Companies with dated public signals, ranked by fit with your products.
| Tier | Company | Score | Latest signal | Signals 90d | Last signal |
|---|---|---|---|---|---|
| B | ZABDAV LLC NYC DOB building permits | 11 | Mechanical Systems · In-kind replacement of one 10-ton and one 6-ton split system heat pump condensing unit and nine split system heat pump air handling units. Reconnect to existing supply, return, & OA ducts. New refrigerant piping to maintain existing penetrations/routing. No product keyword matched | 1 | Nov 9, 2026 |
| B |
| CENTRAL PARK CONSERVANCY NYC DOB building permits |
| 11 |
Plumbing · Plumbing work associated with the Bethesda Fountain and Terrace Complex renovation in Central Park. No change of use, egress or occupancy. No product keyword matched |
| 5 |
| Nov 9, 2026 |
| B | SAFELINE GROUP INC. NYC DOB building permits | 11 | Sidewalk Shed · PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. LIVE LOAD 300 LBS PER SQUARE FEET. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION. No product keyword matched | 36 | Nov 9, 2026 |
| B | TEKA ENTERPRISES INC NYC DOB building permits | 11 | General Construction · Interior alteration, building thermal envelope, fenestration and lighting. Heating, cooling, ventilation, and service water heating are filed under a sep mech and plumbing app for gas work, new heating equipment. Electric Permit is filed separately. No product keyword matched | 1 | Nov 9, 2026 |
| B | GEORGE COMFORT & SONS, INC. NYC DOB building permits | 11 | Suspended Scaffold · Rigging for Industrial Rope Access No product keyword matched | 18 | Nov 9, 2026 |
| B | TOTAL NY CONSTRUCTION CORP NYC DOB building permits | 11 | Sidewalk Shed · INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION. SIDEWALK SHED SHALL COMPLY WITH CHAPTER 33 OF THE 2014 NYC BUILDING CODE. No product keyword matched | 10 | Nov 9, 2026 |
| B | THE NEW YORK HOTEL TRADES COUNCIL H NYC DOB building permits | 11 | Suspended Scaffold · INSTALLATION OF TEMPORARY SUSPENDED SCAFFOLDS PER PLAN SUBMITTED. WORK SHALL COMPLY WITH 2022 BUILDING CODE CHAPTER 33. NO CHANGE IN USE, EGRESS AND/OR OCCUPANCY WITH THIS APPLICATION. No product keyword matched | 2 | Nov 9, 2026 |
| B | MOD CONSULTANTS LLC NYC DOB building permits | 11 | General Construction · HEREWITH FILING FOR HORIZONTAL ENLARGEMENT, INTERIOR RENOVATION. NO CHANGE IN USE EGRESS OR OCCUPANCY No product keyword matched | 7 | Nov 9, 2026 |
| B | METFLOW FIRE CONTROL LLC NYC DOB building permits | 11 | Standpipe · Sprinkler / Standpipe sytems filed in conjunction with NB # B00953932-I1 No product keyword matched | 11 | Nov 9, 2026 |
| B | MEGA PLBG CORP NYC DOB building permits | 11 | Standpipe · FILING HEREWITH INSTALLATION OF PRESSURIZED TEMPORARY STANDPIPE ALARM AS PER PLANS. ALL WORK DONE IN CONJUNCTION WITH NEW BUILDING APPLICATION X00930334-I1. NO CHANGE IN USE, EGRESS OR OCCUPANCY. No product keyword matched | 9 | Nov 9, 2026 |
| B | METFLOW MECHANICAL LLC NYC DOB building permits | 11 | Plumbing · Plumbing filed in conjunction with NB B00953932-I1 No product keyword matched | 18 | Nov 9, 2026 |
