Home
Workspace
Klise
Target
Seer
Signals
Competitors
Contacts
Log in
Seer/Prospects/TRI-STAR EQUITIES
Back to prospects

TRI-STAR EQUITIES

Manhattan, MANHATTAN, NY · Outside service region

AnalysisCompany profileContactsEmail draftSources

Analysis

Overall 11 / 20Tier B
Keyword
Seer chat
0 / 5
No keyword-matching signal in the last 90 days.
Freshness5 / 5Latest signal is within 30 days.
Place5 / 5NY matches the seller’s region.
Target fit1 / 5No target company types set; baseline is 1 star.

Company profile

Company
TRI-STAR EQUITIES
Source for Company (opens in new tab)
Signal source
NYC DOB building permits
Signal date
Oct 13, 2026
Source for Signal date (opens in new tab)
Signal count
30 saved signals, 11 in the last 90 days
Signal summary
Suspended Scaffold · Installation of suspended scaffold for facade work or inspection
Source for Signal summary (opens in new tab)
Address
2 LOMBARDY STREET
Source for Address (opens in new tab)
Phone
Not found
Email
Not found
Website
Not found
Decision maker
Not found
DM title
Not found

Contacts

No contact found

Phone: not found · See the source record

Log in to search contacts

Email draft

Add a contact before generating a draft.

Sources

30 signals
  • Oct 13, 2026
    Permit
    Suspended Scaffold · Installation of suspended scaffold for facade work or inspection
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)
  • Oct 9, 2026
    Permit
    Supported Scaffold · INSTALLATION OF PIPE SCAFFOLDING AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CHAPTER # 33 OF THE 2022 CODE. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)
  • Oct 5, 2026
    Permit
    Suspended Scaffold · Installation of suspended scaffold for facade work or inspection
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)
  • Oct 1, 2026
    Permit
    Structural · INFILL OF AN EXISTING ELEVATOR OPENING ON THE 8TH FLOOR FRAMING LEVEL AND ROOF ELEVATION FOR COMMERCIAL SPACE AS PER PLANS.
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)
  • Oct 1, 2026
    Permit
    General Construction · Interior renovation of existing eating and drinking establishment as per plan. No change in use, egress, or occupancy under this application
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)
  • Sep 28, 2026
    Permit
    Sidewalk Shed · Installation of a temporarily heavy-duty sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)
  • Sep 23, 2026
    Permit
    Sidewalk Shed · INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. LIVE LOAD 300PSF.
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)
  • Sep 10, 2026
    Permit
    Sidewalk Shed · INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. LIVE LOAD 300PSF.
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)
  • Aug 31, 2026
    Permit
    General Construction · FACADE REPAIRS AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)
  • Aug 19, 2026
    Permit
    Mechanical Systems · MODIFICATIONS TO EXISTING DUCTWORK/GRILLES.
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)
  • Aug 17, 2026
    Permit
    Plumbing · Plumbing modification on 8th floor as per plans. No change in use, egress or occupancy.
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)
  • Aug 6, 2026
    Permit
    General Construction · Repair existing brownstone stoop . No change to use bulk or egress
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)
  • Jul 2, 2026
    Permit
    Structural · INFILL OF AN EXISTING ELEVATOR OPENING ON THE 8TH FLOOR FRAMING LEVEL AND ROOF ELEVATION FOR COMMERCIAL SPACE AS PER PLANS.
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)
  • Jun 30, 2026
    Permit
    Sidewalk Shed · INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. LIVE LOAD 300PSF.
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)
  • Jun 29, 2026
    Permit
    Plumbing · Relocate and new plumbing fixtures on the 2nd flr. No change to use, egress or bulk.
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)
  • Jun 26, 2026
    Permit
    General Construction · Minor partition with general carpentry and plumbing work in apt 2W . No change to use, bulk or egress.
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)
  • Jun 25, 2026
    Permit
    General Construction · Interior renovation on 8th floor as per plans. Application filed in conjunction with Alt. 1 100375416.
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)
  • Jun 22, 2026
    Permit
    Sidewalk Shed · INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. LIVE LOAD 300PSF.
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)
  • May 14, 2026
    Permit
    Sign · INSTALLATION OF AN ILLUMINATED BUSINESS ACCESSORY SIGN . NO CHANGE IN USE, EGRESS OR OCCUPANCY.
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)
  • Apr 21, 2026
    Permit
    Mechanical Systems · Installation of non-emergency gas fired generator and gas booster on new steel platform on roof. Installation of conduit per plan. Installation of ATS in equipment room in cellar. Installation of camlok on facade. No change to occupancy, use, or egress.
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)