Home
Workspace
Klise
Target
Seer
Signals
Competitors
Contacts
Log in
Seer/Prospects/Lincoln Property Company
Back to prospects

Lincoln Property Company

Brooklyn, Bronx, Manhattan, NY · Outside service region

AnalysisCompany profileContactsEmail draftSources

Analysis

Overall 11 / 20Tier B
Keyword
Seer chat
0 / 5
No keyword-matching signal in the last 90 days.
Freshness5 / 5Latest signal is within 30 days.
Place5 / 5NY matches the seller’s region.
Target fit1 / 5No target company types set; baseline is 1 star.

Company profile

Company
Lincoln Property Company
Source for Company (opens in new tab)
Signal source
NYC DOB building permits
Signal date
Nov 9, 2026
Source for Signal date (opens in new tab)
Signal count
39 saved signals, 14 in the last 90 days
Signal summary
General Construction · ALTERATION FOR INTERIOR TENANT IMPROVEMENTS IN AN EXISTING PHYSICAL CULTURE ESTABLISHMENT ON THE FIRST AND SECOND FLOORS. AS PER PLANS. NO CHANGE IN BULK, USE, OCCUPANCY, OR EGRESS.
Source for Signal summary (opens in new tab)
Address
839 STEWART AVE
Source for Address (opens in new tab)
Phone
Not found
Email
Not found
Website
Not found
Decision maker
Not found
DM title
Not found

Contacts

No contact found

Phone: not found · See the source record

Log in to search contacts

Email draft

Add a contact before generating a draft.

Sources

39 signals
  • Nov 9, 2026
    Permit
    General Construction · ALTERATION FOR INTERIOR TENANT IMPROVEMENTS IN AN EXISTING PHYSICAL CULTURE ESTABLISHMENT ON THE FIRST AND SECOND FLOORS. AS PER PLANS. NO CHANGE IN BULK, USE, OCCUPANCY, OR EGRESS.
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)
  • Nov 5, 2026
    Permit
    Suspended Scaffold · INSTALATION OF OUTRIGGER FOR FACADE REPAIR.
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)
  • Oct 20, 2026
    Permit
    General Construction · GENERAL CONSTRUCTION MODIFICATIONS TAKING PLACE ON THE CELLAR, 1-2ND FLOORS AS PER DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)
  • Oct 20, 2026
    Permit
    Structural · Structural modifications taking place on the 1st floor as indicated on the drawings.
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)
  • Oct 20, 2026
    Permit
    Mechanical Systems · MECHANICAL MODIFICATIONST TAKING PLACE ON THE CELLAR & 1ST FLOOR AS PER DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)
  • Oct 2, 2026
    Permit
    General Construction · Target: Interior modifications to convert the former CVS space into accessory storage as per plans filed herewith. No change in use, egress or occupancy. Filed in conjunction with DOB Now M01425967-I1 (MS)
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)
  • Oct 2, 2026
    Permit
    Mechanical Systems · Target: Modifications to the Mechanical Systems as per plans filed herewith. No change in use, egress or occupancy. Filed in conjunction with DOB Now M01411100-I1 (GC)
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)
  • Sep 18, 2026
    Permit
    Plumbing · PLUMBING MODIFICATIONS TAKING PLACE ON THE 12TH FLOOR AS PER DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)
  • Sep 17, 2026
    Permit
    Sprinklers · SPRINKLER MODIFICATIONS TAKING PLACE ON THE 12TH FLOOR AS PER DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)
  • Sep 14, 2026
    Permit
    Mechanical Systems · MECHANICAL MODIFICATIONS TAKING PLACE ON THE 12TH FLOOR AS PER DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)
  • Sep 11, 2026
    Permit
    Suspended Scaffold · Application for the installation and use of suspended scaffold as per plans filed herein. No change in egress, use, or occupancy.
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)
  • Sep 11, 2026
    Permit
    General Construction · GENERAL CONSTRUCTION MODIFICATIONS TAKING PLACE ON THE 12TH FLOOR AS PER DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)
  • Aug 17, 2026
    Permit
    Plumbing · Remove plumbing fixtures and piping. Install new domestic water, sanitary and vent piping, one water closet, lavatory, drinking fountain, mop sink, electric water heater and expansion tank. No change in use, egress or occupancy.
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)
  • Aug 14, 2026
    Permit
    Plumbing · Modification to Plumbing systems as per plans filed herewith.
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)
  • Jul 30, 2026
    Permit
    Sprinklers · Modify existing automatic wet sprinkler system in conjunction with 1st floor interior tenant fit-out.
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)
  • Jul 13, 2026
    Permit
    General Construction · Interior renovation as per plans filed herewith.
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)
  • Jul 2, 2026
    Permit
    General Construction · full interior, non-structural demolition of the tenants first-floor space, including removal of partitions, finishes, ceilings, electrical, lighting, mechanical systems (no exterior elements), and restroom plumbing. No exterior work included.
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)
  • Jun 30, 2026
    Permit
    General Construction · Full non-structural interior demo; new partitions, ceilings, and flooring in fire-rated retail space. Limited storefront, no exterior work. at Broadway & Bond: clean existing windows/doors
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)
  • Jun 25, 2026
    Permit
    Mechanical Systems · Interior mechanical work consisting of removal and replacement of ductwork distribution, installation of new exhaust system, air curtain, and controls. Existing AHU to remain. No change to use, egress, or occupancy.
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)
  • Jun 24, 2026
    Permit
    Construction Fence · Temporary Construction Fence
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)