Companies with dated public signals, ranked by fit with your products.
| Tier | Company | Score | Latest signal | Signals 90d | Last signal |
|---|---|---|---|---|---|
| B | CONSOLIDATED SCAFFOLD & BRIDGE CORP NYC DOB building permits | 11 | Sidewalk Shed · INSTALLATION OF A HEAVY DUTY SIDEWALK SHED AS PER PLANS DURING GENERAL CONSTRUCTION WORK. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED TO COMPLY WITH CHAPTER 33 OF NYC BUILDING CODE OF 2014. No product keyword matched | 4 | Nov 2, 2026 |
| B |
| 11 |
Plumbing · Modifications to existing plumbing system, as per plans filed herewith. No change in use, egress or occupancy. No product keyword matched |
| 5 |
| Nov 2, 2026 |
| B | BLETSAS P&H CORP NYC DOB building permits | 11 | Plumbing · INSTALLATION OF HOT WATER HEATER AND ASSOCIATE WATER PIPING. GAS PIPING IN SUPPORT OF BOILER REPLACEMENT FILING Q08029233. ONLY NEW GAS PIPING IN THE CELLAR. NO CHANGE TO EGRESS, USE, OR OCCUPANCY. No product keyword matched | 10 | Nov 2, 2026 |
| B | COHEN GLOBAL INC NYC DOB building permits | 11 | Foundation · PROPOSED UNDERPINNING WORK FILING #B01080774-S5 IN CONJUNCTION WITH G/C FILING#B01080774-I1 No product keyword matched | 17 | Nov 2, 2026 |
| B | 20810 47 AVE LLC NYC DOB building permits | 11 | Foundation · PROPOSE A NEW TWO STORY WITH TWO FAMILY HOUSE. OBTAIN NEW C OF O. No product keyword matched | 1 | Nov 2, 2026 |
| B | THE DANIEL GROUP NYC DOB building permits | 11 | Mechanical Systems · Filing of Mechanical system for proposed 6-story residential building. Refer to DOB NOW # Q01205884 for all zoning architectural aspects of the project. No product keyword matched | 9 | Nov 2, 2026 |
| B | ROCK GROUP NY CORP NYC DOB building permits | 11 | Sidewalk Shed · INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. LIVE LOAD 300 PSF. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE 2014 CODE NO CHANGE TO USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION. No product keyword matched | 10 | Nov 2, 2026 |
| B | AJC PLUMBING & HTG CORP NYC DOB building permits | 11 | Plumbing · PLUMBING WORK FOR INTERIOR RENOVATION OF BASEMENT FLOOR ONLY. NO WORK TO BE DONE ON 1ST AND 2ND FLOOR. NO CHANGE IN USE, OCCUPANCY, NUMBER OF FAMILIES OR EGRESS. ALSO TO CORRECT HPD COMPLAINTS AND/OR VIOLATIONS ON THE BASEMENT. No product keyword matched | 4 | Nov 2, 2026 |
| B | BREAKING GROUND NYC DOB building permits | 11 | Suspended Scaffold · FISP INSPECTION (Facade Inspection Safety Program). INDUSTRIAL ROPE ACCESS TECHNIQUES AND METHODS. SEE ATTACHED PLANS. Designated Primary Site supervisor: Jesus Decola No product keyword matched | 6 | Nov 2, 2026 |
| B | V&V DEVELOPMENT CORP NYC DOB building permits | 11 | Curb Cut · Installation of new 8' curb cut associated with new NB S00377880-I1 No product keyword matched | 8 | Nov 2, 2026 |
| B | HT PLUMBING & HEATING COR NYC DOB building permits | 11 | Plumbing · APPLICATION FILED TO LEGALIZE 3PC BATHROOM AND LAUDRY AREA.FILED TO REMOVE ECB/DOB VIOLATIONS. # 35498870M-35498871Y. NO CHANGE OF USE OR OCCUPANCY. No product keyword matched | 3 | Nov 2, 2026 |
| B | MTK CONTRACTING INC NYC DOB building permits | 11 | General Construction · INSTALL NEW THRU-WALL OPENING FOR NEW SLEEVE AT APT 15F ON THE 14TH FLOOR. NO CHANGE IN USE, EGRESS, OR OCCUPANCY UNDER THIS FILING. No product keyword matched | 3 | Nov 2, 2026 |
