Companies with dated public signals, ranked by fit with your products.
| Tier | Company | Score | Latest signal | Signals 90d | Last signal |
|---|---|---|---|---|---|
| B | CENTRAL CONST MANAGEMENT NYC DOB building permits | 11 | Sidewalk Shed · Installation of a heavy duty sidewalk shed No product keyword matched | 41 | Nov 4, 2026 |
| B | UNIVERSAL SYSTEMS INC. NYC DOB building permits | 11 |
| 2 |
| Nov 4, 2026 |
| B | J & R CONTRACTORS SERVICE NYC DOB building permits | 11 | Structural · THIS APPLICATION IS BEING FILED FOR GENERAL CONSTRUCTION TO RENOVATE EXISTING RESIDENTIAL APARTMENTS, REVERT THE FIRST FLOOR TO PRIOR LEGAL CONDITIONS, TO CREATE 1 ADDITIONAL DWELLING UNIT AT 5TH FLOOR (APT # HU) & AND OBTAIN NEW CERTIFICATE OF OCCUPANCY No product keyword matched | 8 | Nov 4, 2026 |
| B | SUPREME INSTALLATIONS CORP NYC DOB building permits | 11 | Sidewalk Shed · INSTALLATION OF HEAVY DUTY SIDEWALK SHED. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION, ALL WORK TO COMPLY WITH CHAPTER 33 OF NYCBC. No product keyword matched | 16 | Nov 4, 2026 |
| B | BROOKLYN PUBLIC LIBRARY NYC DOB building permits | 11 | Foundation · Foundation filing for partial demolition of existing building and construction of new building using existing elements as per plans filed. Changes to use, egress, and occupancy based on design of new building. No product keyword matched | 15 | Nov 4, 2026 |
| B | TOM PETERSEN ARCHITECT, LLC NYC DOB building permits | 11 | Solar · INSTALLATION OF ROOF MOUNTED SOLAR PANELS.NOCHANGE IN USE, EGRESS, OR OCCUPANCY No product keyword matched | 58 | Nov 4, 2026 |
| B | THE GREEN PLUG LLC NYC DOB building permits | 11 | Solar · INSTALLATION OF PV SYSTEM ON EXISTING ROOFTOP. NO CHANGES TO EGRESS OR USE OF OCCUPANCY. No product keyword matched | 13 | Nov 4, 2026 |
| B | 950 W. FINGERBOARD LLC NYC DOB building permits | 11 | General Construction · Proposed 2 Story school building No product keyword matched | 8 | Nov 4, 2026 |
| B | NYC DEPARTMENT OF DESIGN AND CONSTR NYC DOB building permits | 11 | Foundation · HEREWITH FILING FOUNDATION WORK AS PER PLANS. No product keyword matched | 10 | Nov 4, 2026 |
| B | AMERGY SOLAR INC NYC DOB building permits | 11 | Solar · Installation of Solar panels on existing roof structure, No change in use, egress or occupancy. No product keyword matched | 20 | Nov 4, 2026 |
| B | REPUBLIC SCAFFOLD & HOIST CORP NYC DOB building permits | 11 | Sidewalk Shed · Installation of a temporarily heavy-duty sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application. No product keyword matched | 19 | Nov 4, 2026 |
| B | BIG APPLE PLBG & HTG CO I NYC DOB building permits | 11 | Plumbing · PROPOSE CONVERSION OF EXISTING 2 TO 3 FAMILY DWELLING UNITS. PROPOSING 3-PC BATHROOM, KITCHEN, NEW BOILER, AND SPRINKLERS IN THE BASEMENT W/ INTERIOR WORK AS SHOWN IN PLANS. GENERAL CONSTRUCTION WORK-TYPE TO BE FILED UNDER A SEPARATE APPLICATION No product keyword matched | 2 | Nov 4, 2026 |
| B | PROFESSIONAL LINE CORP NYC DOB building permits | 11 | Sidewalk Shed · INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. LIVE LOAD 300PSF. No product keyword matched | 37 | Nov 4, 2026 |
