General Construction · INSTALL NEW 6 INCH, 2 HR RATED, BLOCK WALL BETWEEN MER & BOILER ROOM. INSTALL 2 NEW 1.5 HR FIRE RATED SELF CLOSING DOORS. FIRE STOP ALL PENETRATIONS AT WALLS, FLOOR & CEILINGS. IN CONJUNCTION W/HVAC REPLACEMENT. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
General Construction · INSTALL NEW 6 INCH, 2 HR RATED, BLOCK WALL BETWEEN MER & BOILER ROOM. INSTALL 2 NEW 1.5 HR FIRE RATED SELF CLOSING DOORS. FIRE STOP ALL PENETRATIONS AT WALLS, FLOOR & CEILINGS. IN CONJUNCTION W/HVAC REPLACEMENT. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
No product keyword matched · NYC DOB building permits
Mechanical Systems · MECHANICAL MODIFICATIONS AND ASSOCIATED DUCT WORK FOR CHASE BANK, WORK TO INCLUDE HVAC SYSTEM REPLACEMENT AS PER PLANS. NO CHANGE IN USE EGRESS OR OCCUPANCY.
No product keyword matched · NYC DOB building permits
General Construction · Remove existing parking lot perimeter wall including copings, railings & gates. Construct new 3 wythe wall w/precast copings & metal fabricated railings. Provide & install 1 double & 1 single metal gate. No change in use, egress or occupancy.
No product keyword matched · NYC DOB building permits
General Construction · REMOVAL AND INSTALLATION OF INTERIOR NON-BEARING PARTITIONS AND RELATED FINISHES AS PER DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
No product keyword matched · NYC DOB building permits