Companies with dated public signals, ranked by fit with your products.
| Tier | Company | Score | Latest signal | Signals 90d | Last signal |
|---|---|---|---|---|---|
| B | MARMOL RADZINER AN ARCH NYC DOB building permits | 11 | General Construction · renovation of an existing office at the sixth floor. No product keyword matched | 1 | Oct 14, 2026 |
| B | 18 AVENUE RE LLC NYC DOB building permits | 11 |
Mechanical Systems · WORK TYPE FILED FOR REPLACEMENT OF 3 HVAC UNITS AT EXISTING COMMERCIAL ROOF OF BUILDING ON REPLACEMENT STEEL CURB CONNECTING TO EX. DUCT SYSTEM AND PIPING. No product keyword matched |
| 1 |
| Oct 14, 2026 |
| B | IRWIN FRIEDMAN & SON INC NYC DOB building permits | 11 | Plumbing · Filing herewith for cap & removal of gas service and related gas fixtures. Additionally installation of Electric Water Heater. No product keyword matched | 1 | Oct 14, 2026 |
| B | CONSIDER IT DONE PLUMBING NYC DOB building permits | 11 | Plumbing · Plumbing Modifications and Fixture Installations associated with Freezer Renovation. No change to use, egress, or occupancy. No product keyword matched | 1 | Oct 14, 2026 |
| B | 10046 NYC DOB building permits | 11 | Solar · Installation of solar panels, Roof Top, Grid Tied, railed, (12) Modules, (4.92) kW System Size No product keyword matched | 1 | Oct 14, 2026 |
| B | JLP METRO MANAGEMENT INC. NYC DOB building permits | 11 | General Construction · WINDOW LINTEL REPLACEMENT AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY WITH THIS APPLICATION No product keyword matched | 1 | Oct 14, 2026 |
| B | 260E 161 LP NYC DOB building permits | 11 | Suspended Scaffold · Inspect Site conditions for Telecom Upgrade utilizing Industrial Rope Access No product keyword matched | 1 | Oct 14, 2026 |
| B | US Auto Storage LLC NYC DOB building permits | 11 | General Construction · HEREWITH TO FILE AN ALTERATION CO. FOR PROPOSED COMMUTER PARKING ON LOT. TO ADD ATTENDANT BOOTH. EXISTING BUILDING TO REMAIN (NO WORK). NO CHANGE TO BULK OR EXITS. No product keyword matched | 1 | Oct 14, 2026 |
| B | 879 FOREST AVE LLC NYC DOB building permits | 11 | General Construction · ALT FILED TO ADDRESS BUILDING VIOLATIONS V 091326C26-02190, V 091326C26-02191. REMOVE PARTIAL VACATE ORDER. MAKE CONSTRUCTION REPAIRS AT 1ST & END FLOOR DUE TO VEHICLE ACCIDENT CONSTRUCTION SHALL BE AS SUCH TO MAINTAIN CONDITIONS PIRO TO DAMAGE No product keyword matched | 1 | Oct 14, 2026 |
| B | LA SALLE NEW YORK CITY, INC. NYC DOB building permits | 11 | Plumbing · PLUMBING FILING AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. No product keyword matched | 1 | Oct 14, 2026 |
| B | City Harvest NYC DOB building permits | 11 | Mechanical Systems · APPLICATION FILED TO INSTALL SPLIT AC SYSTEM UNITS FOR EXISTING COMMERCIAL SPACE AT SECOND FLOOR BATHROOM AND ROOF AS PER PLANS. NO CHANGE TO USE, EGRESS, OR OCCUPANCY. No product keyword matched | 1 | Oct 14, 2026 |
| B | NY CITY ELECTRIC INC NYC DOB electrical permits | 11 | Installation of new lights, smoke detectors and receptacle on the hallways, replacing PLP EL Panel No product keyword matched | 7 | Oct 14, 2026 |