| B | SOHO CONTRACTING CORP NYC DOB building permits | 11 | Sidewalk Shed · ERECT, MAINTAIN & DISMANTLE OF HEAVY DUTY SIDEWALK SHED PER DRAWINGS ATTACHED HEREWITH No product keyword matched | 2 | Nov 9, 2026 |
| B | 60 G NYC DOB building permits | 11 | Suspended Scaffold · Installation of suspended scaffold for facade work or inspection. No product keyword matched | 1 | Nov 9, 2026 |
| B | MASPETH CONTRACTING CORP NYC DOB building permits | 11 | Suspended Scaffold · FILE SUSPENDED SCAFFOLD OUTRIGGER SYSTEMS FOR FACADE RESTORATION AND INSPECTION. No product keyword matched | 7 | Nov 9, 2026 |
| B | HIGHLINE CONSTRUCTION GR NYC DOB building permits | 11 | General Construction · Renovation of an existing apartment #3B on the third floor. Work includes non-structural demolition and general construction as per plans filed herewith. No change to use, egress or occupancy. No product keyword matched | 18 | Nov 9, 2026 |
| B | IMPACT BUILDERS CORP NYC DOB building permits | 11 | Mechanical Systems · Mechanical work filed in conjunction with ALT-CO. New split system for heating and cooling with new ventilation systems. No product keyword matched | 7 | Nov 9, 2026 |
| B | NEW AMERICAN CONSTRUCTION INC NYC DOB building permits | 11 | Protection and Mechanical Methods · INSTALLATION OF TEMPORARY NEEDLE BEAM AS PER PLANS. NEEDLE BEAM SHALL COMPLY WITH THE CHAPTER #33 OF THE CODE. NO CHANGES IN USE EGRESS OR OCCUPANCY UNDER THIS APPLICATION. No product keyword matched | 56 | Nov 9, 2026 |
| B | CFA MANAGEMENT INC NYC DOB building permits | 11 | General Construction · REPLACEMENT OF DEFECTIVE LINTELS, SKYLIGHT, AND SKYLIGHT SUPPORTS. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. No product keyword matched | 5 | Nov 9, 2026 |
| B | KG SPRINKLER CORP NYC DOB building permits | 11 | Sprinklers · Proposed: plumbing and sprinkler work associated with the interior renovation of the existing triplex level apartments ( 14th-16th floors). No change of use, egress or occupancy. No product keyword matched | 7 | Nov 9, 2026 |
| B | EXPERT PLUMBING & HEATING NYC DOB building permits | 11 | Plumbing · Proposing to install new and replace existing plumbing fixtures in addition install new gas meter and new combo boiler and hwh no change in use egress or occupancy No product keyword matched | 4 | Nov 9, 2026 |
| B | NEW YORK STOCK EXCHANGE NYC DOB building permits | 11 | Plumbing · Plumbing modifications on construction level 9 (tenant level 8) for terrace work as per plans filed herewith. No change in use, egress, or occupancy. No product keyword matched | 7 | Nov 9, 2026 |
| B | ATLAS CAPITAL GROUP LLC NYC DOB building permits | 11 | Sprinklers · Modification of existing sprinkler system for suites 510 and 520 to include removal and replacement of sprinkler heads and piping as shown on plans. No product keyword matched | 5 | Nov 9, 2026 |
| B | SB RENOVATION & MODELING NYC DOB building permits | 11 | General Construction · HEREWITH FILING FOR GENERAL CONSTRUCTION OF FOUNDATION, AND EARTHWORK DESIGN OF RETAINING WALL IN FRONT YARD. No product keyword matched | 21 | Nov 9, 2026 |
| B | NEW YORK CITY PRIME CORP NYC DOB building permits | 11 | Sidewalk Shed · INSTALLATION OF 300 PSF SIDEWALK SHED AS PER PLANS. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE 2022 CODE. NO CHANGES IN USE, EGRESS OR OCCUPANCY IN THIS APPLICATION. No product keyword matched | 47 | Nov 9, 2026 |
