Electrical Permit · Install temporary electrical service/loop for construction site power including temporary power for jobsite construction trailer and temporary site receptacles/equipment.
ref: 2026-104278 BP
No product keyword matched · Austin issued construction permits
Electrical Permit · 62435 SF ground up new light manufacturer. Project will be structural steel tilt wall construction with associated site work and interior finish out.
No product keyword matched · Austin issued construction permits
Electrical Permit · Interior Finish-Out to create Office and restroom spaces including the installation of a demising wall -1630 sq ft remodel area.
approved for 1 meter at 8522 CONNOR LN UNIT 120 per R.Ruiz
No product keyword matched · Austin issued construction permits
Electrical Permit · Interior Remodel to Existing Office/Warehouse. Work to include subdividing Existing Interior into Multiple Suites and New Overhead Doors at Warehouse (29365 SF) FYI- SDE is not correct size but an exception will be allowed. Must install a retro double door as todays standards show. See attached below. Per C. Purcell/R. Ruiz
No product keyword matched · Austin issued construction permits
Electrical Permit · Enterprise Electrical will be responsible for the demolition and replacement of eleven (11) installed electrical outlet models (referred to as towers). These existing tower models will be upgraded and replaced with a similar higher energy efficient design that has been requested and approved by American Airlines.
These receptacles are placed in high traffic and high use areas with the intention to be used frequently. After time the receptacles break down due to the constant use of plugs entering or exiting the outlet which leads to electrical arcing inside the box. Once arcing begins the breaker in the panel is tripping which requires a manual reset by a knowledgeable resource. Its recommended due to the seriousness of the potential harm- that all tower outlets are replaced simultaneously. Due to being in high use locations its imperative these towers are upgraded before further safety concerns arise that result in injury and shock.
Additionally there is a twelfth location that already has established power that Enterprise Electrical will be relocating several feet and upgrading to the same aforementioned higher energy efficient tower model.
Enterprise Electrical anticipates that this job will take two nights due to removal installation labeling and testing of power.
No product keyword matched · Austin issued construction permits
Electrical Permit · o Enterprise Electrical will furnish and install new specified light fixtures.
Per Sheet E2.01 and E0.03 Luminaire Schedule
o Enterprise Electrical will install and program all lighting controls as specified.
Per Sheet E2.01 Lighting Control System Notes and Sequence of Operation.
o Enterprise Electrical will furnish and install new controlled duplex and GFCI receptacles as listed.
Per Sheet E1-01
o Enterprise Electrical will install new branch circuitry and home runs for power lighting and all equipment.
Per Sheet E1-01
o Enterprise Electrical will furnish and install new floor boxes with Data pathway.
Per Sheet E1-01
o Enterprise Electrical will furnish and install data boxes and conduits.
Per Sheet E1-0 Drawing Notes 5
o Enterprise Electrical will scan and concrete cutting for poke through floor box.
Per Sheet E1-01
o Enterprise Electrical will furnish and install 4 new furniture system wall feeds with connection and termination.
Per Sheet E1-01 Drawing Notes 2
o Enterprise Electrical will furnish and install rough in boxes and conduit for Security Door/Card Readers.
Per Sheet E1-01 Drawing Notes 3
o Enterprise Electrical will furnish and install disconnect of the below mechanical equipment.
WH-A
TP-A
DOAS-1
CU-1-2
FCU1-10
FCU1-11
FCU1-12
FCU1-13
FCU1-14
FCU1-15
FCU1-16
FCU1-17
FCU1-18
FCU1-19
BS-1
BS-2
CU-1-20
FCU-1-20
CU-1-21
FCU-1-21
Per Sheet E03-01 Mechanical/Plumbing Equipment Connection Schedule
o Enterprise Electrical will furnish and install the below listed distribution equipment.
Panel H1T
Panel LCLA
75 KVA Transformer
Per Sheet E4.00 Electrical Riser Diagram
o Enterprise Electrical will furnish and install the fire alarm conduits and back boxes.
To be determined once fire alarm drawings are furnished.
No product keyword matched · Austin issued construction permits
Electrical Permit · THE GENERAL SCOPE OF THE PROJECT INCLUDES A ~17500 SF FIRST GENERATION BUILDOUT OF THE 20230 SF 12TH AND 14TH FLOOR SPACE OF AN EXISTING 57 FLOOR BUILDING. THIS INCLUDES BUT IS NOT LIMITED TO NEW WALLS DOOR CEILINGS CASEWORK LIGHTING AND MEP SYSTEMS.
No product keyword matched · Austin issued construction permits
Electrical Permit · 1ST GENERATION INTERIOR BUILD-OUT ON THE 1ST FLOOR OF AN EXISTING HIGH-RISE BUILDING. EXTERIOR WORK IS LIMITED TO INSTALLATION OF NEW SIGNAGE AND AFTER HOURS DEPOSIT BOX.
No product keyword matched · Austin issued construction permits
Electrical Permit · THE GENERAL SCOPE OF THE PROJECT INCLUDES A ~17500 SF FIRST GENERATION BUILDOUT OF THE 20230 SF 12TH AND 14TH FLOOR SPACE OF AN EXISTING 57 FLOOR BUILDING. THIS INCLUDES BUT IS NOT LIMITED TO NEW WALLS DOOR CEILINGS CASEWORK LIGHTING AND MEP SYSTEMS.
No product keyword matched · Austin issued construction permits
Electrical Permit · Remodel to existing office/warehouse. HPS and Hazmat inventory included for reference permits will be applied for after BP is issued No Access Control Proposed. No plumbing scope.
No product keyword matched · Austin issued construction permits
Electrical Permit · ePlan: Commercial Expedited Review - Interior Remodel to Existing Office/Warehouse. Work to include subdividing Existing Interior into Multiple Suites and New Overhead Doors at Warehouse (29365 SF)
No product keyword matched · Austin issued construction permits
Electrical Permit · ePlan: Commercial Expedited Review - Interior Remodel to Existing Office/Warehouse. Work to include subdividing Existing Interior into Multiple Suites and New Overhead Doors at Warehouse (29365 SF)
FYI- SDE is not correct size but an exception will be allowed. Must install a retro double door as todays standards show. See attached below. Per C. Purcell/R. Ruiz
No product keyword matched · Austin issued construction permits