Plumbing · The scope of work consists of installing a new 3-compartment sink and water line for the espresso machine. no changes to building use or egress
Plumbing · The scope of work consists of installing a new 3-compartment sink and water line for the espresso machine. no changes to building use or egress
No product keyword matched · NYC DOB building permits
Plumbing · JOB FILED FOR INSTALL ONE NEW GAS COMBI/HEATING SYSTEM WALL MOUNT,RELOCATED EXISTING WASHER & DRYER AND RELOCATED EXISTING GAS METER TO OSP IN THE CELLAR FLOOR OF EXISTING ONE FAMILY HOUSE.NO CHANGE IN USE, OCCUPANCY OR MEANS OF EGRESS.
No product keyword matched · NYC DOB building permits
Plumbing · PROPOSED PLUMBING WORKS ONLY OF AN EXISTING EATING & DRINKING ESTABLISHMENT/RESTAURANT ON 1ST FLOOR AS PER PLAN, IN CONJUNCTION WITH DOB NOW GC JOB NO: M01440889-I1.
No product keyword matched · NYC DOB building permits
Plumbing · APPLICATION FOR CAP/REMOVAL OF CELLAR FIXTURE AND REPLACE 1ST & 2ND FLOORS FIXTURE AND REMOVAL OF VIOLATION : VIO23-03372,039102148R,39102149Z.NO CHANGE TO USE, EGRESS, OR OCCUPANCY
No product keyword matched · NYC DOB building permits
Plumbing · PLUMBING WORK IN CONJUNCTION WITH THE ADDITION OF A 2-STORY EXTENSION AT THE REAR OF EXISTING 3-STORY BUILDING WITH BASEMENT & CELLAR AS PER PLANS FILED HEREWITH. NO CHANGES IN EGRESS, USE OR OCCUPANCY
No product keyword matched · NYC DOB building permits
Plumbing · JOB FILED FOR REPLACE EXISTING GAS BOILER,REMOVED EXISTING GAS H.W.H. AND INSTALL THREE NEW GAS COMBI UNITS,ONE GAS METER AND CREATE NEW THREE PIECES BATHROOM ON THE FIRST FLOOR OF EXISTING THREE FAMILY HOUSE.NO CHANGE IN USE, OCCUPANCY OR MEANS OF EGRESS
No product keyword matched · NYC DOB building permits
Plumbing · Proposed interior plumbing modifications at the Cellar, Basement, First, Second, and Third Floors. No change in Use, Egress, or Occupancy is proposed in the application.
No product keyword matched · NYC DOB building permits