Home
Workspace
Klise
Target
Seer
Signals
Competitors
Contacts
Log in
Seer/Prospects/BASIC GROUPS CORP
Back to prospects

BASIC GROUPS CORP

Brooklyn, Queens, Manhattan, NY · Outside service region

AnalysisCompany profileContactsEmail draftSources

Analysis

Overall 11 / 20Tier B
Keyword
Seer chat
0 / 5
No keyword-matching signal in the last 90 days.
Freshness5 / 5Latest signal is within 30 days.
Place5 / 5NY matches the seller’s region.
Target fit1 / 5No target company types set; baseline is 1 star.

Company profile

Company
BASIC GROUPS CORP
Source for Company (opens in new tab)
Signal source
NYC DOB building permits
Signal date
Nov 4, 2026
Source for Signal date (opens in new tab)
Signal count
44 saved signals, 3 in the last 90 days
Signal summary
Plumbing · INSTALL 1 NEW HOT WATER HEATER, 1 GAS OVEN (NO OPEN FLAME) & 1 NEW GAS METER IN THE EXISTING 4 STORY BUILDING. PLUMBING WORKS AS PER PLAN. NO CHANGE IN EGRESS, USE, OR OCCUPANCY. FILED TO SUPERSEDE LAA JOB APPLICATION B0650324.
Source for Signal summary (opens in new tab)
Address
46353 44TH ROAD
Source for Address (opens in new tab)
Phone
Not found
Email
Not found
Website
Not found
Decision maker
Not found
DM title
Not found

Contacts

No contact found

Phone: not found · See the source record

Log in to search contacts

Email draft

Add a contact before generating a draft.

