Home
Workspace
Klise
Target
Seer
Signals
Competitors
Contacts
Log in
Seer/Prospects/Verizon Communications Inc.
Back to prospects

Verizon Communications Inc.

Bronx, Brooklyn, Staten Island, NY · Outside service region

AnalysisCompany profileContactsEmail draftSources

Analysis

Overall 11 / 20Tier B
Keyword
Seer chat
0 / 5
No keyword-matching signal in the last 90 days.
Freshness5 / 5Latest signal is within 30 days.
Place5 / 5NY matches the seller’s region.
Target fit1 / 5No target company types set; baseline is 1 star.

Company profile

Company
Verizon Communications Inc.
Source for Company (opens in new tab)
Signal source
NYC DOB building permits
Signal date
Nov 2, 2026
Source for Signal date (opens in new tab)
Signal count
8 saved signals, 2 in the last 90 days
Signal summary
General Construction · Filing for Facade Alterations to comply with LL11, scope to include removal/replacement of cracked, Spalled bricks, repointing deteriorated mortar joints, replace sealant, patch limestone and replace lintels.
Source for Signal summary (opens in new tab)
Address
230 FERRIS AVE
Source for Address (opens in new tab)
Phone
Not found
Email
Not found
Website
Not found
Decision maker
Not found
DM title
Not found

Contacts

No contact found

Phone: not found · See the source record

Log in to search contacts

Email draft

Add a contact before generating a draft.

Sources

8 signals
  • Nov 2, 2026
    Permit
    General Construction · Filing for Facade Alterations to comply with LL11, scope to include removal/replacement of cracked, Spalled bricks, repointing deteriorated mortar joints, replace sealant, patch limestone and replace lintels.
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)
  • Oct 22, 2026
    Permit
    General Construction · Filing for building Enclosure rehabilitation to the facade and roof.
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)
  • Jun 26, 2026
    Permit
    General Construction · INSTALLATION OF CHARGERS FOR ELECTRICAL VEHICLES IN PARKING LOT
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)
  • Mar 4, 2026
    Permit
    Boiler Equipment · Removal of fuel oil storage tank. No change to use, egress, or occupancy.
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)
  • Jan 14, 2026
    Permit
    Support of Excavation · Retaining Wall and Temporary SOE
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)
  • Jan 14, 2026
    Permit
    Structural · Removal of existing asphalt pavement and installaton of new reinforced concrete transformer support slab/mat.
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)
  • Jan 7, 2026
    Permit
    General Construction · FILING FOR REMOVAL OF EXISTING VEHICULAR RAMP, AND INSTALLATION OF NEW UTILITY TRANSFORMER & SWITCH GEAR ON CONCRETE PADS, ELECTRICAL CONDUITS, PAVING, AND ASSOCIATED SITE IMPROVEMENTS. WORK FILED UNDER THE 2022 NYCBUILDING CODE.
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)
  • Dec 31, 2025
    Permit
    Mechanical Systems · Mechanical work related to the replacement of computer room air conditioning and dry coolers and synchronous belt retrofit as shown herewith on plans. No change to use, egress, or occupancy.
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)