| B | THE CHETRIT GROUP NYC DOB building permits | 11 | General Construction · Interior renovations to the existing office space including removal and installation of non-load bearing partitions and related finishes. No change in use, egress or occupancy. No product keyword matched | 14 | Nov 4, 2026 |
| B | SAFETY PRO CONSTRUCTION NYC DOB building permits | 11 | Curb Cut · FILE TO BUILD A NEW CURB CUT IN FRONT OF THE PROPERTY. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION. No product keyword matched | 11 | Nov 4, 2026 |
| B | UPPER RESTORATION NYC DOB building permits | 11 | Sprinklers · INSTALLATION OF NEW SPRINKLER SYSTEM AS PER PLANS. No product keyword matched | 5 | Nov 4, 2026 |
| B | JLN CONSTRUCTION NYC DOB building permits | 11 | Full Demolition · Demolition of detached house. On-site and off-site fill not to exceed 300 cubic yards. No product keyword matched | 3 | Nov 4, 2026 |
| B | KWA CONSTR & SERVICES INC NYC DOB building permits | 11 | General Construction · Renovation of an existing duplex apartment 32C on the 32nd floor. work includes non-structural demolition and general construction as per plans filed herewith. no change to use, egress or occupancy. No product keyword matched | 1 | Nov 4, 2026 |
| B | ALL AREA REALTY SERVICES INC. NYC DOB building permits | 11 | General Construction · FACADE REPAIR WORK AS PER PLAN. NO CHANGE IN IN USE, EGRESS OR OCCUPANCY. No product keyword matched | 12 | Nov 4, 2026 |
| B | BASIC GROUPS CORP NYC DOB building permits | 11 | Plumbing · INSTALL 1 NEW HOT WATER HEATER, 1 GAS OVEN (NO OPEN FLAME) & 1 NEW GAS METER IN THE EXISTING 4 STORY BUILDING. PLUMBING WORKS AS PER PLAN. NO CHANGE IN EGRESS, USE, OR OCCUPANCY. FILED TO SUPERSEDE LAA JOB APPLICATION B0650324. No product keyword matched | 3 | Nov 4, 2026 |
| B | CUSTOMBUILT HOMES INC NYC DOB building permits | 11 | Mechanical Systems · SUBSEQUENT MECHANICAL FILING FOR KITCHEN HOOD IN CONJUNCTION WITH INTERIOR RENOVATION OF PROPOSED RESTAURANT FOR SARKU JAPAN JOB # Q01266234-I1 No product keyword matched | 15 | Nov 4, 2026 |
| B | V.A.N. CONSTRUCTION CORP NYC DOB building permits | 11 | Construction Fence · INSTALL TEMPORARY 8' HIGH CONSTRUCTION FENCE No product keyword matched | 3 | Nov 4, 2026 |
| B | STATELINE BUILDERS INC NYC DOB building permits | 11 | General Construction · PROPOSED ALTERATION TYPE 1 TO EXISTING 2 STORY + CELLAR BUILDING. VERTICAL AND HORIZONTAL ENLARGEMENT. PROPOSED 4 STORY + CELLAR + PENTHOUSE RESIDENTIAL USE BUILDING. No product keyword matched | 9 | Nov 4, 2026 |
| B | Highbridge Community Dev. Corp NYC DOB building permits | 11 | Sidewalk Shed · HEAVY DUTY SIDEWALK SHED DURING EXTERIOR FACADE REPAIRS FILED UNDER APPL# X01208259-S5. SIDEWALK SHED SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION. No product keyword matched | 17 | Nov 4, 2026 |
| B | BUSHBURG BUILDERS LLC NYC DOB building permits | 11 | General Construction · EXTERIOR WINDOW REMOVAL AND REPLACEMENT ON FLOORS 2 THROUGH 17 ONLY. NO CHANGE IN OCCUPANCY, USE OR EGRESS. EXISTING CURTAIN WALL SYSTEM AND SPANDREL GLASS TO REMAIN. No product keyword matched | 14 | Nov 4, 2026 |
