Plumbing · Plumbing modifications on construction level 9 (tenant level 8) for terrace work as per plans filed herewith. No change in use, egress, or occupancy.
Plumbing · Plumbing modifications on construction level 9 (tenant level 8) for terrace work as per plans filed herewith. No change in use, egress, or occupancy.
No product keyword matched · NYC DOB building permits
General Construction · Temporary structure for a Heinz exhibit at NYSE plaza outdoors. Removed at the end of the programing. No changes to existing structures, use or egress. SAPO ID#983772
No product keyword matched · NYC DOB building permits
Plumbing · Removal of plumbing fixtures and sprinkler heads and installation of temporary heads as per plans filed herewith. No change to use, egress, occupancy
No product keyword matched · NYC DOB building permits
Sprinklers · Removal of plumbing fixtures and sprinkler heads and installation of temporary heads as per plans filed herewith. No change to use, egress, occupancy
No product keyword matched · NYC DOB building permits
General Construction · INTERIOR DEMOLITION OF AN EXISTING CELLAR-LEVEL (B1) KITCHEN/BOH SPACE. WORK INCLUDES DEMOLITION OF PARTITIONS, DOORS, CEILINGS, FINISHES, LIGHTING, MILLWORK, KITCHEN EQUIPMENT, ETC. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.
No product keyword matched · NYC DOB building permits
Plumbing · Plumbing modifications to existing domestic water system and removal of gas equipment on level 7 as per plans filed herewith. No change in use, egress, or occupancy.
No product keyword matched · NYC DOB building permits
General Construction · PREPARATION OF TEMPORARY EGRESS PLANS FOR LIMITED OCCUPANCY OF 150 OCCUPANTS OR LESS ON WEEKENDS FOR USE WHILE ALTERATION WORK IS BEING PERFORMS ON WEEKEND ONLY.
No product keyword matched · NYC DOB building permits
General Construction · Renovation of select areas of tenant level 08 (Construction Level 9) and minor associated work on levels b2, 07, and 09. No change in use, egress, or occupancy.
No product keyword matched · NYC DOB building permits
Structural · Provide support framing for hung operable partition. Provide framing for wind screen at 8th floor terrace (9th flr const). Provide slab support framing for MEP openings at 8th & 9th floor (9th and 10th flr const). No change in use, egress, or occupancy
No product keyword matched · NYC DOB building permits
General Construction · INSTALL & REMOVE TEMP. STRUCTURES FOR ANNUAL EVENT, NO ALTERATION TO EXIST. STRUCTURES. TPA & SAPO PERMIT REQUIRED. PRODUCER IS RESPONSIBLE T O MONITOR EVENT WEATHER CONDITIONS & IMPLEMENT APPROPRIATE ACTIONS. ALL PROD EQUIP TO BE REMOVED UPON COMPLETION
No product keyword matched · NYC DOB building permits