General Construction · APPLICATION FILED TO REFILE ALT-2 APPLICATION JOB NO. 104809977 TO REFLECT WORK REQUIRED TO RESOLVE THE AUDIT OBJECTIONS FOR APT. 1C, INCLUDING THE CREATION OF AN ADA-ADAPTABLE KITCHENETTE AND BATHROOM.
No product keyword matched · NYC DOB building permits
Mechanical Systems · APPLICATION IS FILED FOR PROPOSED MECHANICAL WORK ON EXISTING BUILDING. INSTALLATION OF HVAC SYSTEMS, KITCHEN HOOD SYSTEMS & ASSOCIATED VENTS AT CEL & 1F FL, WITH KITCHEN EXHAUST TO HIGH ROOF .NO CHANGE TO USE, EGRESS OR OCCUPANCY ON THIS APPLICATION.
No product keyword matched · NYC DOB building permits
General Construction · Application id filed for replacement of existing condensers. Installation of new spit HVAC system ready for tenant connection. All OT work at 1st, Cellar and rear yard. No change in use, egress or occupancy.
No product keyword matched · NYC DOB building permits
General Construction · Application is filed for the removal of exist'g doctor's office at Cellar level, creating a duplex apt. with the exist'g first floor unit. The proposed work does not result in an increase in the number of dwelling units or the overall floor area.
No product keyword matched · NYC DOB building permits
General Construction · Exterior repairs and facade restoration work as necessary and shown on plans submitted. No change in use, occupancy or egress proposed under this application.
No product keyword matched · NYC DOB building permits
General Construction · Application id filed for replacement of existing condensers. Installation of new spit HVAC system ready for tenant connection. All OT work at 1st, Cellar and rear yard. No change in use, egress or occupancy.
No product keyword matched · NYC DOB building permits
General Construction · Exterior facade repairs and reconstruction as necessary and shown on plans submitted. No change in use, occupancy or egress proposed under this application.
No product keyword matched · NYC DOB building permits
Suspended Scaffold · Suspended scaffold in order to perform close-up inspections and facade repairs. No change in use, occupancy or egress under this application.
No product keyword matched · NYC DOB building permits
Supported Scaffold · INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AND PIPE SCAFFOLDING AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. LIVE LOAD 300PSF.
No product keyword matched · NYC DOB building permits
Supported Scaffold · INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AND PIPE SCAFFOLDING AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. LIVE LOAD 300PSF.
No product keyword matched · NYC DOB building permits