Mechanical Systems · SELECTIVE MECHANICAL EQUIPMENT REMOVALS ON LEVELS 1 6 (floors basement 1-5); REMOVAL OF AHU-1-3 AND ASSOCIATED DUCTWORK ON LEVEL 1. (MPP Project-000000678)
Mechanical Systems · SELECTIVE MECHANICAL EQUIPMENT REMOVALS ON LEVELS 1 6 (floors basement 1-5); REMOVAL OF AHU-1-3 AND ASSOCIATED DUCTWORK ON LEVEL 1. (MPP Project-000000678)
No product keyword matched · NYC DOB building permits
Sprinklers · Remove sprinkler piping and heads on unoccupied floors basement, and 1 through 5; install temp sprinkler loop; remove FHC, cut and cap standpipe back to active main on each floor as per plans filed herewith. (MPP Project-000000678)
No product keyword matched · NYC DOB building permits
Sprinklers · Remove sprinkler piping and heads on unoccupied floors basement, and 1 through 5; install temp sprinkler loop; remove FHC, cut and cap standpipe back to active main on each floor as per plans filed herewith. (MPP Project-000000678)
No product keyword matched · NYC DOB building permits
General Construction · HUB JOB- MPP 678. Construction of new restrooms on floors 7-9 in the existing building including alterations for mechanical equipment in penthouse. Install rated construction at former atrium on 7th floor.
No product keyword matched · NYC DOB building permits
General Construction · THIS IS A HUB PROJECT. Remove interior partitions and construct temporary protection on floors basement, and 1 through 5 in the existing commercial building as per plans filed herewith only.
No product keyword matched · NYC DOB building permits
General Construction · Interior demolition on cellar - 1st fls; new 1st floor slab; facade repair to for duct support connections; roof replacement and replacement of exterior metal stair and catwalk for mechanical equipment; All work as per plans. No change of use, egress.
No product keyword matched · NYC DOB building permits
Mechanical Systems · Mechanical piping and ductwork installation on cellar and 1st floor to accommdote medical office fit out. Refer to plans filed herewith.
No product keyword matched · NYC DOB building permits
General Construction · FIT OUT: Construct new partitions and finishes to existing commercial spaces on cellar and 1st floor as per plans filed herewith. No change to zoning, use, egress, occupancy
No product keyword matched · NYC DOB building permits
Mechanical Systems · Mechanical infrastructure to accommodate medical office space on cellar and 1st floor including new rooftop mechanical equipment, new vent piping and ductwork on the exterior facade, ductwork on cellar and 1st floor.
No product keyword matched · NYC DOB building permits
Construction Fence · INSTALLATION OF TEMPORARY CONSTRUCTION FENCE AS PER PLANS DURING GENERAL CONSTRUCTION WORK. NO CHANGE IN USE, EGRESS OR OCCUPANCY. FENCE TO COMPLY WITH CHAPTER 33 OF NYC BUILDING CODE OF 2022.
No product keyword matched · NYC DOB building permits