| C | NNI Construction Co Austin issued construction permits | 6 | Building Permit · CHANGE OF USE from Retail to Fitness Studio - it includes Mechanical Electrical and Plumbing.
2026 074054 DA - Pending No product keyword matched | 1 | Oct 13, 2026 |
| C | Hoch Construction LLC.(MAIN) |
| 6 |
Building Permit · Interior tenant finishout of commercial office space less than 5000 sq ft. No product keyword matched |
| 1 |
| Oct 13, 2026 |
| C | Ray Beale Austin issued construction permits | 6 | Plumbing Permit · replace 30 gallon electric water heater same like and size capacity with no changes nothing added No product keyword matched | 1 | Oct 13, 2026 |
| C | Hambone Plumbing Austin issued construction permits | 6 | Plumbing Permit · Change of use to admin/business office and small tenant improvement project renovate break room and bathroom change out lighting throughout. No product keyword matched | 1 | Oct 13, 2026 |
| C | MB Solutions Austin issued construction permits | 6 | Building Permit · Tenant finish out to convert existing mercantile space into clinic/outpatient (botox). Please reference current site plan exemption request 2026-084309 DA. No product keyword matched | 1 | Oct 13, 2026 |
| C | Community Plumbing Austin issued construction permits | 6 | Plumbing Permit · Annual Gas Test No product keyword matched | 1 | Oct 13, 2026 |
| C | FAR WEST TECHNOLOGIES,INC Seattle electrical permits | 6 | Lighting and distribution per plan in support of TI [7/24/26 BGO - Approved Plan Set] · Electrical No product keyword matched | 1 | Oct 13, 2026 |
| C | Universal Mechanical Services Seattle electrical permits | 6 | Relocating three thermostats to accommodate new floor plan. · Electrical No product keyword matched | 2 | Oct 13, 2026 |
| C | Curley Electric Inc Seattle electrical permits | 6 | Replace service panel · Electrical No product keyword matched | 1 | Oct 13, 2026 |
| C | Honeywell International Inc. Seattle electrical permits | 6 | The existing XLS1000 Fire Alarm Control Unit has been obsolete for a number of years now and replacement parts are no longer manufacturered and also no longer available to purchase.
All existing field devices are to remain as currently installed under the scope of this project. Only the control unit components that are required for a like-for-like control unit replacement. · Electrical No product keyword matched | 1 | Oct 13, 2026 |
| C | Edison Electric Inc Seattle electrical permits | 6 | New construction of a 105 unit multi-family building. [8-26-26 D Rankin - I issued a second Get Started] · Electrical No product keyword matched | 1 | Oct 13, 2026 |
| C | Phase 3 Electric LLC Seattle electrical permits | 6 | We are installing a new 400 amp service to replace the 200 amp service to the electrical shed. It will also feed a new silage mixer in the Zoo Doo Yard. We are installing spare conduits as well under the Zoo Doo Yard for future [10/13/26 BGO - Approved Service Plan] · Electrical No product keyword matched | 1 | Oct 13, 2026 |
| C | On Site Electric LLC Seattle electrical permits | 6 | 100 amp panel change & 10 Branch circuit breakers · Electrical No product keyword matched | 1 | Oct 13, 2026 |
| C | Eagle Electric of Seattle LLC Seattle electrical permits | 6 | install 5 new Cadet wall heaters · Electrical No product keyword matched | 3 | Oct 12, 2026 |
| C | Bear Utilities, LLC Austin issued construction permits | 6 | Building Permit · Demolition of existing surfaces for the installation of EV chargers and lit canopy. Grading of surfaces associated with EVSE to comply with ADA requirements. Install (1) utility transformer Install (1) switchboard assembly. Install (4) 400KW ALPITRONIC HYC400 EV chargers. Install (7) EV sign posts. Install (1) accessible EV sign posts. No product keyword matched | 1 | Oct 9, 2026 |
| C | PNW Electrical Services LLC Seattle electrical permits | 6 | Residential electrical renovation of existing approximately 1,700 SF single-family residence. Rewire existing electrical system to applicable code requirements; replace existing electrical service/panel with new 200-amp panel; install 31 customer-supplied recessed can lights; install one 60-amp, 240-volt Level 2 EV charging circuit; install two whisper-quiet exhaust fans in existing locations; and prewire/install customer-supplied under-cabinet lighting. · Electrical No product keyword matched | 2 | Oct 8, 2026 |
| C | ABC Electrical Service Austin issued construction permits | 6 | Electrical Permit · electrical service upgrade / repair 200A No product keyword matched | 1 | Oct 7, 2026 |
