Mechanical Systems · Installation of mechanical systems in conjunction with renovation of apartment residence. Installation of new split system air conditioners and associated ductwork. No change to use, egress, or occupancy.
Mechanical Systems · Installation of mechanical systems in conjunction with renovation of apartment residence. Installation of new split system air conditioners and associated ductwork. No change to use, egress, or occupancy.
No product keyword matched · NYC DOB building permits
Structural · Construction of new stair opening and steel stair to Combine two apartments into a duplex (14E-15E).- NO CHANGE in Egress, Use, Occupancy or Zoning under this application.
No product keyword matched · NYC DOB building permits
General Construction · Apartment combination per TPPN 3/97 and associated interior renovation with new masonry openings at secondary facade as per plans filed herewith. No change to use, egress or occupancy.
No product keyword matched · NYC DOB building permits
General Construction · interior renovations on the 10th floor. Removal and replacement of non load-bearing partitions, floor and ceiling. renovations of existing kitchen and bathrooms at new proposed locations. No change in volume, use, occupancy, life safety, or egress.
No product keyword matched · NYC DOB building permits
General Construction · interior renovations on the 10th floor. Removal and replacement of non load-bearing partitions, floor and ceiling. renovations of existing kitchen and bathrooms at new proposed locations. No change in volume, use, occupancy, life safety, or egress.
No product keyword matched · NYC DOB building permits