| B | SOLAR STRING INC NYC DOB building permits | 11 | Solar · INSTALLATION OF SOLAR PANELS ON EXISTING ROOF. NO CHANGE IN USE, OCCUPANCY, OR EGRESS. NO CHANGE IN BULK No product keyword matched | 6 | Nov 4, 2026 |
| B | GOLDEN TIME CONTRACTING I NYC DOB building permits | 11 | Construction Fence · INSTALL 8' TEMPORARY CONSTRUCTION FENCE AT THE ABOVE ADDRESS No product keyword matched | 6 | Nov 4, 2026 |
| B | WHITESTONE PLUMBING CORP NYC DOB building permits | 11 | Plumbing · TO INSTALL NEW PLUMBING FIXTURE FOR EX. COMMERCIAL STORE ON 001 FLOOR WITH PLUMBING WORK AS PER PLAN FILED HEREWITH. NO CHANGE OF USE, EGRESS OR CERTIFICATE OF OCCUPANCY. No product keyword matched | 3 | Nov 4, 2026 |
| B | TESS CONTRACTING CORP NYC DOB building permits | 11 | Construction Fence · INSTALLATION OF CONSTRUCTION FENCE. No product keyword matched | 3 | Nov 4, 2026 |
| B | WEILL CORNELL MEDICAL COLLEGE NYC DOB building permits | 11 | Mechanical Systems · SELECTIVE MECHANICAL EQUIPMENT REMOVALS ON LEVELS 1 6 (floors basement 1-5); REMOVAL OF AHU-1-3 AND ASSOCIATED DUCTWORK ON LEVEL 1. (MPP Project-000000678) No product keyword matched | 16 | Nov 4, 2026 |
| B | BNS REAL ESTATE NYC DOB building permits | 11 | Plumbing · Remove fss gas shut off valve, remove cooking equipment (range and conv. oven). Install new gas piping, connect existing hot water heater and replace furnace as per plans. The new Plumbing work to supersede work done under DOB BIS # 101929647 & 120328680 No product keyword matched | 4 | Nov 4, 2026 |
| B | Silver skyline construction llc NYC DOB building permits | 11 | Supported Scaffold · INSTALLATION OF PIPE SCAFFOLD STAIR TOWERS @ ROOF LEVEL AS PER PLANS. PIPE SCAFFOLD SHALL COMPLY WITH CHAPTER #33 OF THE 2022 CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION. No product keyword matched | 2 | Nov 4, 2026 |
| B | JERRICK ASSOCIATES, INC. NYC DOB building permits | 11 | Sidewalk Shed · INSTALLATION OF TEMPORARY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. No product keyword matched | 43 | Nov 4, 2026 |
| B | CONSTRUCTION MANAGEMENT & NYC DOB building permits | 11 | Mechanical Systems · Related mechanical work for interior renovations on ground floor and roof for tenant space (Whole Foods Market). No change in occupancy or use. No product keyword matched | 2 | Nov 4, 2026 |
| B | BROADWALL MANAGEMENT NYC DOB building permits | 11 | Structural · COLUM REPAIR AS PER DRAWINGS , THERE IS NO CHANGE TO USE, EGRESS OR OCCUPANCY No product keyword matched | 14 | Nov 4, 2026 |
| B | GLOBAL TEAM NY INC NYC DOB building permits | 11 | General Construction · VERTICAL ENLARGEMENT OF EXISTING ONE AND HALF STORY, ONE-FAMILY BUILDING INTO A TWO STORY, ONE FAMILY BUILDING AS SHOWN ON THE PLANS. PROPOSED INTERIOR RENOVATION AS PER PLAN. OBTAIN A NEW CERTIFICATE OF OCCUPANCY. TO RESOLVE VIOLATIONS. No product keyword matched | 6 | Nov 4, 2026 |
| B | Grun Group LLC NYC DOB building permits | 11 | Structural · STRUCTURAL SPECIFICATIONS FILED IN CONJUNCTION WITH GC APPLICATION JOB #B01348242-I1 No product keyword matched | 16 | Nov 4, 2026 |
