Home
Workspace
Klise
Target
Seer
Signals
Competitors
Contacts
Log in
Seer/Prospects/Enterprise Electrical
Back to prospects

Enterprise Electrical

AUSTIN, TX · Outside service region

AnalysisCompany profileContactsEmail draftSources

Analysis

Overall 6 / 20Tier C
Keyword
Seer chat
1 / 5
0 keyword-matching signals in the last 90 days.
Freshness4 / 5Latest signal is within 90 days.
Place0 / 5TX is outside the seller’s region and target regions.
Target fit1 / 5No target company types set; baseline is 1 star.

Company profile

Company
Enterprise Electrical
Source for Company (opens in new tab)
Signal source
Austin issued construction permits
Signal date
Oct 1, 2026
Source for Signal date (opens in new tab)
Signal count
16 saved signals, 3 in the last 90 days
Signal summary
Electrical Permit · One story tenant build out within an existing shell building
Source for Signal summary (opens in new tab)
Address
5514 Clara, Houston, 77041-____
Source for Address (opens in new tab)
Phone
8328347301
Source for Phone (opens in new tab)
Email
Not found
Website
Not found
Decision maker
Not found
DM title
Not found

Contacts

No contact found

Phone: not found · See the source record

Log in to search contacts

Email draft

Add a contact before generating a draft.

