Companies with dated public signals, ranked by fit with your products.
| Tier | Company | Score | Latest signal | Signals 90d | Last signal |
|---|---|---|---|---|---|
| B | CROSSCITY CONSTRUCTION CO NYC DOB building permits | 11 | General Construction · INTERIOR RENOVATION TO EXISTING THIRD FLOOR HOUSES OF WORSHIP USE WITH NO CHANGE IN EGRESS. No product keyword matched | 3 | Oct 27, 2026 |
| B | 41W35ST LLC NYC DOB building permits |
| 11 |
Plumbing · HEREBY FILING FOR NEW FIXTURES AND PIPING FOR RENOVATION OF EXISTING BUILDING. NO CHANGE TO USE, EGRESS OR OCCUPANCY. No product keyword matched |
| 3 |
| Oct 27, 2026 |
| B | LIK KAI CONSTRUCTION INC NYC DOB building permits | 11 | Construction Fence · install 8 feet height temporary plywood fence inside property line. No change in use, occupancy or egress. No product keyword matched | 2 | Oct 27, 2026 |
| B | DYNAMIC DEVELOPMENT AND C NYC DOB building permits | 11 | Full Demolition · Full demolition of the partially built accessory to Church building, filed and built under NB #310175878. This NB application was not signed off. No product keyword matched | 6 | Oct 27, 2026 |
| B | BRIGGS SERVICES LLC NYC DOB building permits | 11 | General Construction · Architectural modifications taking place on the 7th floor as per plans filed herewith. No change in use, egress or occupancy. No product keyword matched | 3 | Oct 27, 2026 |
| B | SELF EMPLOYED NYC DOB building permits | 11 | General Construction · COMBINATION AND ALTERNATION OF 413-415 WEST 22ND STREET - CONVERSION TO SINGLE FAMILY, REAR EXTENSION AND 5TH FLOOR ADDITION No product keyword matched | 1 | Oct 27, 2026 |
| B | XUXU CONSTRUCTION INC NYC DOB building permits | 11 | General Construction · INTERIOR RENOVATION OF 2ND FLOOR OF THE HOUSE. REPAIR WALL, CELINGS AND FLOORING. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. No product keyword matched | 4 | Oct 27, 2026 |
| B | KOM MANAGEMENT NYC DOB building permits | 11 | Earth Work · New Brick/Concrete/Masonry Multifamily building with 4 floors and Cellar and 15 Dwelling Units. No product keyword matched | 1 | Oct 27, 2026 |
| B | EDGE CONSTRUCTION AND CONCRETE LLC NYC DOB building permits | 11 | Protection and Mechanical Methods · INSTALLATION AND USE OF TEMPORARY KNUCKLEBOOM AS PER PLANS FILED HEREWITH. NO CHANGES IN USE, EGRESS, OR OCCUPANCY. No product keyword matched | 9 | Oct 27, 2026 |
| B | ELITE GC NY INC NYC DOB building permits | 11 | General Construction · APPLICATION FILED FOR INTERIOR RENOVATION OF NON-LOAD BEARING PARTITIONS, CEILINGS, AND FINISHES IN THE CELLAR AND ON THE 1ST FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY No product keyword matched | 10 | Oct 27, 2026 |
| B | SATMAR MEAT MARKET INC NYC DOB building permits | 11 | General Construction · Existing 3-Story mixed use building, to be enlarged horizontally and combined to a mixed use building No product keyword matched | 3 | Oct 27, 2026 |
| B | GMEN ACQUISITON LLC NYC DOB building permits | 11 | General Construction · BUILD OUT OF SINGLE FAMILY RESIDENCE TO INCLUDE REMOVAL/INSTALLALATION OF NON LOAD BEARING PARTITIONS, FLOORING, CEILING, FIXTURES AND FINISHES. ROOF AND ELEVATOR PIT WORK AS PER PLANS FILED HEREWITH. NO CHANGE IN EGRESS, USE OR OCCUPANCY No product keyword matched | 3 | Oct 27, 2026 |