Sources

44 signals
  • Nov 4, 2026
    Permit
    Plumbing · INSTALL 1 NEW HOT WATER HEATER, 1 GAS OVEN (NO OPEN FLAME) & 1 NEW GAS METER IN THE EXISTING 4 STORY BUILDING. PLUMBING WORKS AS PER PLAN. NO CHANGE IN EGRESS, USE, OR OCCUPANCY. FILED TO SUPERSEDE LAA JOB APPLICATION B0650324.
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)
  • Oct 6, 2026
    Permit
    Construction Fence · INSTALL TEMPORARY WOOD CONSTRUCTION FENCE IN FRONT YARD AND REAR YARD INSIDE THE LOT LINE.
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)
  • Oct 6, 2026
    Permit
    Plumbing · INSTALL 2 H.W.H. AND 2 BOILERS AT CELLAR, INSTALL AND RELOCATE PLUMBING FIXTURES IN THE EXISTING 2 STORY BUILDING. PLUMBING WORKS AS PER PLAN. NO CHANGE IN EGRESS, USE, OR OCCUPANCY.
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)
  • Aug 12, 2026
    Permit
    Mechanical Systems · PROPOSED INTERIOR RENOVATION OF EXISTING COMMERCIAL SPACE ON 1ST FLOOR. REPLACE EXISTING KITCHEN EXHAUST HOOD AND SYSTEM. CONSTRUCTION AND MECHANICAL WORK AS PER PLAN. NO CHANGE IN EGRESS, USE OR OCCUPANCY.
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)
  • Aug 3, 2026
    Permit
    Mechanical Systems · INTERIOR RENOVATION OF CELLAR, 1ST AND 2ND OF EXISTING 2 STORY BUILDING. DEMOLITION AND CONSTRUCTION WORK AS PER PLAN. INSTALL NEW HVAC, PARTITION, FLOORING, CEILING AND PAINTING THROUGHOUT. NO CHANGE IN EGRESS, USE, OR OCCUPANCY.
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)
  • Jul 20, 2026
    Permit
    Curb Cut · Remove existing curb cut to conform code as per plan.
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)
  • Jul 20, 2026
    Permit
    Mechanical Systems · SUBMIT MECHANICAL PLAN IN CONJUNCTION WITH NEW APPLICATION# 340805212
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)
  • Jul 14, 2026
    Permit
    Mechanical Systems · PROPOSED INTERIOR RENOVATION OF CELLAR, 1ST, 2ND FL. & ATTIC OF EXIST. 2 STORY BUILDING. REPLACE EXISTING DRIVEWAY, INSTALL METAL FENCE AND GATE AT OSP, PARTITION WORK AS PER PLAN, NO CHANGE IN EGRESS, USE, OR OCCUPANCY.
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)
  • Jul 13, 2026
    Permit
    Construction Fence · INSTALL NEW TEMPORARY WOOD CONSTRUCTION FENCE AND GATE IN OPEN SPACE.
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)
  • Jun 5, 2026
    Permit
    Plumbing · INSTALL 3 NEW BOILER AND 3 H.W.H. IN CELLAR OF THE EXISTING 3 STORY BUILDING. PLUMBING WORKS AS PER PLAN. NO CHANGE IN EGRESS, USE, OR OCCUPANCY.
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)
  • Jun 3, 2026
    Permit
    Construction Fence · INSTALL NEW TEMPORARY WOOD CONSTRUCTION FENCE AND GATE IN OPEN SPACE.RELATED DOB NOW BIS JOB NUMBERS:B01052030.
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)
  • Jun 2, 2026
    Permit
    General Construction · REPLACE THE EXISTING FRONT PARAPET WALL OF 2 STORY EXISTING BUILDING, MASONRY WORK AS PER PLAN. NO CHANGE IN EGRESS, USE, OR OCCUPANCY.SCAFFOLD WILL BE FILED UNDER DIFFERENT APPLICATION.
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)
  • May 14, 2026
    Permit
    Plumbing · PROPOSED INSTALLATION OF NEW PLUMBING FIXTURES AND SPRINKLER FROM CELLAR TO ROOF. PLUMBING AND SPRINKLER WORK AS PERPLAN. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)
  • Apr 24, 2026
    Permit
    General Construction · REPLACE THE EXISTING PARAPET WALL AND MAINTAIN EXTERIOR WALL OF 6 STORY EXISTING BUILDING. MASONRY WORK AND CONSTRUCTION WORK AS PER PLAN. NO CHANGE IN EGRESS, USE, OR OCCUPANCY.
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)
  • Apr 2, 2026
    Permit
    General Construction · INTERIOR RENOVATION OF CELLAR, 1ST & 2ND FLOOR OF EXISTING 2 STORY BUILDING. DEMOLITION WORK AND CONSTRUCTION WORK AS PER PLAN. INSTALL NEW HVAC, PARTITION, FLOORING, CEILING AND PAINTING THROUGHOUT. NO CHANGE IN EGRESS, USE, OR OCCUPANCY.
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)
  • Apr 1, 2026
    Permit
    Mechanical Systems · Interior renovation of cellar,basement,1st,2nd and 3rd floor of exist. 3 story building.Demolition work and construction work as per plan.Install new HVAC,exhaust fan,partition,flooring,ceiling and painting throughout,no change in egress, use or occupancy
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)
  • Apr 1, 2026
    Permit
    Mechanical Systems · Propose to remove interior partitions and install new split system at 1st floor as per plan. No change in use, egress, or bulk.
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)
  • Mar 26, 2026
    Permit
    Plumbing · Install new combi boiler in the existing 2 story building. Install plumbing and gas fixtures. Plumbing works as per plan. No change in egress, use, or occupancy.
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)
  • Mar 25, 2026
    Permit
    General Construction · PROPOSED INTERIOR RENOVATION OF CELLAR, 1ST, 2ND FL. & ATTIC OF EXIST. 2 STORY BUILDING. REPLACE EXISTING DRIVEWAY, INSTALL METAL FENCE AND GATE AT OSP, PARTITION WORK AS PER PLAN, NO CHANGE IN EGRESS, USE, OR OCCUPANCY.
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)
  • Mar 25, 2026
    Permit
    Construction Fence · INSTALL NEW TEMPORARY WOOD CONSTRUCTION FENCE AND GATE IN OPEN SPACE.
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)