| B | LEXINGTON DESIGN NY INC NYC DOB building permits | 11 | Full Demolition · Full Demolition to a 2 Story Building No product keyword matched | 2 | Nov 4, 2026 |
| B | RYBAK DEVELOPMENT CORP NYC DOB building permits | 11 | General Construction · PROPOSED TWENTY-ONE (21) STORY, FIFTEEN (15) UNIT RESIDENTIAL BUILDING No product keyword matched | 16 | Nov 4, 2026 |
| B | METRO CONTRACTING NY INC NYC DOB building permits | 11 | Sidewalk Shed · INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. LIVE LOAD 300PSF. No product keyword matched | 24 | Nov 4, 2026 |
| B | ST MARKS DAY SCHOOL THE CHURCH OF STMARKS NYC DOB building permits | 11 | Plumbing · FILING TO INSTALL A NEW WATER HEATER, UPGRADE GAS PIPING TO THE EXISTING BURNER CONNECTION, AND AN EXISTING KITCHEN RANGE AS PER PLANS SUBMITTED HEREWITH. No product keyword matched | 3 | Nov 4, 2026 |
| B | 69th Tenants Corp. NYC DOB building permits | 11 | General Construction · INTERIOR RENOVATION TO EXISTING APARTMENT #2R , ON THE 2ND FLOOR. REMOVE & CONSTRUCT INTERIOR PARTITIONS. REPAIR CEILING AND REPLACE WOOD FLOOR, ALL AS PER PLAN . NO CHANGE IN USE EGRESS OR OCCUPANCY. No product keyword matched | 7 | Nov 4, 2026 |
| B | DIAMOND DEV GROUP LLC NYC DOB building permits | 11 | Mechanical Systems · MECHANICAL SYSTEMS INSTALLATION FOR ONE FAMILY DWELLING ALTERATION. NO CHANGE TO EGRESS, USE OR OCCUPANCY. No product keyword matched | 8 | Nov 4, 2026 |
| B | NEW YORK BOTANICAL GARDEN NYC DOB building permits | 11 | General Construction · Temporary structures for NYBG gala events, the location is adjacent and accessory to the Haupt Conservatory. Removed at the end of the programing. No changes to existing structures, use or egress. No product keyword matched | 3 | Nov 4, 2026 |
| B | NTF MANAGEMENT INC NYC DOB building permits | 11 | Construction Fence · INSTALLATION OF CONSTRUCTION FENCE AS PER THE PLANS FILED HEREWITH. NO CHANGE IN USE, OCCUPANCY OR EGRESS. No product keyword matched | 9 | Nov 4, 2026 |
| B | 67 IRVING (NY), LLC NYC DOB building permits | 11 | Plumbing · PLUMBING WORK AS PER PLANS FILED. No product keyword matched | 3 | Nov 4, 2026 |
| B | ONEVESTA PROPERTY MANAGEMENT NYC DOB building permits | 11 | General Construction · COMBINE APARTMENTS 8C AND 9C INTO ONE DWELLING UNIT AND PERFORM COSMETIC RENOVATION OF APARTMENT 9C. NO CHANGE IN USE, FLOOR AREA, EGRESS OR OCCUPANCY. No product keyword matched | 10 | Nov 4, 2026 |
| B | SAFEGUARD REALTY MANAGEMENT NYC DOB building permits | 11 | General Construction · FACADE REPAIR AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. No product keyword matched | 1 | Nov 4, 2026 |
| B | FABRIKANT OF AMERICA DEV NYC DOB building permits | 11 | Foundation · APPLICATION FILED FOR ENLARGEMENT AT FRONT, CELLAR,001,002 and rear 2nd.fl. No product keyword matched | 1 | Nov 4, 2026 |
| B | CARDOZA PLUMBING CORP NYC DOB building permits | 11 | Plumbing · MOUNT SINAI - ANNENBERG 22 LAB SUITE 95 RENO - PLUMBING MODIFICATIONS AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. No product keyword matched | 1 | Nov 4, 2026 |