Companies with dated public signals, ranked by fit with your products.
| Tier | Company | Score | Latest signal | Signals 90d | Last signal |
|---|---|---|---|---|---|
| B | CATHOLIC CEMETERIES DIOCESE OF BROO NYC DOB building permits | 11 | Support of Excavation · PROPOSED SUPPORT OF EXCAVATION FOR NEW 3-STORY MAUSOLEUM. No product keyword matched | 2 | Nov 9, 2026 |
| B | TWO TREES NYC DOB building permits | 11 |
Suspended Scaffold · Suspended Scaffold for Facade Restoration as shown on Plans No product keyword matched |
| 5 |
| Nov 9, 2026 |
| B | DURGAJ PROPERTIES CORP NYC DOB building permits | 11 | Sprinklers · Install sprinkler and standpipe systems in conjunction with NB#X01255412-I1. The systems are hydraulically calculated. There is no change in use, occupancy or egress. No product keyword matched | 13 | Nov 9, 2026 |
| B | MAC FELDER INC NYC DOB building permits | 11 | Plumbing · Replacement of plumbing fixtures in the basement levels as per plans. No change to egress use or occupancy No product keyword matched | 3 | Nov 9, 2026 |
| B | ACO-DEL GROUP COMPANY INC NYC DOB building permits | 11 | General Construction · FILING FOR RENOVATION OF APARTMENT PH3. NON-STRUCTURAL PARTITION WORK. NO CHANGE TO USE, OCCUPANCY OR EGRESS. No product keyword matched | 1 | Nov 9, 2026 |
| B | HARRAN HOLDING CORP NYC DOB building permits | 11 | General Construction · Renovation of existing commercial space. (use Group VI) No product keyword matched | 1 | Nov 9, 2026 |
| B | 132-28 CONDOMINIUM LLC NYC DOB building permits | 11 | Construction Fence · TEMPORARY CONSTRUCTION FENCE WORK IN CONJUNCTION WITH DOB NOW GENERAL CONSTRUCTION APPLICATION #Q00909669. No product keyword matched | 1 | Nov 9, 2026 |
| B | CHRIS OCZERETKO NYC DOB building permits | 11 | Structural · PROPOSED GARAGE REPAIRS AS PER PLANS FILED HEREWITH. THERE IS NO CHANGE IN USE, EGRESS OR OCCUPANCY. No product keyword matched | 7 | Nov 9, 2026 |
| B | DSA PROPERTY GROUP NYC DOB building permits | 11 | Plumbing · Interior renovation of existing commercial space, new plumbing fixtures. no change in use, egress, or occupancy. No product keyword matched | 2 | Nov 9, 2026 |
| B | FOX 18 REALTY LLC NYC DOB building permits | 11 | Construction Fence · INSTALL 8'-0 HIGH TEMPORARY PLYWOOD CONSTRUCTION FENCE ON PROPERTY LINE AND 3'-0 BEYOND PROPERTY LINE AS INDICATED ON SITE PLAN No product keyword matched | 3 | Nov 9, 2026 |
| B | J&JMP20 LLC NYC DOB building permits | 11 | General Construction · RENOVATION OF EXISTING SINGLE-FAMILY STRUCTURE; VERTICAL ENLARGEMENT. NEW SCHEDULE OF OCCUPANCY TO BE OBTAINED. No product keyword matched | 3 | Nov 9, 2026 |
| B | Icon Realty Management, LLC NYC DOB building permits | 11 | General Construction · Filing Alt 1 application to increase number of occupants in existing eating and drinking establishment on the first floor only. No change in use or egress. No product keyword matched | 6 | Nov 9, 2026 |
| B | MINETTA LANE OWNERS NYC DOB building permits | 11 | General Construction · Emergency shoring and garage repairs on the cellar floor through roof as shown on the drawings filed herewith. No change in use, egress, or occupancy. No product keyword matched | 7 | Nov 9, 2026 |
| B | RANCO CAPITAL LLC NYC DOB building permits | 11 | Earth Work · FOUNDATION SPECIFICATIONS FILED IN CONJUNCTION WITH NB APPLICATION #B01373634-I1 No product keyword matched | 20 | Nov 9, 2026 |
| B | A TAHER CONTRACTING CO IN NYC DOB building permits | 11 | General Construction · REBUILD REAR GARAGE WALL TO ADDRESS ECB VIOLATION#39160640Y & DOB VIOLATION# VIO25-02148 AS PER PLAN. NO CHNAGE OF USE, EGRESS AND OCCUPANCY UNDER THIS APPLICATION. No product keyword matched | 1 | Nov 9, 2026 |
| B | 40 Exchange Owners LLC NYC DOB building permits | 11 | General Construction · Conversion and alteration of existing commercial building to mixed-use. No product keyword matched | 3 | Nov 9, 2026 |