| B | King Smith Development LLC NYC DOB building permits | 11 | Construction Fence · PROPOSED TEMPORARY CONSTRUCTION FENCE WORK AT OPEN SPACE. INSTALL OUTSIDE 3 FEET OF FRONT PROPERTY LINE ON SMITH STREET AND OUTSIDE 6 FEET OF FRONT PROPERTY LINE ON PACIFIC STREET. AS PER PLAN. IN CONJUNCTION WITH NB APPLICATION#321386102. No product keyword matched | 1 | Nov 9, 2026 |
| B | Cushman & Wakefield NYC DOB building permits | 11 | General Construction · Interior fit-out including /renovation of existing core restrooms as per plans filed herewith. No change to use, egress or occupancy. No product keyword matched | 49 | Nov 9, 2026 |
| B | JJK BUILDING CONSULTING NYC DOB building permits | 11 | Foundation · VERTICAL & HORIZONTAL EXTENSION OF EXISTING ONE FAMILY HOUSE + ADU. OBTAIN NEW C OF O. No product keyword matched | 13 | Nov 9, 2026 |
| B | JPMorgan Chase Bank, N.A. NYC DOB building permits | 11 | Sprinklers · THE FIRE PROTECTION SCOPE OF WORK SUBMITTED UNDER THIS APPLICATION ENTAILS DEMOLITION OFEXISTING MEP SERVICES. THE SYSTEMS INCLUDE SPRINKLER PIPING, MAINS, SPRINKLER CONTROL VALVE ASSEMBLIES, AND FIRE PROTECTION EQUIPMENT. No product keyword matched | 45 | Nov 9, 2026 |
| B | FIRST WORLD DEVELOPMENT NYC DOB building permits | 11 | Construction Fence · FILLING FOR A TEMPORARY CONSTRUCTION FENCE. No product keyword matched | 7 | Nov 9, 2026 |
| B | SAINT ANN'S SCHOOL NYC DOB building permits | 11 | Protection and Mechanical Methods · INSTALLATION OF TEMPORARY BARRICADE AS PER PLAN. NO CHANGE IN USE, EGRESS, OR OCCUPANCY No product keyword matched | 3 | Nov 9, 2026 |
| B | LCS RESTORATION CORP NYC DOB building permits | 11 | Supported Scaffold · INSTALLATION OF PIPE SCAFFOLDING AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CHAPTER # 33 OF THE 2022 CODE. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION. No product keyword matched | 31 | Nov 9, 2026 |
| B | SACCO& FILLAS NYC DOB building permits | 11 | Supported Scaffold · INSTALLATION OF 300 PSF SIDEWALK SHED, OVERHEAD PROTECTION, PIPE SCAFFOLD, MATERIAL STORAGE AND ROOF PROTECTION AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CHAPTER #33 OF THE 2022 CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION. No product keyword matched | 3 | Nov 9, 2026 |
| B | MYRTLE DEVELOPMENT LLC NYC DOB building permits | 11 | Construction Fence · PROPOSED INSTALLATION OF TEMPORARY CONSTRUCTION FENCE IN CONJUMCTION WITH ALTERATION-CO APPLICATION # Q01450101-I1 No product keyword matched | 3 | Nov 9, 2026 |
| B | C/O ROSE ASSOCIATES, INC. NYC DOB building permits | 11 | Mechanical Systems · MECHANICAL WORK AS SHOWN ON PLANS FOR INTERIOR RENOVATION OF EXISTING SPACE (UNIT 2911). No product keyword matched | 10 | Nov 9, 2026 |
| B | HUA YANG INC NYC DOB building permits | 11 | Supported Scaffold · INSTALLATION OF 300 PSF SIDEWALK SHED, PIPE SCAFFOLD AND NEEDLE BEAM AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CHAPTER #33 OF THE 2022 CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION. No product keyword matched | 3 | Nov 9, 2026 |