| B | LEXIAN CORP NYC DOB building permits | 11 | Plumbing · Remove (1) one existing boiler, (1) hot water heater, (2) two new boilers and (2) hot water heaters, Replace existing plumbing three-piece fixture with new three-piece fixtures. Replace existing sink with new sink. No product keyword matched | 1 | Oct 27, 2026 |
| B | Refuge NYC DOB building permits | 11 | General Construction · Temporary structures for event programming. Removed at the end of the programing. No changes to existing structures, use or egress. No product keyword matched | 5 | Oct 27, 2026 |
| B | ULTIMATE 1 CONSTR INC NYC DOB building permits | 11 | Curb Cut · PROPOSED INSTALLATION OF NEW 18'-0 WIDE CURB CUT No product keyword matched | 2 | Oct 27, 2026 |
| B | UNIVERSAL MASONRY CORP NYC DOB building permits | 11 | Curb Cut · APPLICATION FILED HEREWITH TO INSTALL NEW 10' CURB CUT. No product keyword matched | 2 | Oct 27, 2026 |
| B | AVERY GROUP LLC. NYC DOB building permits | 11 | General Construction · Interior renovation on the 2nd through 7th floor of an existing 7-story building. No change to existing building egress, footprint or facade. Change use group and occupancy group on C of O. No product keyword matched | 1 | Oct 27, 2026 |
| B | BENGAL CONSTRUCTION NY IN NYC DOB building permits | 11 | Curb Cut · install handicap wheelchair accessibility 10ft wide curb cut as per plan. No product keyword matched | 1 | Oct 27, 2026 |
| B | JP MORGAN CHASE BANK, N.A. NYC DOB building permits | 11 | General Construction · INSTALL NEW 6 INCH, 2 HR RATED, BLOCK WALL BETWEEN MER & BOILER ROOM. INSTALL 2 NEW 1.5 HR FIRE RATED SELF CLOSING DOORS. FIRE STOP ALL PENETRATIONS AT WALLS, FLOOR & CEILINGS. IN CONJUNCTION W/HVAC REPLACEMENT. NO CHANGE IN USE, OCCUPANCY OR EGRESS. No product keyword matched | 3 | Oct 27, 2026 |
| B | NONSTOP PLUMBERS CORP NYC DOB building permits | 11 | Plumbing · INTERIOR RENOVATION OF EXISTING MASTER BATHROOM AND POWEDER ROOM. REPLACEMENT OF FIXTURES No product keyword matched | 7 | Oct 27, 2026 |
| B | TITAN CONSTRUCTION SERVIC NYC DOB building permits | 11 | Supported Scaffold · Installation of temporary supported scaffold per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application. No product keyword matched | 2 | Oct 27, 2026 |
| B | PUBLIC STORAGE NYC DOB building permits | 11 | Mechanical Systems · DIRECT REPLACEMENT OF 12 ROOFTOP HVAC UNITS. NO CHANGE TO USE, OCCUPANCY, STRUCTURE, OR EGRESS No product keyword matched | 1 | Oct 27, 2026 |
| B | HONOR GROUP NYC LLC NYC DOB building permits | 11 | General Construction · REMOVE EXISTING ILLEGAL ENCLOSED STRUCTURE IN REAR YARD. MODIFY EXISTING STRUCTURE TO PROVIDE A 13'-6 X 16'-0 OPEN CANOPY IN THE REAR YARD. CANOPY TO REMAIN OPEN AND UNENCLOSED. WORK IS PROPOSED TO ADDRESS AND DISMISS ECB VIOLATION #39196660X. NO CHANGE No product keyword matched | 3 | Oct 27, 2026 |
| B | LMS REALTY LLC NYC DOB building permits | 11 | General Construction · APPLICATION FILED TO TO MAKE OPENING IN ORDER TO CONNECT WITH ADJACENT BUILDING @ 104-106 WEST 73rd ST. & REMOVE VIOLATION #25-00247 NO CHANGE OF USE, EGRESS OR OCCUPANCY Filed in conjunction with M01236449-I1 No product keyword matched | 3 | Oct 27, 2026 |
