Companies with dated public signals, ranked by fit with your products.
| Tier | Company | Score | Latest signal | Signals 90d | Last signal |
|---|---|---|---|---|---|
| C | Foundation Specialist Inc. Austin issued construction permits | 6 | Building Permit · Foundation repair - 6 exterior pilings No product keyword matched | 1 | Nov 4, 2026 |
| C | Premier Pools & Spa North Austin Austin issued construction permits | 6 |
Building Permit · Construction of new pool No product keyword matched |
| 1 |
| Nov 4, 2026 |
| C | Eleventh Street Partners LLC Austin issued construction permits | 6 | Building Permit · CHANGE OF USE RETAIL TO RESTAURANT health review and inspection for change of occupancy No product keyword matched | 1 | Nov 4, 2026 |
| C | Freedom Enterprizes Austin issued construction permits | 6 | Electrical Permit · Change of use from B (Admin/ Professional Offices) to Education for private school use. No product keyword matched | 1 | Nov 4, 2026 |
| C | Rise Electrical Contracting LLC Austin issued construction permits | 6 | Electrical Permit · Change of use to Liquor Store with remodel. No product keyword matched | 1 | Nov 4, 2026 |
| C | DNS DAVIS LLC DBA DUGGER ELECTRIC Austin issued construction permits | 6 | Electrical Permit · Interior Remodel to change occupancy from existing building to new tanning salon. new interior wall construction mechanical and electrical modifications minor plumbing No product keyword matched | 1 | Nov 4, 2026 |
| C | PERFORMANCE ELECTRIC INC. Seattle electrical permits | 6 | 5 SFR's · Electrical No product keyword matched | 23 | Nov 4, 2026 |
| C | Cardinal Heating & Air Seattle electrical permits | 6 | Adding dedicated circuit for Mitsubishi mini-split heat pump · Electrical No product keyword matched | 7 | Nov 4, 2026 |
| C | Kot Electric LLC Seattle electrical permits | 6 | Install heat trace system on sprinkler pipes · Electrical No product keyword matched | 21 | Nov 4, 2026 |
| C | BALLARD ELECTRICAL SERVICE Seattle electrical permits | 6 | converting basement into adu. Adding 2 seperate 125 amp services side by side. rewire basement · Electrical No product keyword matched | 1 | Nov 4, 2026 |
| C | MACKAM, LLC Seattle electrical permits | 6 | Ev Charger · Electrical No product keyword matched | 7 | Nov 4, 2026 |
| C | Evergreen Home Heating & Energy Seattle electrical permits | 6 | 240v 30 amp and GFCI · Electrical No product keyword matched | 54 | Nov 4, 2026 |
| C | DICKSON ELECTRIC LLC Seattle electrical permits | 6 | Hot water circuit · Electrical No product keyword matched | 12 | Nov 4, 2026 |
| C | Convergint Technologies Seattle electrical permits | 6 | Adding Access control system with 18 downstream devices. 12 cameras IP based. · Electrical No product keyword matched | 8 | Nov 4, 2026 |
| C | All Climate Inc Seattle electrical permits | 6 | Subpanel and adding EV charger · Electrical No product keyword matched | 7 | Nov 4, 2026 |
| C | Blossom Solar LLC Seattle electrical permits | 6 | 10.56 kW Photovoltaic Solar System · Electrical No product keyword matched | 5 | Nov 4, 2026 |
| C | Acacia electric llc Seattle electrical permits | 6 | sub panel added to detached garage, underground conduit 70'. circuits added for lights and outlets. · Electrical No product keyword matched | 4 | Nov 4, 2026 |
| C | Applied Technical Systems, Inc. Seattle electrical permits | 6 | Pulling Cat6 cabling to the new "Store Within a Store" located in the front corner of the store as well as the "Pickup Department" to the IDF located inside the electrical room. Installing 11 IP cameras and IP public view monitors inside the space. · Electrical No product keyword matched | 3 | Nov 4, 2026 |