| B | WE STAY / NOS QUEDAMOS, INC. NYC DOB building permits | 11 | General Construction · INTERIOR RENOVATION OF EX. BUILDING, NEW FINISHES & REPLACEMENT OF WIND/DOORS. NEW LED INT/ EXT LIGHTING. MINOR MASONRY & FACADE WORK. NEW ROOF OVERLAY. NO CHANGE OF USE, EGRESS OR OCCUPANCY UNDER THIS APP. No product keyword matched | 3 | Nov 9, 2026 |
| B | BATTERY PARK CITY AUTHORITY NYC DOB building permits | 11 | General Construction · REACH 4 - New flood wall construction per BPCR Project. Scope includes excavation, grading, landscaping, soil improvement, utility and drainage upgrades, fill placement, and foundation stabilization. See G-004.00. No change to use, egress or occupancy. No product keyword matched | 5 | Nov 9, 2026 |
| B | GRATIA CONTRACTORS LLC NYC DOB building permits | 11 | General Construction · Interior Renovation on 8th Floor Limited to Apartment 8D including non-structural demo of walls, flooring/finishes. Installation of new walls, doors, finishes as indicated on plans filed herewith. No change of use No product keyword matched | 1 | Nov 9, 2026 |
| B | Urban Resource Institute NYC DOB building permits | 11 | Sidewalk Shed · INSTALLATION OF TEMPORARY SIDEWALK SHED AS PER PLAN. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. THE SIDEWALK SHED AT WEST 130TH STREET AND REAR YARD ELEVATIONS. No product keyword matched | 6 | Nov 9, 2026 |
| B | NYCHA PACT Project NYC DOB building permits | 11 | Suspended Scaffold · Installation of suspended scaffold No product keyword matched | 5 | Nov 9, 2026 |
| B | SHORENSTEIN NYC DOB building permits | 11 | Mechanical Systems · Mechanical Renovation of the 1st floor for office retail build out. No change in use, egress or occupancy No product keyword matched | 10 | Nov 9, 2026 |
| B | OUT OF HOME HOLDINGS, LLC NYC DOB building permits | 11 | Sprinklers · ADDITION AND MODIFICATIONS TO EXISTING SPRINKLER SYSTEM AS PER PLANS FILLED HEREWITH. No product keyword matched | 2 | Nov 9, 2026 |
| B | WALTER & SAMUELS INC. NYC DOB building permits | 11 | Suspended Scaffold · Suspended Scaffold for Facade Restoration as Shown on Plans No product keyword matched | 2 | Nov 9, 2026 |
| B | ARDSLEY CONSTRUCTION SERVICES LLC NYC DOB building permits | 11 | General Construction · PROPOSED ELEVEN (11) STORY MIXED USE DEVELOPMENT. No product keyword matched | 11 | Nov 9, 2026 |
| B | USC NYC DOB building permits | 11 | Mechanical Systems · INSTALLATION OF NEW MECHACNIAL SYSTEMS VRF UNITS, FANS AND ROOFTOP UNIT WITH ENERGY RECOVERY WHEEL FOR A NB No product keyword matched | 2 | Nov 9, 2026 |
| B | INTERFAITH MEDICAL CENTER NYC DOB building permits | 11 | Structural · IMC 9 FL: Structural modifications within the existing hospital building as indicated on plans filed herewith. No product keyword matched | 3 | Nov 9, 2026 |
| B | ELITE CONSTRUCTORS CORP NYC DOB building permits | 11 | Curb Cut · ALT 3 FILING FOR A PROPOSED CURB CUT No product keyword matched | 1 | Nov 9, 2026 |
| B | LIBERTY NY RESTORATION IN NYC DOB building permits | 11 | General Construction · EXPOSURE 01 PARAPET WALL AND FACADE REPAIR TO RESOLVE THE DOB VIOLATION #031226CPI30801SB. NO CHANGE IN EGRESS, USE AND OCCUPANCY. No product keyword matched | 2 | Nov 9, 2026 |
| B | MEYER EQUITIES LLC NYC DOB building permits | 11 | General Construction · INTERIOR RENOVATION OF 7TH FLOOR COMMERCIAL SPACE AS PER PLANS FILED HEREWITH. No product keyword matched | 5 | Nov 9, 2026 |
| B | Lincoln Property Company NYC DOB building permits | 11 | General Construction · ALTERATION FOR INTERIOR TENANT IMPROVEMENTS IN AN EXISTING PHYSICAL CULTURE ESTABLISHMENT ON THE FIRST AND SECOND FLOORS. AS PER PLANS. NO CHANGE IN BULK, USE, OCCUPANCY, OR EGRESS. No product keyword matched | 14 | Nov 9, 2026 |
| B | 164 HANCOCK DEVELOPMENT LLC NYC DOB building permits | 11 | Structural · INSTALLATION OF NEW ROOF-MOUNTED STEEL DUNNAGE TO SUPPORT THE PROPOSED OUTDOOR AIR-CONDITIONING UNIT, INCLUDING ASSOCIATED STRUCTURAL STEEL FRAMING, CONNECTIONS, ANCHORAGE, AND RELATED WORK, AS INDICATED ON THE APPROVED ARCHITECTURAL AND MECHANICAL PLANS. No product keyword matched | 2 | Nov 9, 2026 |
