Building Permit · AT&T proposes to - Tower SOW: Remove (3) RRu Radios (3) Diplexers & (10) 50A Coax. Decommission (3) RRUs B2 / B66 Radios (in place) Relocated (3) Air Antennas Install mount modification per mount analysis Install (3) Air Antennas Install (3) B25 / B66 Radios Ground SOW: Install (6) 50A DC Breakers in existing DC Power Plant
No product keyword matched · Austin issued construction permits
Building Permit · ATT is proposing to install on tower: (3) new radio antennas (3) new radio units (1) mount modification per plans attached. Ground work install: (1) 58V converter kit (1) 48V battery rack (1) DC converter (8) 190AH batteries (6) 50A DC breakers. No change of tower height nor footprint.
No product keyword matched · Austin issued construction permits
Building Permit · AT&T Proposes to - Tower SOW- Remove: (3) B66 RRUs (3) B2/B66 RRUs (3) E15Z01P13 TMAS 50A Coax. Relocate: (3) Air Antennas (3) RRUs. Install: (3) B77G Air Antennas (3) B25/B66 Radios Installation of mount modifications will be per plans. Ground SOW - Install: (6) 50A DC Breakers in existing DC power plant
No product keyword matched · Austin issued construction permits
Building Permit · AT&T is proposing to install on tower 1 mount modification per mount analysis included in plans 3 120726 antennas 3 Air 6419 antennas 3 Remote radio units RRU 3 Dual mount brackets. Ground scope of work to install 3 48V rectifiers 3 200A battery disconnect breakers 6 50A DC breakers and ancillary equipment
No product keyword matched · Austin issued construction permits