| C | Spark Pro Electric LLC Seattle electrical permits | 6 | running 20 amp circuit for ev · Electrical No product keyword matched | 5 | Nov 4, 2026 |
| C | Sundance Energy Services Inc Seattle electrical permits | 6 | Adding a receptacle for a gas fireplace insert · Electrical No product keyword matched | 6 | Nov 4, 2026 |
| C | Meridian Center Electric Seattle electrical permits | 6 | I AM ROUGHING IN A 1,425 SQ FT DADU WITH A 125 AMP SUB PANEL. THERE WILL BE A CAR CHARGER AND STANDARD HOUSEHOLD CIRCUITS AND WIRING. FEEDER WILL BE ON THIS PERMIT, SERVICE WILL BE ATTACHED TO THE SINGLE FAMILY RESIDENCE ON THE SITE. WE WILL PULL A SEPERATE PERMIT FOR THE SERVICE · Electrical No product keyword matched | 9 | Nov 4, 2026 |
| C | Larrys Electric Inc Seattle electrical permits | 6 | Clone for 6518 A and B 37th Ave SW (plan review permit 7170399-EL)
new build 2 SFR 2 duplex units · Electrical No product keyword matched | 16 | Nov 4, 2026 |
| C | ENTRANCE CONTROLS INC Seattle electrical permits | 6 | 26395 - SPU NOC Doors - add power supply and door hardware · Electrical No product keyword matched | 31 | Nov 4, 2026 |
| C | Southlake Electric Seattle electrical permits | 6 | Wiring existing home and new garage · Electrical No product keyword matched | 5 | Nov 4, 2026 |
| C | NORTH ELECTRO SERVICE Seattle electrical permits | 6 | restaurant, Hood, Appliances, water heater, heat pump.
No service, panel is existing. · Electrical No product keyword matched | 2 | Nov 4, 2026 |
| C | Apex Mechanical Seattle electrical permits | 6 | Installing EV Charger · Electrical No product keyword matched | 10 | Nov 4, 2026 |
| C | oylear electric llc Seattle electrical permits | 6 | Installing a new 200 amp service · Electrical No product keyword matched | 1 | Nov 4, 2026 |
| C | Cub Electric Seattle electrical permits | 6 | Adding a new 240v 100-amp sub panel adjacent to the existing 200-amp panel. Adding 9 new 30-amp or less circuits to supply the new dwelling area being converted in the existing basement. All circuits in the 100-amp sub panel are new circuits. Includes lights, receptacles, smoke detectors and kitchen circuits. · Electrical No product keyword matched | 1 | Nov 4, 2026 |
| C | Clean Energy Innovators Seattle electrical permits | 6 | Existing 7-panel 3kW solar array to be removed for roof repairs, then reinstalled. · Electrical No product keyword matched | 2 | Nov 4, 2026 |
| C | RED WIRE ELECTRIC INC Seattle electrical permits | 6 | Temp power pole · Electrical No product keyword matched | 8 | Nov 4, 2026 |
| C | Weber Pros Inc. Seattle electrical permits | 6 | Access controls for the suite main entry door. · Electrical No product keyword matched | 3 | Nov 4, 2026 |
| C | Integrity Home Solutions NW, LLC Seattle electrical permits | 6 | 240 circuit from panel to ODU, 240v from air handler to ODU, GFCI at air handler, 120v outlet at ODU · Electrical No product keyword matched | 4 | Nov 4, 2026 |
| C | Reds Electrical Services, Inc. Seattle electrical permits | 6 | Electrical install of (1) 500amp MCP, (1) 500amp breaker for new MCP, (28) motor disconnects w/Aux contacts (4) VEO Twistlock receptacles, and (2) SWAKS. [11/4/26 KEF - Plan set approved.] · Electrical No product keyword matched | 1 | Nov 4, 2026 |
| C | Burke Electric LLC Seattle electrical permits | 6 | We are replacing (6) 15kv cables between EM2-01 - EM2-04, installing splices, and terminations. Then having the cables tested before final inspection and reenergization. [10-30-26 D Rankin - Waved review, replacement of failed 15kV cable and 5 others] · Electrical No product keyword matched | 1 | Nov 4, 2026 |