| B | ABOVE THE SKY INC NYC DOB building permits | 11 | Structural · PROPOSED MINOR ENLARGEMENT AT 2ND FLOOR AND ATTIC, SEE EXISTING INTERIORS REFURBISHED PER JOB B01193177-I1, NO CHANGES OF OCCUPANCY, USE AND/OR EGRESS TO EXISTING ONE-FAMILY HOUSE. No product keyword matched | 1 | Nov 2, 2026 |
| B | AP PLUMBING & HVAC LLC NYC DOB building permits | 11 | Sprinklers · SPRINKLER MODIFICATIONS TO AN EXISTING SYSTEM AT 5TH FLOOR AS SHOWN ON PLANS FILED HEREWITH. INCLUDING DEMO AND TEMP SPRINKLER CORE INSTALL AND REMOVAL No product keyword matched | 1 | Nov 2, 2026 |
| B | CLINTON HOUSING DEVELOPMENT COMPANY NYC DOB building permits | 11 | Structural · Exterior facade repair work as shown on plans. No product keyword matched | 6 | Nov 2, 2026 |
| B | KS RENOVATION GROUP NYC DOB building permits | 11 | Plumbing · HEREWITH FILING ALTERATION IN CONJUNCTION WITH ALT # Q01095232-I1 FOR PLUMBING WORK IN CELLAR, FIRST, SECOND & OSP AS PER PLANS FILED. No product keyword matched | 1 | Nov 2, 2026 |
| B | 3030 Bronx Park East LLC NYC DOB building permits | 11 | General Construction · New 4-story residential building with 13 dwelling units No product keyword matched | 1 | Nov 2, 2026 |
| B | SDG MANAGEMENT CORP NYC DOB building permits | 11 | Plumbing · PLUMBING WORK TO RENOVATE & COMBINE APARTMENTS 9C & 9D AT THE NINTH FLOOR ONLY. No product keyword matched | 5 | Nov 2, 2026 |
| B | BELL BUILDING CORP NYC DOB building permits | 11 | Full Demolition · FILED HEREWITH; FULL DEMOLITION OF A DETACHED 1 STORY HOME No product keyword matched | 2 | Nov 2, 2026 |
| B | J & K 101 LLC NYC DOB building permits | 11 | Full Demolition · Demo of two story structure No product keyword matched | 2 | Nov 2, 2026 |
| B | BROOKLYN CARES INC. NYC DOB building permits | 11 | General Construction · Proposed horizontal enlargement to an existing four (4) story + cellar community facility building. No product keyword matched | 7 | Nov 2, 2026 |
| B | DOUG'S PLBG & HTG SERV CO NYC DOB building permits | 11 | Plumbing · PLUMBING WORK AND GAS WORK AS INDICATED ON PLANS ON EXISTING COMMERCIAL STORE. NO CHANGE IN USE EGRESS OR OCCUPANCY No product keyword matched | 6 | Nov 2, 2026 |
| B | FANUKA INC NYC DOB building permits | 11 | General Construction · Renovation of an existing duplex dwelling unit. Architectural work as per plans. Related plumbing work filed under M01460723-I1-LA. No change of use, occupancy or egress. No product keyword matched | 1 | Nov 2, 2026 |
| B | TKR PROPERTY SERVICES, INC. NYC DOB building permits | 11 | Suspended Scaffold · FISP INSPECTION (Facade Inspection Safety Program). INDUSTRIAL ROPE ACCESS TECHNIQUES AND METHODS. SEE ATTACHED PLANS. Designated Primary Site supervisor: Jesus Decola No product keyword matched | 5 | Nov 2, 2026 |
| B | Pearl Realty Management NYC DOB building permits | 11 | Antenna · Modification to existing Verizon site. Replace 2 antennas, relocate 2 antennas, remove 1 antenna, install 2 antennas, and install 2 RRH units on the roof. Install 1 new cabinet on existing platform on roof. No product keyword matched | 4 | Nov 2, 2026 |
