Sprinklers · THE FIRE PROTECTION SCOPE OF WORK SUBMITTED UNDER THIS APPLICATION ENTAILS DEMOLITION OFEXISTING MEP SERVICES. THE SYSTEMS INCLUDE SPRINKLER PIPING, MAINS, SPRINKLER CONTROL VALVE ASSEMBLIES, AND FIRE PROTECTION EQUIPMENT.
Sprinklers · THE FIRE PROTECTION SCOPE OF WORK SUBMITTED UNDER THIS APPLICATION ENTAILS DEMOLITION OFEXISTING MEP SERVICES. THE SYSTEMS INCLUDE SPRINKLER PIPING, MAINS, SPRINKLER CONTROL VALVE ASSEMBLIES, AND FIRE PROTECTION EQUIPMENT.
No product keyword matched · NYC DOB building permits
Standpipe · Filing herewith for installation of Temporary Dry Standpipe for fire protection during ongoing demolition and construction as part of redevelopment project.
No product keyword matched · NYC DOB building permits
Sprinklers · THE FIRE PROTECTION SCOPE OF WORK SUBMITTED UNDER THIS APPLICATION ENTAILS DEMOLITION OFEXISTING MEP SERVICES. THE SYSTEMS INCLUDE SPRINKLER PIPING, MAINS, SPRINKLER CONTROL VALVE ASSEMBLIES, AND FIRE PROTECTION EQUIPMENT.
No product keyword matched · NYC DOB building permits
General Construction · Filing herewith General Construction for temporary conditions inclusive but not limited to partitions, doors, and hardware for interior non-structural debris removal through Madison Avenue.
No product keyword matched · NYC DOB building permits
General Construction · REMOVAL AND INSTALLATION OF INTERIOR NON-BEARING PARTITIONS AND RELATED FINISHES AS PER DRAWINGS FILED HEREWITH. IN-KIND REPLACEMENT OF TREADS AT EXISTING CONVENIENCE STAIRS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
No product keyword matched · NYC DOB building permits
Plumbing · Filing herewith plumbing scope for offices fit-out at 9th thru 11th floor as per plans. No change in use, occupancy, or egress proposed under this application
No product keyword matched · NYC DOB building permits
Plumbing · Filing herewith plumbing installations as per plans no floors 39 through 41. No change in use, occupancy, or egress proposed under this application.
No product keyword matched · NYC DOB building permits
Plumbing · Filing herewith plumbing scope for offices fit-out at 7th and 8th floors as per plans. No change in use, occupancy, or egress proposed under this application.
No product keyword matched · NYC DOB building permits
Mechanical Systems · Filing herewith mechanical/hvac ductwork and piping for floors 27 through 29. Early scope filed in Mechanical job # M01344776-I1 with construction costs included in this filing. No change in use, egress, or occupancy in this application.
No product keyword matched · NYC DOB building permits
Mechanical Systems · Filing herewith mechanical/hvac installations/modifications on floors 39 through 41. Filing in conjunction with early-phase Mechanical #M01344783-I1 approved and permitted. No change in use, egress, or occupancy in this application.
No product keyword matched · NYC DOB building permits
Mechanical Systems · Filing herewith mechanical/hvac installations/modifications on floors 24 through 26 as per plans. No change in use, egress, or occupancy in this application.
No product keyword matched · NYC DOB building permits
General Construction · Filing herewith removal and installation of interior non load bearing partitions and related finishes as per plans. No change in use, occupancy, or egress under this application.
No product keyword matched · NYC DOB building permits