| C | Nueva Era Plumbing Services LLC Austin issued construction permits | 6 | Plumbing Permit · cap off permit No product keyword matched | 3 | Nov 3, 2026 |
| C | OFG Telecom USA LLC Austin issued construction permits | 6 | Building Permit · Replace existing antennas and radios at the existing transmission site. No product keyword matched | 1 | Nov 3, 2026 |
| C | Facility Solutions Group Austin issued construction permits | 6 | Electrical Permit · ePlan Review: Remodel Labs and Break Area - 1st Floor No product keyword matched | 18 | Nov 3, 2026 |
| C | Tiger Southwest, LLC Austin issued construction permits | 6 | Electrical Permit · Texas Capital is only taking half of floor 16. This will consist of offices & open office space and a beverage bar. No product keyword matched | 13 | Nov 3, 2026 |
| C | Aztec Electric Service Austin issued construction permits | 6 | Electrical Permit · Finish out for automotive repair. No product keyword matched | 1 | Nov 3, 2026 |
| C | Kinney's Commercial, Inc Austin issued construction permits | 6 | Plumbing Permit · ePlan: Commercial Expedited Review - Change of Use and Finish Out for Theater and Dance School in Space Previously Retuned to Shell in Phase I scope includes New Exterior Openings for Glazing and Shade Canopies Over Exits. Phase 2.2 (2025-052228PR) (150000 SF). No product keyword matched | 19 | Nov 3, 2026 |
| C | Sunvison Electric Austin issued construction permits | 6 | Electrical Permit · Upgrade existing 100A service on a structure to a 200A. No product keyword matched | 1 | Nov 3, 2026 |
| C | Leaky's Austin issued construction permits | 6 | Plumbing Permit · interior remodel - private offices storage room conference rooms reception area and break area No product keyword matched | 3 | Nov 3, 2026 |
| C | Cox Plumbing Company Austin issued construction permits | 6 | Plumbing Permit · 7 DAY - Tenant finish out of existing space - OVA No product keyword matched | 2 | Nov 3, 2026 |
| C | 1 Source Signs LLC Austin issued construction permits | 6 | Electrical Permit · Installation of (1) storefront sign to read Famsa Loans - Famsa to be an illuminated cabinet/box sign and Loans to be illuminated channel letters. No product keyword matched | 1 | Nov 3, 2026 |
| C | Freedom Solar Power Austin issued construction permits | 6 | Electrical Permit · Installing 187.62 PV rooftop solar in West lake Hills Jurisdiction No product keyword matched | 1 | Nov 3, 2026 |
| C | Global Tech Connections Austin issued construction permits | 6 | Plumbing Permit · we will be repairing the boiler waterline for building 13. the repairs will be on the exterior next to the boiler room attached next to building 13. No product keyword matched | 4 | Nov 3, 2026 |
| C | O.C. Electric Austin issued construction permits | 6 | Electrical Permit · New Construction of Multi-Family Building in ETJ
Bldg 7 House Service- 600A CT Cabinet CT-HB Panels HPB EVB No product keyword matched | 7 | Nov 3, 2026 |
| C | CH Electrical Services Inc. Austin issued construction permits | 6 | Electrical Permit · Interior remodel of existing retail space including new storefront. No plumbing scope. No fire alarm or sprinklers. No access control. No product keyword matched | 3 | Nov 3, 2026 |
| C | A&R Services Austin issued construction permits | 6 | Electrical Permit · ePlan: Commercial Expedited Review - Change of Use from Retail to Pilates Studio (2175 SF) No product keyword matched | 2 | Nov 3, 2026 |
| C | Exalted Solutions, LLC. Austin issued construction permits | 6 | Mechanical Permit · Replacement of complete existing central heat and air system with or without duct work Allen Stephens 4500 E Oltorf Street Unit 420 Austin TX 78741 No product keyword matched | 1 | Nov 3, 2026 |