| B | SYMMETRICAL CONSTRUC CORP NYC DOB building permits | 11 | Structural · PROPOSE TO INSTALL A CONCRETE ADA RAMP AT AN EXISTING DOCTOR'S OFFICE ENTRANCE AS PER PLANS SUBMITTED HEREWITH. No product keyword matched | 4 | Nov 2, 2026 |
| B | HANSON PLACE SEVENTH-DAY ADVENTIST NYC DOB building permits | 11 | General Construction · place temporary portable containers on church property open area for storage, refrigeration and use during construction as per Landmark approval letter for temporary containers. No product keyword matched | 1 | Nov 2, 2026 |
| B | FEIL ORGANIZATION NYC DOB building permits | 11 | Suspended Scaffold · FISP INSPECTION (Facade Inspection Safety Program). INDUSTRIAL ROPE ACCESS TECHNIQUES AND METHODS. SEE ATTACHED PLANS. Designated Primary Site supervisor: Jesus Decola No product keyword matched | 14 | Nov 2, 2026 |
| B | Verizon Communications Inc. NYC DOB building permits | 11 | General Construction · Filing for Facade Alterations to comply with LL11, scope to include removal/replacement of cracked, Spalled bricks, repointing deteriorated mortar joints, replace sealant, patch limestone and replace lintels. No product keyword matched | 2 | Nov 2, 2026 |
| B | LEGACY BUILDERS/DEVELOPER NYC DOB building permits | 11 | Mechanical Systems · Herewith filing installation of mechanical equipment. No product keyword matched | 4 | Nov 2, 2026 |
| B | JUSTIN MANAGEMENT NYC DOB building permits | 11 | Supported Scaffold · INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. No product keyword matched | 7 | Nov 2, 2026 |
| B | UNITY CONSTRUCTION GROUP NYC DOB building permits | 11 | General Construction · 18th floor tenant pre-build-- General construction including installation of interior partitions as per plans filed herewith. No change to use, egress, or occupancy. No product keyword matched | 7 | Nov 2, 2026 |
| B | AT CONSTRUCTION & WIRELES NYC DOB building permits | 11 | Mechanical Systems · FURNISH AND INSTALL (7) SPLIT SYSTEM HEAT PUMP CONCEALED INDOOR AIR HANDLING UNITS AND (7) OUTDOOR CONDENSING UNITS SYSTEMS WITH ASSOCIATED DUCT WORK, INSULATION, AIR OUTLETS, DUCT INSULATION AND ASSOCIATED REFRIGERATION PIPING. IN ADDITION RADIANT FLOOR No product keyword matched | 4 | Nov 2, 2026 |
| B | Bedford Stuyvesant Restoration Corp NYC DOB building permits | 11 | General Construction · FILING TO MODIFY LAYOUT OF 2ND AND 3RD FLOORS. NEW BATHROOMS, NEW WINDOWS AND NEW PARTITIONS No product keyword matched | 3 | Nov 2, 2026 |
| B | MCMANUS MECH MAINT P&H IN NYC DOB building permits | 11 | Plumbing · INSTALLATION OF NEW PLUMBING FIXTURES IN THE KITCHEN: NEW GAS RANGE AND NEW SINK. INSTALLATION OF ALL NEW FIXTURES IN THE BATHROOMS. INSTALLATION OF NEW WASHER AND GAS-DRYER IN THE LAUNDRY AREA. INSTALLATION OF A NEW GAS METER. No product keyword matched | 1 | Nov 2, 2026 |
| B | RAZZINO RENOVATIONS INC NYC DOB building permits | 11 | General Construction · One story Horizontal extension to the left side of building. No product keyword matched | 2 | Nov 2, 2026 |
| B | The Kibel Companies, LLC NYC DOB building permits | 11 | Protection and Mechanical Methods · INSTALLATION OF PROTECTIVE NETTING TO COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE; FOR CONTAINMENT OF DETERIORATED TERRA COTTA AS PER PLANS SUBMITTED HEREWITH. THERE IS NO CHANGE IN USE, EGRESS OR OCCUPANCY. No product keyword matched | 3 | Nov 2, 2026 |