| C | Atwater Burger LLC dba Mend Services Austin issued construction permits | 6 | Electrical Permit · Repair electrical service from vandals that stripped the wire and service off our Billboard No product keyword matched | 2 | Oct 6, 2026 |
| C | Suntech Electric Inc. Austin issued construction permits | 6 | Electrical Permit · electrical pond improvement No product keyword matched | 3 | Oct 6, 2026 |
| C | Switch Electric Seattle electrical permits | 6 | Installing (12) EV chargers · Electrical No product keyword matched | 13 | Oct 6, 2026 |
| C | ALL SPECIALTIES ELECTRIC LLC Seattle electrical permits | 6 | installing equipment circuits · Electrical No product keyword matched | 3 | Oct 6, 2026 |
| C | Enterprise Electrical Austin issued construction permits | 6 | Electrical Permit · One story tenant build out within an existing shell building No product keyword matched | 4 | Oct 1, 2026 |
| C | Energy Electric Services LLC Austin issued construction permits | 6 | Electrical Permit · Upgraded Existing Electrical service included Main Breaker boxes Meter Risers and wiring - unit 101 (350A) unit 102 (200A) No product keyword matched | 1 | Sep 29, 2026 |
| C | C & S Enterprises Austin issued construction permits | 6 | Electrical Permit · ELECTRICAL WIRING OF BF1 NEW SCOPE AS FOLLOWS:
SCOPE OF WORK:
- Provide and install (1) 600A MCB 480/277Y 3PH 4W panel CHFDP in the Cortex area
- Run conduit and with from panel 1DHA2 to provide (1) 600A 480V aluminum feed for panel CHFDP
- Provide and install (1) 600A MCB240/120V 1PH 3W panel AHET in the Cortex area
- Install (1) 150kVA 480V to 208/120Y transformer (Transformer supplied by Base Power)
- Run conduit and wire from panel CHFDP to provide (1) 400A 480V 1PH feed to the transformer
- Run conduit and wire from the transformer to provide (1) 600A 240/120V 1PH 3W feed to panel AHET
- Install (6) 110A 240V 1PH 3W feeds for XE9780L Air-cooled Server and HITL. Fed from panel AHET
- Install (10) 20A 120V outlets for Control + Bench
- Install (4) 40A 480V 3PH twist-lock outlets for forklift chargers fed from panel CHFDP No product keyword matched | 1 | Sep 29, 2026 |
| C | Legacy Seattle electrical permits | 6 | Load bank 2 standby generator for annual maintence · Electrical No product keyword matched | 1 | Sep 25, 2026 |
| C | Callahan Electric Austin issued construction permits | 6 | Electrical Permit · (2nd Generation Space): Interior Tenant build-out of a new Killer Burger restaurant in an existing building. Work includes: New non-load bearing partition walls new interior finishes throughout space modifications to electrical service devices and low voltage system modifications to HVAC system modifications to existing plumbing. (2 Apps) No product keyword matched | 1 | Sep 23, 2026 |
| C | The Power Company Seattle electrical permits | 6 | New 200A overhead electrical service. The old (smaller) service was disconnected for tree work, and had too much wrong with it to reconnect · Electrical No product keyword matched | 1 | Sep 23, 2026 |
| C | TenX Electric, LLC Austin issued construction permits | 6 | Electrical Permit · Repair existing 400A 120/240V 3-phase CT-metered electrical service. Install retrofit door on existing CT enclosure and replace three existing CTs per Austin Energy Metering requirements. Existing service size to remain unchanged. Austin Energy Case #4609415119 No product keyword matched | 1 | Sep 22, 2026 |
| C | R. Kiser Electrical Services Austin issued construction permits | 6 | Electrical Permit · ETJ- Relocating 1 existing transformer No product keyword matched | 1 | Sep 18, 2026 |
| C | Dosey Pro Austin issued construction permits | 6 | Building Permit · Upgrade existing electrical service to new 600A 120/208V 3 Phase 4-Wire CT-metered service. Replace existing exterior service equipment with new 600A non-fused service disconnect gutter / wireway CT cabinet / service section and 600A CT meter socket. No product keyword matched | 1 | Sep 18, 2026 |
| C | NW ELECTRIC SERVICES INC Seattle electrical permits | 6 | 45 KVA Transformer Install,100A Panel Install,60A Safe Switch Install · Electrical No product keyword matched | 1 | Sep 17, 2026 |
| C | Mica Corporation Austin issued construction permits | 6 | Electrical Permit · Install electric service #16 for TxDOT roadway illumination No product keyword matched | 3 | Sep 16, 2026 |
| C | Lumin8 Transportation Technologies, LLC Austin issued construction permits | 6 | Electrical Permit · Remove existing 120/240 OH electrical service on existing service foundation and install new 240/480v OH electrical service. No product keyword matched | 1 | Sep 15, 2026 |