| B | ROSS DRESS FOR LESS NYC DOB building permits | 11 | Mechanical Systems · MECHANICAL MODIFICATIONS TAKING PLACE ON 1ST FL AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. No product keyword matched | 12 | Nov 9, 2026 |
| B | SELA GROUP LLC NYC DOB building permits | 11 | Plumbing · INSTALLATION OF PLUMBING SYSTEM THROUGHOUT EXISTING THREE STORY BUILDING WITH BASEMENT AND CELLAR.NO CHANGE IN USE ,MEANS OF GRESS OR OCCUPANCY. No product keyword matched | 2 | Nov 9, 2026 |
| B | R&A REMODELING LLC NYC DOB building permits | 11 | Structural · APPLICATION FILED FOR STRUCTURAL WORK AS PER PLANS HERE WITHIN. No product keyword matched | 6 | Nov 9, 2026 |
| B | INFINITI ESC PLUMBING COR NYC DOB building permits | 11 | Plumbing · all plumbing work in conjunction with the main filing #B01274754-I1 No product keyword matched | 32 | Nov 9, 2026 |
| B | MATTHEW ADAM PROPERTIES NYC DOB building permits | 11 | General Construction · REMOVE AND CONSTRUCT NEW NON BEARING PARTITIONS AND FINISHES IN APT#9N /#10N 9 & 10 Floor , FLOORING AND CEILING WORK ALL . AS PER PANS SUBMITTED HEREWITH. NO CHANGE. IN USE, EGRESS OR OCCUPANCY. No product keyword matched | 7 | Nov 9, 2026 |
| B | PSI PARTNERS, LLC NYC DOB building permits | 11 | Sprinklers · SPRINKLER MODIFICATIONS TAKING PLACE ON THE 12TH FLOOR AS PER DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY. No product keyword matched | 3 | Nov 9, 2026 |
| B | BRP DEVELOPMENT CORP NYC DOB building permits | 11 | Suspended Scaffold · TEMPORARY SUSPENDED SCAFFOLD AS PER DRAWINGS. SUSPENDED SCAFFOLD SHALL COMPLY WITH CH 33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION. No product keyword matched | 9 | Nov 9, 2026 |
| B | UNITED LAND COSTRUCTION I NYC DOB building permits | 11 | Construction Fence · CONSTRUCTION FENCE No product keyword matched | 5 | Nov 9, 2026 |
| B | East 43RD NYC LLC NYC DOB building permits | 11 | General Construction · Replace existing storefront as shown. No product keyword matched | 14 | Nov 9, 2026 |
| B | HUBB NYC PROPERTIES LLC NYC DOB building permits | 11 | General Construction · INTERIOR RENOVATION FOR DENTAL OFFICE AT 1ST FLOOR ; NO CHANGE USE, EGRESS OR OCCUPANCY. No product keyword matched | 9 | Nov 9, 2026 |
| B | ADVANCED PLUMBING MECH NYC DOB building permits | 11 | Plumbing · PROPOSED PLUMBING WORK AS PER PLAN, FILED IN CONJUNCTION WTH ALT-1 APPLICATION B00910221-I1 No product keyword matched | 11 | Nov 9, 2026 |
| B | CELTIC SERVICES NYC INC NYC DOB building permits | 11 | Protection and Mechanical Methods · MECHANICAL DEMOLITION EQUIPMENT USE No product keyword matched | 12 | Nov 9, 2026 |
| B | ZAR PROPERTY NY NYC DOB building permits | 11 | Sprinklers · Additions and modification to Sprinkler systems as per plans filed herewith. No product keyword matched | 13 | Nov 9, 2026 |
| B | TITAN EQUITY GROUP NYC DOB building permits | 11 | General Construction · HEREWITH FILE TWO STORY WITH CELLAR HOUSE OF WORSHIP. No product keyword matched | 11 | Nov 9, 2026 |
| B | YARKS NYC INC NYC DOB building permits | 11 | Sidewalk Shed · INSTALLATION OF 300PSF SIDEWALK SHED AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CH #33 OF THE NYC CODE 2022. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION. No product keyword matched | 45 | Nov 9, 2026 |