| B | HALAKEALA INC. DBA THE KITCHEN NYC DOB building permits | 11 | Standpipe · Herewith filing for temp manual dry standpipe No product keyword matched | 1 | Nov 2, 2026 |
| B | JADA PLUMBING & HTG LLC NYC DOB building permits | 11 | Plumbing · The scope of work consists of installing a new 3-compartment sink and water line for the espresso machine. no changes to building use or egress No product keyword matched | 6 | Nov 2, 2026 |
| B | VMC PLUMBING & HEATING IN NYC DOB building permits | 11 | Plumbing · Plumbing work as shown on plans No product keyword matched | 6 | Nov 2, 2026 |
| B | ELITE MANAGEMENT NYC DOB building permits | 11 | General Construction · Repairing the exsiting retaining wall No product keyword matched | 1 | Nov 2, 2026 |
| B | ZAMAN CONSTRUCTION CORP NYC DOB building permits | 11 | General Construction · Interior Renovation of Existing 3 family house with drywall, Ceiling ,floor as per plan . Plumbing will file under separate Application. No change of use , egress and occupancy. No product keyword matched | 4 | Nov 2, 2026 |
| B | Center for Constitutional Rights NYC DOB building permits | 11 | General Construction · FILING HEREWITH RENOVATION OF EXISTING OFFICE INCLUDING WINDOWS AS PER PLANS FILED IN CONJUNCTION WITH APPLICATION_M01243534. NO CHANGE IN USE, EGRESS OR OCCUPANCY. No product keyword matched | 4 | Nov 2, 2026 |
| B | APOLLO PLBG & HTG INC NYC DOB building permits | 11 | Plumbing · PLUMBING FIXTURES IN CONJUNCTION WITH DOB BIS FILING. NO CHANGE TO USE, OCCUPANCY OR EGRESS. No product keyword matched | 4 | Nov 2, 2026 |
| B | SCHREIBER PROPERTIES NYC DOB building permits | 11 | General Construction · INTERIOR DEMOLITION OF EXISTING 6-STORY MULTI-FAMILY BUILDING ,WORK IN APARTMENT #1A,#1C UNDER THIS APPLICANT. NO CHANGE IN USE, MEANS OF EGRESS OR OCCUPANCY No product keyword matched | 1 | Nov 2, 2026 |
| B | HESPELER CORP NYC DOB building permits | 11 | General Construction · POINTING AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY WITH THIS APPLICATION. No product keyword matched | 1 | Nov 2, 2026 |
| B | CREATE NYC CONTRACTING NYC DOB building permits | 11 | General Construction · Renovate Apt 3E, general construction includes new flooring, ceilings, finishes, mlllwork, finishes and lighting. Total Apt. SF is 1757 SF areas of work is 1236 SF Sub Docs filed for PL and MS work types. No product keyword matched | 2 | Nov 2, 2026 |
| B | GREENWAY MEWS REALTY LLC NYC DOB building permits | 11 | Sign · Proposed painted advertising wall face sign (17-6' x 30'). Designed for changeable copy. No change in egress, use or occupancy. No product keyword matched | 7 | Nov 2, 2026 |
| B | BOEN CONSTRUCTION LLC NYC DOB building permits | 11 | General Construction · (please assign to dev hub) PROPOSED 7 STORY MIXED USE BUILDING No product keyword matched | 7 | Nov 2, 2026 |
| B | HOLIDAY INN EXPRESS CHELSEA NYC DOB building permits | 11 | General Construction · LIMITED EXTERIOR REPAIRS AS INDICATED ON PLANS. NO CHANGE TO USE, EGRESS OR OCCUPANCY. No product keyword matched | 8 | Nov 2, 2026 |