| B | AMPCO TECH ELECTRIC CORP. NYC DOB electrical permits | 11 | Replace service stand pipe due to storm damage for Apt.s 4A & 4B, Replace panel in Apt 4A service equipment existing and feeds. Apt 4B existing No product keyword matched | 4 | Oct 14, 2026 |
| B | LND ELECTRIC LLC NYC DOB electrical permits | 11 | Feeder & General Wiring for Retail Space No product keyword matched | 3 | Oct 14, 2026 |
| B | BERNARDI ELECTRIC INC. NYC DOB electrical permits | 11 | Elevator modernization 2p3108 No product keyword matched | 3 | Oct 14, 2026 |
| B | TRANSFORM ELECTL CONTRS I NYC DOB electrical permits | 11 | 14 FLOOR FITOUT , GENERAL WIRING , INSTALLATION OF 1- 100 AMP PANEL , LIGHTING ,RECEPTACLES . No product keyword matched | 3 | Oct 14, 2026 |
| B | G & F.A.ST ELECTRIC INC NYC DOB electrical permits | 11 | Abraham Lincoln H.S. (K410) : 20 LIGHTS FOR SWK SHED. 2 60 AMP RUNS TO SCA TRAILER, 2 SETS OF # 2 No product keyword matched | 2 | Oct 14, 2026 |
| B | E.S.B. ELECTRIC CORP. NYC DOB electrical permits | 11 | General Wiring, service existing No product keyword matched | 3 | Oct 14, 2026 |
| B | KAMP ELECTRIC LLC NYC DOB electrical permits | 11 | Wiring for new HVAC system No product keyword matched | 3 | Oct 14, 2026 |
| B | ALL POWER ELECL INSTLRS NYC DOB electrical permits | 11 | 4th floor: Install lighting fixtures, exit signs, switches, receptacles, floor box and associated branch-circuit wiring/home runs from existing panelboards.. No product keyword matched | 2 | Oct 14, 2026 |
| B | ACTIVE ELECTRIC NYC DOB electrical permits | 11 | Replacement of electrical panel in Apartment 21J. No product keyword matched | 1 | Oct 14, 2026 |
| B | R.J.C. MECHANICAL CORP NYC DOB building permits | 11 | Plumbing · NEW AND RELOCATED PLUMBING FIXTURES AND PIPING AS PER DRAWINGS. NEW GAS PIPING TO BE INSTALLED DOWNSTREAM FROM THE EXISTING GAS METER IN THE APARTMENT, No product keyword matched | 3 | Oct 13, 2026 |
| B | NY DYNAMIC CONSTRUCTION NYC DOB building permits | 11 | Structural · HEREWITH FILING STRUCTURAL STABILIZATION PLANS FOR UNDER CONSTRUCTION 3-STORY ALT-1 BUILDING. No product keyword matched | 15 | Oct 13, 2026 |
| B | MONELLO ENTERPRISES INC NYC DOB building permits | 11 | Earth Work · ONE CAR DETACHED GARAGE No product keyword matched | 10 | Oct 13, 2026 |
| B | UPTOWN CONSTRUCTION SERVICE GROUP I NYC DOB building permits | 11 | Supported Scaffold · INSTALLATION OF PIPE SCAFFOLDING AND HEAVY DUTY SIDEWALK SHED AS PER PLANS. TEMPORARY EQUIPMENT SHALL COMPLY WITH CHAPTER #33 OF THE 2022 CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION. No product keyword matched | 9 | Oct 13, 2026 |
| B | TARGO MANAGEMENT NYC DOB building permits | 11 | General Construction · ROPOSED INTERIOR RENOVATION ON APT#3C, CONSTRUCTION WORK AS PER PLAN. NO CHANGE ON EGRESS USE OR OCCUPANCY. No product keyword matched | 1 | Oct 13, 2026 |
