Home
Workspace
Klise
Target
Seer
Signals
Competitors
Contacts
Log in
Seer/Prospects/AT CONSTRUCTION & WIRELES
Back to prospects

AT CONSTRUCTION & WIRELES

Manhattan, MANHATTAN, NY · Outside service region

AnalysisCompany profileContactsEmail draftSources

Analysis

Overall 11 / 20Tier B
Keyword
Seer chat
0 / 5
No keyword-matching signal in the last 90 days.
Freshness5 / 5Latest signal is within 30 days.
Place5 / 5NY matches the seller’s region.
Target fit1 / 5No target company types set; baseline is 1 star.

Company profile

Company
AT CONSTRUCTION & WIRELES
Source for Company (opens in new tab)
Signal source
NYC DOB building permits
Signal date
Nov 2, 2026
Source for Signal date (opens in new tab)
Signal count
8 saved signals, 4 in the last 90 days
Signal summary
Mechanical Systems · FURNISH AND INSTALL (7) SPLIT SYSTEM HEAT PUMP CONCEALED INDOOR AIR HANDLING UNITS AND (7) OUTDOOR CONDENSING UNITS SYSTEMS WITH ASSOCIATED DUCT WORK, INSULATION, AIR OUTLETS, DUCT INSULATION AND ASSOCIATED REFRIGERATION PIPING. IN ADDITION RADIANT FLOOR
Source for Signal summary (opens in new tab)
Address
309 47TH ST APT 2
Source for Address (opens in new tab)
Phone
Not found
Email
Not found
Website
Not found
Decision maker
Not found
DM title
Not found

Contacts

No contact found

Phone: not found · See the source record

Log in to search contacts

Email draft

Add a contact before generating a draft.

Sources

8 signals
  • Nov 2, 2026
    Permit
    Mechanical Systems · FURNISH AND INSTALL (7) SPLIT SYSTEM HEAT PUMP CONCEALED INDOOR AIR HANDLING UNITS AND (7) OUTDOOR CONDENSING UNITS SYSTEMS WITH ASSOCIATED DUCT WORK, INSULATION, AIR OUTLETS, DUCT INSULATION AND ASSOCIATED REFRIGERATION PIPING. IN ADDITION RADIANT FLOOR
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)
  • Oct 20, 2026
    Permit
    Foundation · DESIGN OF UNDERPINNING OF EXISTING CONCRETE AREAWAY WALLS BENEATH FRONT STOOP IN CONJUNCTION WITH JOB #M01042329-I1.
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)
  • Sep 9, 2026
    Permit
    Supported Scaffold · INSTALLATION OF PIPE SCAFFOLDING AS PER PLANS. SCAFFOLD SHALL COMPLY WITH CHAPTER #33 OF THE 2022 CODE. NO CHANGE IN USE, EGRESS, AND OCCUPANCY UNDER THIS APPLICATION.
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)
  • Sep 9, 2026
    Permit
    General Construction · CHANGE OF USE TO GROUND FLOOR FROM DOCTOR'S OFFICE TO CREATE SIGLE FAMILY RESIDENCE TOWNHOUSE WITH OPEN STAIR.
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)
  • Apr 1, 2026
    Permit
    Supported Scaffold · INSTALLATION OF PIPE SCAFFOLDING AS PER PLANS. SCAFFOLD SHALL COMPLY WITH CHAPTER #33 OF THE 2022 CODE. NO CHANGE IN USE, EGRESS, AND OCCUPANCY UNDER THIS APPLICATION.
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)
  • Apr 1, 2026
    Permit
    Structural · JOIST REPLACEMENT AND REINFOIRCEMENT OF EXISTING JOISTS AT MULTIPLE FLOORS. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)
  • Apr 1, 2026
    Permit
    Structural · VERTICAL ENLARGEMENT OF EXIST BUILDING.
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)
  • Jan 9, 2026
    Permit
    Supported Scaffold · INSTALLATION OF PIPE SCAFFOLDING AS PER PLANS. SCAFFOLD SHALL COMPLY WITH CHAPTER #33 OF THE 2022 CODE. NO CHANGE IN USE, EGRESS, AND OCCUPANCY UNDER THIS APPLICATION.
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)