Sources

16 signals
  • Oct 1, 2026
    Permit
    Electrical Permit · One story tenant build out within an existing shell building
    No product keyword matched · Austin issued construction permits
    Source record (opens in new tab)
  • Sep 29, 2026
    Permit
    Electrical Permit · Installation of EV Dual Charging Station pedestal mounted at building #6. Existing multifamily building. 2026-082927 DA.
    No product keyword matched · Austin issued construction permits
    Source record (opens in new tab)
  • Aug 18, 2026
    Permit
    Electrical Permit · Install temporary electrical service/loop for construction site power including temporary power for jobsite construction trailer and temporary site receptacles/equipment. ref: 2026-104278 BP
    No product keyword matched · Austin issued construction permits
    Source record (opens in new tab)
  • Aug 14, 2026
    Permit
    Electrical Permit · 62435 SF ground up new light manufacturer. Project will be structural steel tilt wall construction with associated site work and interior finish out.
    No product keyword matched · Austin issued construction permits
    Source record (opens in new tab)
  • Jul 2, 2026
    Permit
    Electrical Permit · Interior Finish-Out to create Office and restroom spaces including the installation of a demising wall -1630 sq ft remodel area. approved for 1 meter at 8522 CONNOR LN UNIT 120 per R.Ruiz
    No product keyword matched · Austin issued construction permits
    Source record (opens in new tab)
  • May 8, 2026
    Permit
    Electrical Permit · Interior Remodel to Existing Office/Warehouse. Work to include subdividing Existing Interior into Multiple Suites and New Overhead Doors at Warehouse (29365 SF) FYI- SDE is not correct size but an exception will be allowed. Must install a retro double door as todays standards show. See attached below. Per C. Purcell/R. Ruiz
    No product keyword matched · Austin issued construction permits
    Source record (opens in new tab)
  • Apr 22, 2026
    Permit
    Electrical Permit · Enterprise Electrical will be responsible for the demolition and replacement of eleven (11) installed electrical outlet models (referred to as towers). These existing tower models will be upgraded and replaced with a similar higher energy efficient design that has been requested and approved by American Airlines. These receptacles are placed in high traffic and high use areas with the intention to be used frequently. After time the receptacles break down due to the constant use of plugs entering or exiting the outlet which leads to electrical arcing inside the box. Once arcing begins the breaker in the panel is tripping which requires a manual reset by a knowledgeable resource. Its recommended due to the seriousness of the potential harm- that all tower outlets are replaced simultaneously. Due to being in high use locations its imperative these towers are upgraded before further safety concerns arise that result in injury and shock. Additionally there is a twelfth location that already has established power that Enterprise Electrical will be relocating several feet and upgrading to the same aforementioned higher energy efficient tower model. Enterprise Electrical anticipates that this job will take two nights due to removal installation labeling and testing of power.
    No product keyword matched · Austin issued construction permits
    Source record (opens in new tab)
  • Mar 5, 2026
    Permit
    Electrical Permit · o Enterprise Electrical will furnish and install new specified light fixtures. Per Sheet E2.01 and E0.03 Luminaire Schedule o Enterprise Electrical will install and program all lighting controls as specified. Per Sheet E2.01 Lighting Control System Notes and Sequence of Operation. o Enterprise Electrical will furnish and install new controlled duplex and GFCI receptacles as listed. Per Sheet E1-01 o Enterprise Electrical will install new branch circuitry and home runs for power lighting and all equipment. Per Sheet E1-01 o Enterprise Electrical will furnish and install new floor boxes with Data pathway. Per Sheet E1-01 o Enterprise Electrical will furnish and install data boxes and conduits. Per Sheet E1-0 Drawing Notes 5 o Enterprise Electrical will scan and concrete cutting for poke through floor box. Per Sheet E1-01 o Enterprise Electrical will furnish and install 4 new furniture system wall feeds with connection and termination. Per Sheet E1-01 Drawing Notes 2 o Enterprise Electrical will furnish and install rough in boxes and conduit for Security Door/Card Readers. Per Sheet E1-01 Drawing Notes 3 o Enterprise Electrical will furnish and install disconnect of the below mechanical equipment. WH-A TP-A DOAS-1 CU-1-2 FCU1-10 FCU1-11 FCU1-12 FCU1-13 FCU1-14 FCU1-15 FCU1-16 FCU1-17 FCU1-18 FCU1-19 BS-1 BS-2 CU-1-20 FCU-1-20 CU-1-21 FCU-1-21 Per Sheet E03-01 Mechanical/Plumbing Equipment Connection Schedule o Enterprise Electrical will furnish and install the below listed distribution equipment. Panel H1T Panel LCLA 75 KVA Transformer Per Sheet E4.00 Electrical Riser Diagram o Enterprise Electrical will furnish and install the fire alarm conduits and back boxes. To be determined once fire alarm drawings are furnished.
    No product keyword matched · Austin issued construction permits
    Source record (opens in new tab)
  • Feb 23, 2026
    Permit
    Electrical Permit · THE GENERAL SCOPE OF THE PROJECT INCLUDES A ~17500 SF FIRST GENERATION BUILDOUT OF THE 20230 SF 12TH AND 14TH FLOOR SPACE OF AN EXISTING 57 FLOOR BUILDING. THIS INCLUDES BUT IS NOT LIMITED TO NEW WALLS DOOR CEILINGS CASEWORK LIGHTING AND MEP SYSTEMS.
    No product keyword matched · Austin issued construction permits
    Source record (opens in new tab)
  • Feb 23, 2026
    Permit
    Electrical Permit · 1ST GENERATION INTERIOR BUILD-OUT ON THE 1ST FLOOR OF AN EXISTING HIGH-RISE BUILDING. EXTERIOR WORK IS LIMITED TO INSTALLATION OF NEW SIGNAGE AND AFTER HOURS DEPOSIT BOX.
    No product keyword matched · Austin issued construction permits
    Source record (opens in new tab)
  • Feb 4, 2026
    Permit
    Electrical Permit · THE GENERAL SCOPE OF THE PROJECT INCLUDES A ~17500 SF FIRST GENERATION BUILDOUT OF THE 20230 SF 12TH AND 14TH FLOOR SPACE OF AN EXISTING 57 FLOOR BUILDING. THIS INCLUDES BUT IS NOT LIMITED TO NEW WALLS DOOR CEILINGS CASEWORK LIGHTING AND MEP SYSTEMS.
    No product keyword matched · Austin issued construction permits
    Source record (opens in new tab)
  • Jan 20, 2026
    Permit
    Electrical Permit · Installation of EV Charging Station at building #2 and Maintenance Shop
    No product keyword matched · Austin issued construction permits
    Source record (opens in new tab)
  • Jan 6, 2026
    Permit
    Electrical Permit · Remodel to existing office/warehouse. HPS and Hazmat inventory included for reference permits will be applied for after BP is issued No Access Control Proposed. No plumbing scope.
    No product keyword matched · Austin issued construction permits
    Source record (opens in new tab)
  • Dec 4, 2025
    Permit
    Electrical Permit · Installation of EV Charging Station
    No product keyword matched · Austin issued construction permits
    Source record (opens in new tab)
  • Dec 1, 2025
    Permit
    Electrical Permit · ePlan: Commercial Expedited Review - Interior Remodel to Existing Office/Warehouse. Work to include subdividing Existing Interior into Multiple Suites and New Overhead Doors at Warehouse (29365 SF)
    No product keyword matched · Austin issued construction permits
    Source record (opens in new tab)
  • Dec 1, 2025
    Permit
    Electrical Permit · ePlan: Commercial Expedited Review - Interior Remodel to Existing Office/Warehouse. Work to include subdividing Existing Interior into Multiple Suites and New Overhead Doors at Warehouse (29365 SF) FYI- SDE is not correct size but an exception will be allowed. Must install a retro double door as todays standards show. See attached below. Per C. Purcell/R. Ruiz
    No product keyword matched · Austin issued construction permits
    Source record (opens in new tab)