| B | DI MARTINI INC NYC DOB building permits | 11 | Mechanical Systems · Installation of Mechanical Units and associated components, as per plans filed herewith. No change to use, egress or occupancy. No product keyword matched | 1 | Oct 13, 2026 |
| B | METHOD GENERAL CONTRACTOR NYC DOB building permits | 11 | General Construction · INTERIOR RENOVATION OF APARTMENT 13 ON THE 4TH FLOOR, AS PER PLANS FILED HEREWITH No product keyword matched | 3 | Oct 13, 2026 |
| B | BULLS EYE CONTRACTOR INC NYC DOB building permits | 11 | Sidewalk Shed · PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED FOR REMEDIAL REPAIRS AS PER PLANS. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION. LIVE LOAD 300 PER SQUARE FEET. SIDEWALK SHED SHALL COMPLY WITH CHAPTER # 33 OF THE 2014 CODE. No product keyword matched | 7 | Oct 13, 2026 |
| B | 1426 55TH LLC NYC DOB building permits | 11 | Mechanical Systems · Mechanical plans filed herewith. No product keyword matched | 2 | Oct 13, 2026 |
| B | BOBBY ISSAC NYC DOB building permits | 11 | Plumbing · Proposed Plumbing work in conjunction with application M00652446. No product keyword matched | 2 | Oct 13, 2026 |
| B | FLUSHING KENT REALTY MANAGEMENT LLC NYC DOB building permits | 11 | General Construction · INTERIOR ALTERATIONS TO EXIST'G RETAIL SPACE. NEW CAFE WITH WORK STATION, SEATING AREA AND STORAGE ROOM. NO CHANGE IN USE, OCCUPANCY,OR EGRESS IS INVOLVED UNDER THIS APPLICATION. No product keyword matched | 3 | Oct 13, 2026 |
| B | Tesla, Inc. Austin issued construction permits, NYC DOB building permits | 11 | Plumbing · HEREWITH FILING CIVIL PLUMBING WORK IN ASSOCIATION WITH NEW EV CHARGING STATION PER PLANS. No product keyword matched | 3 | Oct 13, 2026 |
| B | DERMOT REALTY MANAGEMENT CO., LP NYC DOB building permits | 11 | Mechanical Systems · Mechanical work in existing retail space on 1st floor. No change to egress, use, or occupancy. No product keyword matched | 2 | Oct 13, 2026 |
| B | T.N.T PLBG & HTG INC NYC DOB building permits | 11 | Plumbing · NEW PLUMBING FIXTURES ATOSP, CELLAR, 1st AND 2ndFLOOR. No product keyword matched | 3 | Oct 13, 2026 |
| B | SHER MANAGEMENT NYC DOB building permits | 11 | Structural · REPAIR OF FIRE DAMAGE , WORK INCLUDES REPLACE SHEETROCK, PARTIAL ROOF JOIST, SKYLIGHT GLASS. NO CHANGE TO EXISTING USE, OCCUPANCY, OR BUILDING FOOTPRINT. No product keyword matched | 2 | Oct 13, 2026 |
| B | VIGILANTE CONTRACTING CO NYC DOB building permits | 11 | Plumbing · CAP & REMOVE EXISTING FURNACE AS PER PLANS. NO CHANGE TO USE, OCCUPANCY OR EGRESS. No product keyword matched | 4 | Oct 13, 2026 |
| B | WILLETS POINT PHASE I OWNER, LLC NYC DOB building permits | 11 | Plumbing · LANDLORD PLUMBING WORK FOR THE INITIAL FIT OUT OF A RETAIL SPACE AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY. No product keyword matched | 1 | Oct 13, 2026 |
| B | FAIZ AHMED NYC DOB building permits | 11 | Supported Scaffold · CONSTRUCTION EQUIPMENT - SCAFFOLD PROPOSED INSTALLATION OF PIPE SCAFFOLD FOR REMEDIAL REPAIRS AS PER PLANS. PIPE SCAFFOLD SHALL COMPLY WITH CHAPTER#33 OF 2022 THE NY BUILDING CODE. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION. No product keyword matched | 5 | Oct 13, 2026 |
