Home
Workspace
Klise
Target
Seer
Signals
Competitors
Contacts
Log in
Seer/Prospects/HONOR GROUP NYC LLC
Back to prospects

HONOR GROUP NYC LLC

Queens, NY · Outside service region

AnalysisCompany profileContactsEmail draftSources

Analysis

Overall 11 / 20Tier B
Keyword
Seer chat
0 / 5
No keyword-matching signal in the last 90 days.
Freshness5 / 5Latest signal is within 30 days.
Place5 / 5NY matches the seller’s region.
Target fit1 / 5No target company types set; baseline is 1 star.

Company profile

Company
HONOR GROUP NYC LLC
Source for Company (opens in new tab)
Signal source
NYC DOB building permits
Signal date
Oct 27, 2026
Source for Signal date (opens in new tab)
Signal count
8 saved signals, 3 in the last 90 days
Signal summary
General Construction · REMOVE EXISTING ILLEGAL ENCLOSED STRUCTURE IN REAR YARD. MODIFY EXISTING STRUCTURE TO PROVIDE A 13'-6 X 16'-0 OPEN CANOPY IN THE REAR YARD. CANOPY TO REMAIN OPEN AND UNENCLOSED. WORK IS PROPOSED TO ADDRESS AND DISMISS ECB VIOLATION #39196660X. NO CHANGE
Source for Signal summary (opens in new tab)
Address
102 CLOVER DR
Source for Address (opens in new tab)
Phone
Not found
Email
Not found
Website
Not found
Decision maker
Not found
DM title
Not found

Contacts

No contact found

Phone: not found · See the source record

Log in to search contacts

Email draft

Add a contact before generating a draft.

Sources

8 signals
  • Oct 27, 2026
    Permit
    General Construction · REMOVE EXISTING ILLEGAL ENCLOSED STRUCTURE IN REAR YARD. MODIFY EXISTING STRUCTURE TO PROVIDE A 13'-6 X 16'-0 OPEN CANOPY IN THE REAR YARD. CANOPY TO REMAIN OPEN AND UNENCLOSED. WORK IS PROPOSED TO ADDRESS AND DISMISS ECB VIOLATION #39196660X. NO CHANGE
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)
  • Oct 7, 2026
    Permit
    Structural · application filed for the removal of the exterior concrete deck and associated structure. Removal of first floor door. replace with new window in modified opening. infill wall as needed.
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)
  • Aug 18, 2026
    Permit
    General Construction · Interior renovation of existing 2 family house (co#182464'0, rel-ayout existing kitchen in 2& 3rd floor and replace partitions in the 1st fl. Install wall hung ac No change in use, occupancy or egress. to withdraw previous owner filed application#4025127
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)
  • Aug 14, 2026
    Permit
    General Construction · PROPOSE A NEW TWO STORY WITH TWO FAMILY DWELLING. OBTAIN NEW C OF O
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)
  • Jul 27, 2026
    Permit
    Structural · application filed for the removal of the exterior concrete deck and associated structure. Removal of first floor door. replace with new window in modified opening. infill wall as needed.
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)
  • Apr 30, 2026
    Permit
    Structural · NB detached accessory 1-car garage filed in conjunction with NB# Q01227683-i1 detached 2-family house.
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)
  • Apr 15, 2026
    Permit
    Construction Fence · installation of a temporary construction fence
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)
  • Feb 24, 2026
    Permit
    General Construction · Interior renovation of existing 2 family house (co#182464'0, rel-ayout existing kitchen in 2& 3rd floor and replace partitions in the 1st fl. Install wall hung ac No change in use, occupancy or egress. to withdraw previous owner filed application#4025127
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)