Home
Workspace
Klise
Target
Seer
Signals
Competitors
Contacts
Log in
Seer/Prospects/METHOD GENERAL CONTRACTOR
Back to prospects

METHOD GENERAL CONTRACTOR

Manhattan, MANHATTAN, NY · Outside service region

AnalysisCompany profileContactsEmail draftSources

Analysis

Overall 11 / 20Tier B
Keyword
Seer chat
0 / 5
No keyword-matching signal in the last 90 days.
Freshness5 / 5Latest signal is within 30 days.
Place5 / 5NY matches the seller’s region.
Target fit1 / 5No target company types set; baseline is 1 star.

Company profile

Company
METHOD GENERAL CONTRACTOR
Source for Company (opens in new tab)
Signal source
NYC DOB building permits
Signal date
Oct 13, 2026
Source for Signal date (opens in new tab)
Signal count
14 saved signals, 3 in the last 90 days
Signal summary
General Construction · INTERIOR RENOVATION OF APARTMENT 13 ON THE 4TH FLOOR, AS PER PLANS FILED HEREWITH
Source for Signal summary (opens in new tab)
Address
478 ALBANY AVENUE SUITE 144
Source for Address (opens in new tab)
Phone
Not found
Email
Not found
Website
Not found
Decision maker
Not found
DM title
Not found

Contacts

No contact found

Phone: not found · See the source record

Log in to search contacts

Email draft

Add a contact before generating a draft.

Sources

14 signals
  • Oct 13, 2026
    Permit
    General Construction · INTERIOR RENOVATION OF APARTMENT 13 ON THE 4TH FLOOR, AS PER PLANS FILED HEREWITH
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)
  • Sep 25, 2026
    Permit
    General Construction · INTERIOR RENOVATION AT APTS 2W AND 6W ON THE 2ND AND 6TH FLOORS, AS PER PLANS FILED HEREWITH
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)
  • Sep 24, 2026
    Permit
    Mechanical Systems · Filing herewith mechanical work for the building at the address listed. Includes VRF systems. Natural ventilation provided, refer to GC application drawings (Architectural).
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)
  • Jun 12, 2026
    Permit
    Mechanical Systems · MECHANICAL WORK AT FACADE AND APTS 3, 4, 7, 8, AND 17 AS PER PLANS FILED HEREWITH
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)
  • Apr 21, 2026
    Permit
    General Construction · INSTALLATION OF SECURITY CAMERAS AND WINDOWS AT GROUND FLOOR, PROPOSED NEW ROOF DECK, AS PER PLANS FILED HEREWITH.
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)
  • Mar 11, 2026
    Permit
    Mechanical Systems · MECHANICAL WORK AT ROOF, INNER COURTYARD FACADE, AND APARTMENTS 5, 11, 13, 14, 18, 23, 26 AS PER PLANS FILED HEREWITH
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)
  • Mar 10, 2026
    Permit
    General Construction · General construction work for battery containment enclosures. No change to use, occupancy or exits under this application.
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)
  • Mar 9, 2026
    Permit
    General Construction · INTERIOR RENOVATION AT APARTMENTS 3, 4, 7, 8, 10, 16, 17, 19 AS PER PLANS FILED HEREWITH
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)
  • Mar 5, 2026
    Permit
    Mechanical Systems · Installation of HVAC mini splits per plans.
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)
  • Mar 3, 2026
    Permit
    Mechanical Systems · Proposed air conditioning system and ducwork
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)
  • Mar 3, 2026
    Permit
    General Construction · renovation of existing residence unit 4A, located on the 4th and 5th floors of a multiple dwelling building. architecture work type. There is to be no change of use or occupancy
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)
  • Mar 2, 2026
    Permit
    General Construction · INTERIOR RENOVATION AT 1ST-6TH FLOORS, APARTMENTS 10, 11, 12, 16, 17, 20, 23 AS PER PLANS FILED HEREWITH
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)
  • Jan 20, 2026
    Permit
    General Construction · NEW ACCESSORY ROOF DECK AS PER PLANS FILED HEREWITH
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)
  • Nov 12, 2025
    Permit
    General Construction · General construction work for battery containment enclosures. No change to use, occupancy or exits under this application.
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)