| B | LISA MANAGEMENT NYC DOB building permits | 11 | Sidewalk Shed · ERECT, MAINTAIN & DISMANTLE OF HEAVY DUTY SIDEWALK SHED PER DRAWINGS ATTACHED HEREWITH No product keyword matched | 8 | Nov 9, 2026 |
| B | FERRONE NYC DOB building permits | 11 | Structural · Proposed to install reinforcement to support existing floor. no change in occupancy, use and egress under this application No product keyword matched | 1 | Nov 9, 2026 |
| B | SUPERIOR MANAGEMENT INCORPORATED NYC DOB building permits | 11 | Sidewalk Shed · THE SIDEWALK SHED AT GRADN STREET AND WEST BROADWAY ELEVATIONS. INSTALLATION OF TEMPORARY CUSTOM COLOR SIDEWALK SHED AS PER PLAN. NO CHANGE IN USE, EGRESS ,OR OCCUPANCY. No product keyword matched | 1 | Nov 9, 2026 |
| B | Memorial Sloan Kettering NYC DOB building permits | 11 | Supported Scaffold · Installation and use of scaffold stair as per plans filed herewith. This application is filed in conjunction with M01205691-S2-FO. No product keyword matched | 14 | Nov 9, 2026 |
| B | PRD REALTY CORP. NYC DOB building permits | 11 | General Construction · Facade restoration including brick replacement and repointing No product keyword matched | 4 | Nov 9, 2026 |
| B | CNA CONERSTONE NYC DOB building permits | 11 | Mechanical Systems · MECHANICAL WORK FOR AN EATING AND DRINKING ESTABLISHMENT. No product keyword matched | 2 | Nov 9, 2026 |
| B | EASTERN ELITE VP, INC NYC DOB building permits | 11 | General Construction · PROPOSED ALTERATION CO TO REVISE SECOND FLOOR LAYOUT PERMITTED UNDER APPLICATION 400592131; AND TO CHANGE USE AND OCCUPANCY OF CELLAR LEVEL. NO CHANGE IN BULK PROPOSED. No product keyword matched | 1 | Nov 9, 2026 |
| B | ALL CITY EXPEDITING INC NYC DOB building permits | 11 | Supported Scaffold · INSTALLATION OF MEDIUM DUTY PIPE SCAFFOLD. No product keyword matched | 4 | Nov 9, 2026 |
| B | EMFT, LLC NYC DOB building permits | 11 | General Construction · APPLICATION FILED FOR FACADE REPAIRS AS PER PLANS HERE WITHIN. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION No product keyword matched | 3 | Nov 9, 2026 |
| B | GANIARIS REALTY GROUP NYC DOB building permits | 11 | Sidewalk Shed · INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. LIVE LOAD 300PSF. No product keyword matched | 4 | Nov 9, 2026 |
| B | HABITAT ON DEGRAW LLC NYC DOB building permits | 11 | Construction Fence · SUBMIT TEMPORARY CONSTRUCTION FENCE AT OPEN SPACE, NO CHANGE IN USE, EGRESS OR OCCUPANCY. No product keyword matched | 11 | Nov 9, 2026 |
| B | BALOG CONSTRUCTION LLC NYC DOB building permits | 11 | Structural · STRUCTURAL WITH THE RENOVATION OF EXISTING DUPLEX APARTMENT PENTHOUSE A ON THE 9TH & 10TH FLOORS & ROOF. PAA P2 FILED TO AMEND FILING. AS PER PLANS FILED HEREWITH. NO CHANGE OF USE, EGRESS, OR OCCUPANCY. No product keyword matched | 3 | Nov 9, 2026 |
| B | DEDAJ CONSTRUCTION CORP. NYC DOB building permits | 11 | Foundation · New Apartment Building No product keyword matched | 5 | Nov 9, 2026 |
| B | Morrisania Supportive LLC NYC DOB building permits | 11 | Suspended Scaffold · INSTALLATION OF TEMPORARY SUSPENDED SCAFFOLD EQUIPMENT. NO CHANGES IN THE MEANS OF EGRESS. No product keyword matched | 3 | Nov 9, 2026 |
| B | WAVE ONE LIC INC NYC DOB building permits | 11 | Mechanical Systems · INSTALL (1) NEW COMMERCIAL KITCHEN HOOD @1ST. FLOOR. NO CHANGE IN USE, EGRESS AND OCCUPANCY. No product keyword matched | 1 | Nov 9, 2026 |
| B | 511 EAST 80TH STREET LLC NYC DOB building permits | 11 | Structural · INSTALLATION OF TEMPORARY SHORING AND NETTING AS PER PLANS SUBMITTED HEREWITH. THERE IS NO CHANGE IN USE, EGRESS OR OCCUPANCY. No product keyword matched | 2 | Nov 9, 2026 |
| B | KCD CONSTRUCTION CORP NYC DOB building permits | 11 | General Construction · General Construction plans filed herewith to show minor renovation work at interior only of 13 Christopher St. at basement level to create hair salon. No change to use, egress, or occupancy. No product keyword matched | 4 | Nov 9, 2026 |
| B | RESNICK SEAPORT, LLC NYC DOB building permits | 11 | General Construction · General construction for AFL-CIO on 5th floor No product keyword matched | 3 | Nov 9, 2026 |