I AM ROUGHING IN A 1,425 SQ FT DADU WITH A 125 AMP SUB PANEL. THERE WILL BE A CAR CHARGER AND STANDARD HOUSEHOLD CIRCUITS AND WIRING. FEEDER WILL BE ON THIS PERMIT, SERVICE WILL BE ATTACHED TO THE SINGLE FAMILY RESIDENCE ON THE SITE. WE WILL PULL A SEPERATE PERMIT FOR THE SERVICE · Electrical
I AM ROUGHING IN A 1,425 SQ FT DADU WITH A 125 AMP SUB PANEL. THERE WILL BE A CAR CHARGER AND STANDARD HOUSEHOLD CIRCUITS AND WIRING. FEEDER WILL BE ON THIS PERMIT, SERVICE WILL BE ATTACHED TO THE SINGLE FAMILY RESIDENCE ON THE SITE. WE WILL PULL A SEPERATE PERMIT FOR THE SERVICE · Electrical
No product keyword matched · Seattle electrical permits
we are ripping out some old knob and tube and rewiring the middle floor, (with a kitchen) on other floors we are just repulling mostly a lighting circuit or so. [10/8/2026 PGF Added 125A feeder to permit per contractor email request (Tyler). Post-issuance change fee included.] · Electrical
No product keyword matched · Seattle electrical permits
320amp Service, rough-in & trim per 2023 NEC & 2021 Energy code (Seattle REquirements), elevator pre-wire, speaker pre-wire, (2) EV chargers · Electrical
No product keyword matched · Seattle electrical permits