General Construction · REACH 4 - New flood wall construction per BPCR Project. Scope includes excavation, grading, landscaping, soil improvement, utility and drainage upgrades, fill placement, and foundation stabilization. See G-004.00. No change to use, egress or occupancy.
General Construction · REACH 4 - New flood wall construction per BPCR Project. Scope includes excavation, grading, landscaping, soil improvement, utility and drainage upgrades, fill placement, and foundation stabilization. See G-004.00. No change to use, egress or occupancy.
No product keyword matched · NYC DOB building permits
General Construction · Reach 4 - FBS includes elevated platform with precast decks, cast-in-place slabs/beams, floodwall to EL 16.5' on drilled shafts, roller gates, pipe-pile barrier, micropile T-wall, and seawall for wave dissipation. No change to use, egress or occupancy.
No product keyword matched · NYC DOB building permits
Structural · FILING FOR ST/FO WORK FOR REACH 2 - CONSTRUCTION OF A PLATFORM CONSISTING OF PRECAST/PRESTRESSED VOIDED DECKS WITH A TOPPING SLAB SPANNING 42-FT ON AVERAGE ON DRILLED SHAFT SUPPORTED BENTS. NO CHANGE TO USE, EGRESS OR OCCUPANCY. SEE COMMENTS BELOW.
No product keyword matched · NYC DOB building permits
Support of Excavation · Support of Excavation work for Reach 2 - Construction of an elevated platform, including installation of landscaping, benches, and pavers on top of the platform, for the North Battery Park City Resiliency Project. No change to use, egress or occupancy.
No product keyword matched · NYC DOB building permits
Support of Excavation · Scope of Work: Reach 6 - Construction of flood barrier system for the BPCA north/west battery park city resiliency project includes Support of excavation work. No change to use, egress or occupancy.
No product keyword matched · NYC DOB building permits
Mechanical Systems · REACH 6 - TEMPORARY RELOCATION OF HVAC UNIT TO COMPLETE CONSTRUCTION OF FLOOD BARRIER SYSTEM FOR THE BPCA NORTH/WEST BATTERY PARK CITY RESILIENCY PROJECT. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
No product keyword matched · NYC DOB building permits
Foundation · Reach 6 - The FBS includes micropile-founded T-walls, L-walls, founded closure gates at street crossings (roller gates at Thames, Rector, Albany), stoplogs for Gateway Plaza pool access, & an integral tide gatewell. No change to use, egress or occupancy.
No product keyword matched · NYC DOB building permits
Earth Work · Reach 6-New flood wall constr. for NWBPCR project. Scope includes excavation, grading, landscaping, soil improvement. Add & compact fill to stabilize site with erosion cont. Stabilize foundations of adj. structures. No change to use, egress or occupancy.
No product keyword matched · NYC DOB building permits
Earth Work · Filing for Earthwork for Reach 2 - THIS SCOPE INVOLVES EXCAVATION, GRADING, LANDSCAPING SOIL IMPROVEMENT PER PLANS. ADDING AND COMPACTING FILLTO STABILIZE THE SITE WITH EROSION CONT. STABILIZING FOUNDATION OF ADJACENT STRUCTURES.
No product keyword matched · NYC DOB building permits
Plumbing · Remove/replace private drainage in Pumphouse Park; install new 12 drain to existing watercourse; reconfigure drainage to separate protected vs. flood side; add 5 outfalls, 22 trench drains, 35 area drains, permeable pavers, and planter underdrains.
No product keyword matched · NYC DOB building permits
Foundation · Filing for Structural/Foundation work for Reach 5 - Construction of a flood barrier system for the BPCA North/West Battery Park City Resiliency project. No change to use, egress or occupancy.
No product keyword matched · NYC DOB building permits
Foundation · Wagner Park redevelopment for floor barrier system. (foundation work) Package 4. No change of use egress occupancy under this application.
No product keyword matched · NYC DOB building permits
Earth Work · Wagner Park redevelopment for floor barrier system. (Earthwork/ Landscape work) Package 4. No change of use egress or occupancy under this application
No product keyword matched · NYC DOB building permits
Mechanical Systems · Filing Mechanical work for Reach 5. Mechanical installations inside underground bridging structures for the BPCA North/West Battery Park City Resiliency project. No heating and cooling - Exhaust Ventilation only. No change to use, egress or occupancy.
No product keyword matched · NYC DOB building permits