Home
Workspace
Klise
Target
Seer
Signals
Competitors
Contacts
Log in
Seer/Prospects/Memorial Sloan Kettering
Back to prospects

Memorial Sloan Kettering

Manhattan, MANHATTAN, NY · Outside service region

AnalysisCompany profileContactsEmail draftSources

Analysis

Overall 11 / 20Tier B
Keyword
Seer chat
0 / 5
No keyword-matching signal in the last 90 days.
Freshness5 / 5Latest signal is within 30 days.
Place5 / 5NY matches the seller’s region.
Target fit1 / 5No target company types set; baseline is 1 star.

Company profile

Company
Memorial Sloan Kettering
Source for Company (opens in new tab)
Signal source
NYC DOB building permits
Signal date
Nov 9, 2026
Source for Signal date (opens in new tab)
Signal count
35 saved signals, 14 in the last 90 days
Signal summary
Supported Scaffold · Installation and use of scaffold stair as per plans filed herewith. This application is filed in conjunction with M01205691-S2-FO.
Source for Signal summary (opens in new tab)
Address
1141 OAK POINT AVENUE
Source for Address (opens in new tab)
Phone
Not found
Email
Not found
Website
Not found
Decision maker
Not found
DM title
Not found

Contacts

No contact found

Phone: not found · See the source record

Log in to search contacts

Email draft

Add a contact before generating a draft.

Sources

35 signals
  • Nov 9, 2026
    Permit
    Supported Scaffold · Installation and use of scaffold stair as per plans filed herewith. This application is filed in conjunction with M01205691-S2-FO.
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)
  • Oct 29, 2026
    Permit
    Sidewalk Shed · INSTALLATION OF TEMPORARY SIDEWALK SHED AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)
  • Oct 29, 2026
    Permit
    General Construction · Phase 0 - M1 Cafe and Giftshop Alteration - Interior renovations including modifications to non load bearing partitions, ceilings, and related construction as per plans filed herewith. No change in use, egress, or occupancy.
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)
  • Oct 29, 2026
    Permit
    Mechanical Systems · Installation of two modular water-cooled chillers. Installation of new hot water and secondary condenser water duty/standby pumps. Removal of existing filtrine MRI chiller and replacement with new plate and frame heat exchanger with associated piping.
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)
  • Oct 29, 2026
    Permit
    General Construction · Filing herewith General construction work as per plans submitted. No change in egress, use, or occupancy.
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)
  • Oct 27, 2026
    Permit
    Plumbing · Filing herewith for plumbing modifications as per plans submitted. No change of egress, use, or occupancy.
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)
  • Oct 21, 2026
    Permit
    Mechanical Systems · FILING HEREWITH MECHANICAL WORK AS PER PLANS SUBMITTED. NO CHANGE IN OCCUPANCY, USE, OR EGRESS.
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)
  • Oct 8, 2026
    Permit
    Protection and Mechanical Methods · MINI CRANE PLACEMENT. THIS APPLICATION INVOLVES NO CHANGE IN USE, OCCUPANCY OR EGRESS.
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)
  • Oct 8, 2026
    Permit
    General Construction · Filing herewith for general construction as per plans submitted herewith. No change to egress, use, or occupancy.
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)
  • Oct 5, 2026
    Permit
    Sprinklers · MSK LIPSTICK INFRA: MODIFICATIONS TO HVAC DUCTWORK, PIPING AND EQUIPMENT TO ACCOMMODATE THE INFRASTRUCTURE PROJECT IN THE EXISTING BUILDING. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)
  • Oct 1, 2026
    Permit
    General Construction · Filing herewith for general construction as per plans submitted. No change in occupancy use or egress.
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)
  • Aug 20, 2026
    Permit
    Standpipe · INSTALLATION OF TEMPORARY SUPERVISE TEMPORARY STANDPIPE SYSTEM FOR A NEW CLINICAL BUILDING
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)
  • Aug 17, 2026
    Permit
    General Construction · Filing herewith general construction on the 3rd floor - (Theranostic Haupt) No change in egress, use, or occupancy.
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)
  • Aug 17, 2026
    Permit
    Mechanical Systems · Filing herewith for mechanical work as per plans submitted. (Haupt 3 Theranostic). No change in egress, use, or occupancy.
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)
  • Aug 4, 2026
    Permit
    Mechanical Systems · Provide exhaust connection for new lab equipment to be installed. Exhaust duct to run through rated wall and connect into existing exhaust system within mechanical room. No change in occupancy, use or egress.
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)
  • Jul 31, 2026
    Permit
    Sidewalk Shed · INSTALLATION OF TEMPORARY SIDEWALK SHED AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)
  • Jul 17, 2026
    Permit
    Supported Scaffold · Installation and use of scaffold stair as per plans filed herewith. This application is filed in conjunction with M01205691-S2-FO.
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)
  • Jul 16, 2026
    Permit
    Mechanical Systems · BOBST 4 CARDIOLOGY: MODIFICATION TO HVAC DUCTWORK AND PIPING TO ACCOMMODATE THE CARDIOLOGY SUITE RENOVATION THE EXISTING HOSPITAL BUILDING. NO CHANGE TO ZONING, USE, EGRESS OR OCCUPANCY.
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)
  • Jul 15, 2026
    Permit
    General Construction · BOBST 4 CARDIOLOGY: MODIFICATION TO INTERIOR PARTITIONS AND FINISHES TO ACCOMMODATE THE CARDIOLOGY SUITE RENOVATION THE EXISTING HOSPITAL BUILDING. NO CHANGE TO ZONING, USE, EGRESS OR OCCUPANCY.
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)
  • Jul 8, 2026
    Permit
    Plumbing · BOBST 4 CARDIOLOGY: PLUMBING AND SPRINKLER MODIFICATIONS TO ACCOMMODATE THE CARDIOLOGY SUITE RENOVATION THE EXISTING HOSPITAL BUILDING. NO CHANGE TO ZONING, USE, EGRESS OR OCCUPANCY.
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)