| B | KAMBER MANAGEMENT LLC NYC DOB building permits | 11 | Mechanical Systems · MECHANICAL VENTILATION WORK ASSOCIATED WITH TAQUERIA SPACE RENOVATIONS FOR MECHANICAL ROOM WATER HEATER VENTILATION AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY. No product keyword matched | 1 | Oct 27, 2026 |
| B | RUDD REALTY MGMT CORP. NYC DOB building permits | 11 | General Construction · Temporary shoring and garage repairs as per plans filed herewith. No change to use, egress, or occupancy. No product keyword matched | 3 | Oct 27, 2026 |
| B | MECHANICAL EAST CO.,INC NYC DOB building permits | 11 | Mechanical Systems · INSTALLATION OF MECHANICAL SYSTEM FOR 3RD AND 11th FLOOR. NO CHANGE IN USE, EGRESS OR OCCUPANCY. No product keyword matched | 2 | Oct 27, 2026 |
| B | OLD PS-9 OWNERS CORP. NYC DOB building permits | 11 | Plumbing · Interior renovation of existing apartment, 2A. Renovation to existing bathrooms and kitchen. No product keyword matched | 1 | Oct 27, 2026 |
| B | 535 PHASE CONSTR. INC NYC DOB building permits | 11 | Construction Fence · INSTALLATION OF TEMPORARY CONSTRUCTION PLYWOOD FENCE AS PER PLAN. NO CHANGE IN USE,OCCUPANCY, OR EGRESS UNDER THIS APPLICATION. No product keyword matched | 2 | Oct 27, 2026 |
| B | PMACS HOSPITALITY NYC DOB building permits | 11 | Structural · INSTALLATION OF NEW STRUCTURAL STEEL FOR THE MASONRY OPENING ENLARGEMENT AT THE FIRST FLOOR. ALL AS PER PLAN. NO CHANGE IN OCCUPANCY, USE, OR EGRESS. No product keyword matched | 2 | Oct 27, 2026 |
| B | 227 OCEAN PARKWAY APT. CORP. NYC DOB building permits | 11 | General Construction · Partial parapet wall replacement at north courtyard. No product keyword matched | 1 | Oct 27, 2026 |
| B | Bubbly Clean Laundromat NYC DOB building permits | 11 | Plumbing · REPLACE PLUMBING FIXTURES IN APARTMENT ON 2ND FLOOR. IN CONJUNCTION WITH RENOVATIONS FILED UNDER B01287362-I1. No product keyword matched | 3 | Oct 27, 2026 |
| B | LE CAPITAL NYC NYC DOB building permits | 11 | Plumbing · Propose plumbing work for a new 8-story building filed in conjunction with GC # B01232767-I1. No product keyword matched | 13 | Oct 27, 2026 |
| B | CROWN BUILDER & CONSTRUCT NYC DOB building permits | 11 | Construction Fence · To construct a temporary plywood construction fence. No product keyword matched | 1 | Oct 27, 2026 |
| B | HEALTH AND HOSPITALS-HARLEM NYC DOB building permits | 11 | Sidewalk Shed · INSTALLATION OF NEW SIDEWALK SHED AS INDICATED ON PLANS. THERE WILL BE NO CHANGE IN THE USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION No product keyword matched | 3 | Oct 27, 2026 |
| B | TIMELESS DEVELOPMENT LLC NYC DOB building permits | 11 | Plumbing · INSTALLATION OF PLUMBING SYSTEM FOR ENTIRE BUILDING IN CONJUCTION WITH NEW BUILDING APPLICATION B0802975. NO CHANGE IN USE, EGRESS OR OCCUPANCY. No product keyword matched | 3 | Oct 27, 2026 |
| B | TRIDENT BUILDERS GROUP NYC DOB building permits | 11 | General Construction · INTERIOR RENOVATION OF APT 5. PARTITION CHANGES TO NON-LOAD-BEARING WALLS AS PER PLANS. NO CHANGE IN USE, OCCUPANCY, OR EGRESS. No product keyword matched | 2 | Oct 27, 2026 |
