Home
Workspace
Klise
Target
Seer
Signals
Competitors
Contacts
Log in
Seer/Prospects/ALL POWER ELECL INSTLRS
Back to prospects

ALL POWER ELECL INSTLRS

Manhattan, Bronx, NY · Outside service region

AnalysisCompany profileContactsEmail draftSources

Analysis

Overall 11 / 20Tier B
Keyword
Seer chat
0 / 5
No keyword-matching signal in the last 90 days.
Freshness5 / 5Latest signal is within 30 days.
Place5 / 5NY matches the seller’s region.
Target fit1 / 5No target company types set; baseline is 1 star.

Company profile

Company
ALL POWER ELECL INSTLRS
Source for Company (opens in new tab)
Signal source
NYC DOB electrical permits
Signal date
Oct 14, 2026
Source for Signal date (opens in new tab)
Signal count
4 saved signals, 2 in the last 90 days
Signal summary
4th floor: Install lighting fixtures, exit signs, switches, receptacles, floor box and associated branch-circuit wiring/home runs from existing panelboards..
Source for Signal summary (opens in new tab)
Address
34-18 NORTHERN BLVD, LONG ISLAND CITY, NY 11101
Source for Address (opens in new tab)
Phone
Not found
Email
Not found
Website
Not found
Decision maker
Not found
DM title
Not found

Contacts

No contact found

Phone: not found · See the source record

Log in to search contacts

Email draft

Add a contact before generating a draft.

Sources

4 signals
  • Oct 14, 2026
    Permit
    4th floor: Install lighting fixtures, exit signs, switches, receptacles, floor box and associated branch-circuit wiring/home runs from existing panelboards..
    No product keyword matched · NYC DOB electrical permits
    Source record (opens in new tab)
  • Oct 14, 2026
    Permit
    Install lighting fixtures, exit signs, switch controls, receptacles, data raceway stub-ups. Install branch-circuit wiring and home runs from existing panelboards. No new panels, service work or motors.
    No product keyword matched · NYC DOB electrical permits
    Source record (opens in new tab)
  • Jul 10, 2026
    Permit
    General wiringInstall recessed, track and ceiling lighting fixtures. Install new receptacles and modify existing receptacles. Install lighting control system. No change to building service.
    No product keyword matched · NYC DOB electrical permits
    Source record (opens in new tab)
  • May 23, 2026
    Permit
    Subsequent filing submitted to address DOB violation requiring service bonding compliance and MIGB installation associated with previously replaced service switch. Scope limited to installation of required bonding and service disconnect compliance per NYC Electrical Code 250.92. No alteration to utility service conductors
    No product keyword matched · NYC DOB electrical permits
    Source record (opens in new tab)