| B | HAMOUD CONSTRUCTION CORP NYC DOB building permits | 11 | General Construction · INTERIOR RENOVATIONS OF EXISTING ONE FAMILY HOUSE No product keyword matched | 3 | Oct 13, 2026 |
| B | EMMES REALTY ASSOCIATES. AGENT NYC DOB building permits | 11 | Sprinklers · Additions/modifications to sprinkler system in conjunction with office build-out. No change to use, egress, or occupancy. No product keyword matched | 7 | Oct 13, 2026 |
| B | ZESTLAND REALTY LLC NYC DOB building permits | 11 | Mechanical Systems · FILING FOR THE MECHANICAL HOOD, DUCTS, AND EXHAUST FAN FOR THE FIRST FLOOR COMMERCIAL SPACE AS PER PLAN. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. No product keyword matched | 1 | Oct 13, 2026 |
| B | LEEMA PLBNG & HEATING INC NYC DOB building permits | 11 | Plumbing · PLUMBING WORK CONSISTING OF REPLACEMENT OF EXISTING HOT WATER HEATERS, DOMESTIC BOOSTER PUMPS, A SEWAGE EJECTOR PUMP, THE EXISTING NATURAL GAS SYSTEM AND EXISTING PLUMBING FIXTURES AS PER PLANS FILED HEREWITH. NO CHANGE IN USE EGRESS OR OCCUPANCY. No product keyword matched | 1 | Oct 13, 2026 |
| B | WALDMAN PARTNERS NYC DOB building permits | 11 | Mechanical Systems · Install rooftop HVAC, make up air unit, kitchen exhaust system and duct work for SONIC. No change in use, egress or occupancy. No product keyword matched | 3 | Oct 13, 2026 |
| B | SOUTH HOMES INC. NYC DOB building permits | 11 | Earth Work · PROPOSED NEW 3-STORY, 3 FAMILY MASONRY BUILDING. No product keyword matched | 1 | Oct 13, 2026 |
| B | TRI-STAR EQUITIES NYC DOB building permits | 11 | Suspended Scaffold · Installation of suspended scaffold for facade work or inspection No product keyword matched | 11 | Oct 13, 2026 |
| B | SHANE WALTERS NYC DOB building permits | 11 | General Construction · Application is filed for interior renovation at cellar, 1st and 2nd floor to remove non-load bearing partition walls, repair & replace windows, ceilings, gypsum panels, floor finish as per plan.Interior finishes was damaged due to fire extinction. No product keyword matched | 2 | Oct 13, 2026 |
| B | GR BUILDERS NYC DOB building permits | 11 | Plumbing · PLUMBING WORK AND INSTALLATION OF 26 SPRINKLER HEADS IN CONJUNCTION WITH APP# Q01366144-I1. No product keyword matched | 2 | Oct 13, 2026 |
| B | NUVEEN REAL ESTATE NYC DOB building permits | 11 | General Construction · INTERIOR RENOVATION WORK RELATED TO RESTROOM RENOVATION IN EXISTING OFFICE SPACE AT 8TH FLOOR (DEMO OF EXISTING AND CONSTRUCTION OF NEW PARTITIONS ,FINISHES, FIXTURES AND RELATED CONSTRUCTION). NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION No product keyword matched | 2 | Oct 13, 2026 |
| B | ESSEN HEALTHCARE NYC DOB building permits | 11 | Sprinklers · REMOVE EXISTING 3 WATER SERVICE AND CAP IT IN THE STREET AND PROVIDE& INSTALL NEW 6 COMBINED WATER SERVICE. PROVIDE AND INSTALL NEW WET FIRE SPRINKLER SYSTEM TO EXISTING RENOVATED OFFICES BUILDING AS SHOWN ON SUBMITTED PLANS. No product keyword matched | 4 | Oct 13, 2026 |