Mechanical Systems · PROPOSED NEW MECHANICAL SYSTEMS, HEATING, VENTILATION AND AIR CONDITIONING SYSTEMS, ASSOCIATED DUCTS AND PIPING FOR ENTIRE BUILDING IN ACCORDANCE WITH 2022 NYC BUILDING CODE, 2022 MECHANICAL CODE AND 2022 NYC ENERGY CONSERVATIONE CODE
No product keyword matched · NYC DOB building permits
General Construction · PROPOSED ALTERATION TO EXISTING (3) THREE STORY DWELLING TO ALTER TO A FIVE (5) STORY, FIVE (5) FAMILY DWELLING WITH EXISTING FOUNDATIONS TO REMAIN AS PER PLANS FILED HEREWITH
No product keyword matched · NYC DOB building permits
General Construction · PROPOSED ALTERATION TO EXISTING (3) THREE STORY DWELLING TO ALTER TO A FIVE (5) STORY, FIVE (5) FAMILY DWELLING WITH EXISTING FOUNDATIONS TO REMAIN AS PER PLANS FILED HEREWITH
No product keyword matched · NYC DOB building permits
General Construction · APARTMENT 4D:REPLACING THE TEMPORARY SHORING FOR A PERMANENT STRUCTURAL SOLUTION.INSTALL LALLY JACKREMOVALS OF THE INSTALLED TEMPORARY POSTS REPAIR EXISTING WOOD GIRDERREPAIR FLOOR/CEILINGAPARTMENT 5E:REMOVE EXISTING FINISH FLOORFLOOR LEVELINGREPAIR PARTI
No product keyword matched · NYC DOB building permits
Mechanical Systems · INSTALLATION OF MECHANICAL SYSTEM FOR ENTIRE BUILDING IN CONJUNCTION ALT APPLICATION # B01145415. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
No product keyword matched · NYC DOB building permits