| C | Ion Customs Inc. Seattle electrical permits | 6 | Additional footage has been added to home also service upgrade to underground. N/C [10/20/2026 PGF Added ufer test fee to permit.] · Electrical No product keyword matched | 1 | Sep 14, 2026 |
| C | G1 Construction Inc. Austin issued construction permits | 6 | Mechanical Permit · Phase B of Interior renovation to existing industrial facility CU area with added new exterior equipment including wet scrubber. No product keyword matched | 2 | Sep 10, 2026 |
| C | C.F. McDonald Electric, Inc. Austin issued construction permits | 6 | Electrical Permit · Assemble Starco modular office pods in the interior of the warehouse facility
The new electrical service will be for 9402 Freight Ln. No product keyword matched | 1 | Sep 9, 2026 |
| C | Houston Electric Austin issued construction permits, Seattle electrical permits | 6 | We are add another 200A meter base and 200A panelboard for the church. · Electrical No product keyword matched | 1 | Sep 3, 2026 |
| C | Michalek Plumbing Austin issued construction permits | 6 | Plumbing Permit · 7 DAY - Addition of outdoor natural gas standby generator at existing business - OVA No product keyword matched | 1 | Sep 2, 2026 |
| C | Duhon Electric Austin issued construction permits | 6 | Electrical Permit · Upgrading overhead commercial electrical service from 400 Amp to 800 Amp No product keyword matched | 1 | Sep 2, 2026 |
| C | Re-Al Plumbing Austin issued construction permits | 6 | Plumbing Permit · Phase B of Interior renovation to existing industrial facility CU area with added new exterior equipment including wet scrubber. No product keyword matched | 2 | Sep 2, 2026 |
| C | JPI Electric of Texas LLC Austin issued construction permits | 6 | Electrical Permit · Electrical service to power sprinkler/irrigation system. No product keyword matched | 1 | Sep 1, 2026 |
| C | Bird's Eye Electric Austin issued construction permits | 6 | Electrical Permit · upgrade overhead service to 320 amp single phase. Add (1) 200 amp ATS refeed existing 200 amp panel and add (1) 150 amp MCB panel for future equipment No product keyword matched | 1 | Aug 28, 2026 |
| C | True LED USA, LLC Austin issued construction permits | 6 | Electrical Permit · Phase A of Interior renovation to existing industrial facility for photo metal & etch chemical storage and IMP areas with added new exterior equipment including wet scrubber and emergency generator. No product keyword matched | 2 | Aug 27, 2026 |
| C | Jackson Electric Inc Austin issued construction permits | 6 | Electrical Permit · Rebuild/upgrade OH electrical service to 225A 3-phase; new meter socket and grounding No product keyword matched | 1 | Aug 25, 2026 |
| C | VECA Electric Comapny Seattle electrical permits | 6 | The electrical project scope includes providing feeders in fiberglass conduits. The conduits will be routed underneath a pier from existing electrical switchgear to a new shore power connection (sawtooth). All details of the electrical equipment, including overcurrent protection, are proprietary and not included in this drawing set.15kV feeders and 600V and below communications cabling are being routed between the existing switchgear and sawtooth. Pull boxes have been designed to facilitate · Electrical No product keyword matched | 1 | Aug 25, 2026 |
| C | Popkoff Electrical Contracting, LLC. Austin issued construction permits | 6 | Electrical Permit · Electrical Service for Wireless Communications equipment. No product keyword matched | 1 | Aug 24, 2026 |
| C | JHC Ventures LLC Austin issued construction permits | 5 | Building Permit · ATT is proposing to install on tower: (1) Mount modification per plans attached (3) Rosenberger antennas (3) Ericsson antennas (3) Ericsson radios. Ground scope of work: (4) DC rectifiers (5) DC converters (1) Battery rack (8) 190AH batteries (6) DC breakers. No change of tower height nor ground disturbance. No product keyword matched | 1 | Oct 12, 2026 |
| C | ACC & Design Austin issued construction permits | 5 | Building Permit · Change of use and interior remodeling for 2550 SF restaurant. No product keyword matched | 2 | Oct 12, 2026 |
| C | The Plumber Austin issued construction permits | 5 | Plumbing Permit · Change of Use from Office/Warehouse to Personal Improvement Services; no remodel no construction planned. No product keyword matched | 1 | Oct 12, 2026 |
| C | MAGPIE ELECTRICAL SERVICES, LLC Austin issued construction permits | 5 | Electrical Permit · This permit is for previously installed meter and house panel HP1 which was assigned a separate address The ESPA was approved with other permit for the same service. permit # 2026-097399 EP No product keyword matched | 3 | Oct 12, 2026 |