, 2026
    Permit
    General Construction · GENERAL CONSTRUCTION ARCHITECTURAL FOR THE RENOVATION OF EXISTING DUPLEX APARTMENT #4 ON THE 2ND & 3RD FLOORS. AS PER PLANS FILED HEREWITH. NO CHANGE OF USE, EGRESS, OR OCCUPANCY.
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)