| B | BOBBY J. ENTERPRISE INC NYC DOB building permits | 11 | General Construction · RENOVATION IN APT 13D FILED IN CONJUNCTION WITH DOB NOW PL. NO CHANGE TO USE, OCCUPANCY OR EGRESS. No product keyword matched | 6 | Oct 27, 2026 |
| B | CSMR DESIGNS NYC DOB building permits | 11 | Construction Fence · INSTALL CONSTRUCTION FENCE No product keyword matched | 1 | Oct 27, 2026 |
| B | BILLHARZ PLUMBING, INC NYC DOB building permits | 11 | Plumbing · REMOVE FULL KITCHEN WITH GAS STOVE AND LEGALIZE TWO PIECE BATHROOM, WASHING MACHINE HOOKUP & SINK FOR TENANT LAUNDRY PER VIO 34736376L & 34736375J. . THIS APPL. SUPERSEDES & REPLACES APPL. Q00710015 AND IS IN RES PONSE TO AUDIT DATED 1/29/2026 No product keyword matched | 1 | Oct 27, 2026 |
| B | IK DEVELOPMENT NYC DOB building permits | 11 | Construction Fence · Installing 8 Feet high construction fence No product keyword matched | 1 | Oct 27, 2026 |
| B | DAVID H KOCH THEATER AT LINCOLN CEN NYC DOB building permits | 11 | Earth Work · Filing herewith landscape scope for paving at (inside/interior- not at the right-of-way but behind the property line- lot) the South Transverse as per plans. No change in use, occupancy, or egress under this application. No product keyword matched | 3 | Oct 27, 2026 |
| B | PLANET CONSTRUCTION & DE* NYC DOB building permits | 11 | General Construction · Facade restoration. No product keyword matched | 2 | Oct 27, 2026 |
| B | SEPHARDIC LEBANESE CONG NYC DOB building permits | 11 | Plumbing · Application filed for the removal of ECB violation #39141601H to cap and remove fixtures cited in violation and return site to compliant occupancy. No product keyword matched | 1 | Oct 27, 2026 |
| B | BROADWAY 922 ENTERPRISES LLC NYC DOB building permits | 11 | Suspended Scaffold · IRA FOR THE ALPHA AND BETA SECTOR LOCATION INSPECTION No product keyword matched | 1 | Oct 27, 2026 |
| B | ZORIA HOUSING, LLC NYC DOB building permits | 11 | General Construction · Add mechanical mini split AC and replace windows to the existing two-family house. File to address work without permit violation 39177210P. NO change in use, egress, or occupancy. No product keyword matched | 3 | Oct 27, 2026 |
| B | E SOW CONSTRUCTION LLC NYC DOB building permits | 11 | General Construction · ARCHITECTURAL EXTERIOR MODIFICATIONS TO APARTMENT 16B (THRU-THE-WALL HVAC UNITS INSTALLATION) AS PER PLAN FILE HEREWITH.NO CHANGE IN EGRESS OCCUPANCY OR USE UNDER THIS APPLICATION. No product keyword matched | 3 | Oct 27, 2026 |
| B | MASTER GC MANAGEMENT CORP NYC DOB building permits | 11 | Standpipe · FILE REGULAR SD WORKTYPE IN CONJUNCTION WITH JOB# Q00988198 No product keyword matched | 1 | Oct 27, 2026 |
| B | ECOSTRUCT LLC NYC DOB building permits | 11 | General Construction · INTERIOR RENOVATION AT THE 2ND & 3RD FLOORS INCLUDING REMOVAL/INSTALLATION OF NON-LOAD BEARING PARTITIONS, NEW FLOOR & WALL FINISHES AS PER THE DRAWINGS FILED HEREIN. NO CHANGE IN USE, OCCUPANCY OR EGRESS. No product keyword matched | 2 | Oct 27, 2026 |
| B | TREDENT CONTRACTING SERVI NYC DOB building permits | 11 | Structural · APPLICATION FILED FOR A NEW DETACHED 2 FAMILY DWELLING WITH ACCESSORY ON-GRADE PARKING FOR 2 CARS. No product keyword matched | 2 | Oct 27, 2026 |