Companies with dated public signals, ranked by fit with your products.
| Tier | Company | Score | Latest signal | Signals 90d | Last signal |
|---|---|---|---|---|---|
| B | ECKSTROM NYC LLC NYC DOB building permits | 11 | General Construction · Proposed horizontal enlargement of an existing 4-story building with cellar. Interior renovation at Basement, Cellar, OSP, Roof, 1st thru 3rd Floor. No product keyword matched | 14 | Nov 4, 2026 |
| B | CONSULTING REMODELING, INC |
| 11 |
Support of Excavation · Filed herewith Support of Excavation filed in conjunction with NB#X00890608-I1 No product keyword matched |
| 5 |
| Nov 4, 2026 |
| B | GFI DEVELOPMENT CO. NYC DOB building permits | 11 | General Construction · Remove and install non load bearing partitions, ceilings and finishes related to Gym renovation at SubCellar #2. No change in occupancy, use or egress. No product keyword matched | 2 | Nov 4, 2026 |
| B | EBMG LLC NYC DOB building permits | 11 | Structural · 9th Cycle FISP Repair. No change to Use, Occupancy or Egress. No product keyword matched | 24 | Nov 4, 2026 |
| B | GPG MANAGEMENT NYC DOB building permits | 11 | General Construction · Exterior Facade repair work that includes grinding and pointing of brick masonry, lintel repairs, sill repairs and cleaning of facade. Repair work as per plans filed. There is no change in use, egress or occupancy under this application. No product keyword matched | 17 | Nov 4, 2026 |
| B | HOULIHAN-PARNES PROPERTIES NYC DOB building permits | 11 | General Construction · GENERAL INTERIOR RENOVATION AT PARTIAL 5TH FLOOR APT #5 AS PER PLANS FILED HEREWITH. No product keyword matched | 2 | Nov 4, 2026 |
| B | ATLAS CONSTRUCTION USA CO NYC DOB building permits | 11 | General Construction · Replace the cornice with brick at the parapet level and installation new stucco at facade No product keyword matched | 1 | Nov 4, 2026 |
| B | METRO BUILDERS GROUP LLC NYC DOB building permits | 11 | Construction Fence · ALTERATION TYPE 3 - CONSTRUCTION EQUIPMENT - FENCE INSTALLATION OF PLYWOOD FENCE AS PER PLAN. NO CHANGE IN USE,OCCUPANCY, OR EGRESS UNDER THIS APPLICATION. No product keyword matched | 7 | Nov 4, 2026 |
| B | CON EDISON NYC DOB building permits | 11 | Sidewalk Shed · INSTALLATION OF TEMPORARY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. No product keyword matched | 5 | Nov 4, 2026 |
| B | DYNAMIX SCAFFOLD GROUP LL NYC DOB building permits | 11 | Construction Fence · Installation of temporary construction fence per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application. No product keyword matched | 51 | Nov 4, 2026 |
| B | ALMA REALTY CORP NYC DOB building permits | 11 | Plumbing · New washers and dryers as per plans No product keyword matched | 12 | Nov 4, 2026 |
| B | L3 CAPITAL LLC NYC DOB building permits | 11 | Mechanical Systems · MODIFY EXISTING HVAC DISTRIBUTION SYSTEM WITH DUCT AND INDOOR UNIT No product keyword matched | 12 | Nov 4, 2026 |
| B | HYDROKINETIC PLBG & HTG I NYC DOB building permits | 11 | Plumbing · PROPOSE PLUMBING WORKS IN CONJUNCTION WITH ARCH. DESIGN AS PER PLAN. NO CHANGE IN USE, EGRESS, AND OCCUPANCY. No product keyword matched | 9 | Nov 4, 2026 |
| B | H20 LLC NYC DOB building permits | 11 | General Construction · New 4 Story Residential Building No product keyword matched | 3 | Nov 4, 2026 |
| B | DV PLUMBING INC NYC DOB building permits | 11 | Plumbing · APPLICATION FILED FOR PLUMBING ADDITIONS/MODIFICATIONS IN THE BASEMENT, 1ST, AND 2ND FLOORS AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. No product keyword matched | 4 | Nov 4, 2026 |
| B | WEINSTEIN ENTERPRISES, INC. NYC DOB building permits | 11 | Mechanical Systems · FILING HEREWITH APPLICATION FOR MECHANICAL WORK. DIRECT REPLACEMENT OF EXISTING HVAC UNIT AT ROOF WITH NEW UNIT AT SAME LOCATION. EXISTING SUPPORTS, DUNNAGE, DUCTWORK, ACCESSORIES & CONTROLS TO REMAIN. NO CHANGE TO USE, EGRESS OR OCCUPANCY. No product keyword matched | 1 | Nov 4, 2026 |
| B | O'SULLIVAN BUILDERS & DEVELOPERS IN NYC DOB building permits | 11 | General Construction · FILE FOR INTERIOR FIT OUT OF EXISTING RETAIL SPACE 1A AT PARTIAL FIRST FLOOR AS PER PLAN FILED HEREWITH; NO CHANGE OF USE, EGRESS OR CERTIFICATE OF OCCUPANCY. No product keyword matched | 1 | Nov 4, 2026 |
| B | BUNLIN LLC NYC DOB building permits | 11 | Supported Scaffold · INSTALLATION OF PIPE SCAFFOLD @ WEST 46 STREET AS PER PLANS. PIPE SCAFFOLD SHALL COMPLY WITH CHAPTER #33 OF THE 2022 CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION. No product keyword matched | 4 | Nov 4, 2026 |
| B | KORA DEVELOPERS NYC DOB building permits | 11 | Structural · ERECT ROOF STRUCTURE FOR SIGN FILED UNDER SEPARATE APPLICATION # B01276958. NO CHANGE IN USE, EGRESS OR OCCUPANCY. No product keyword matched | 1 | Nov 4, 2026 |
| B | HOFFMAN MANAGEMENT NYC DOB building permits | 11 | General Construction · PROPOSED MINOR INTERIOR RENOVATION @ EXISTING PARTIAL 1ST FLOOR NAIL SALON WITH NEW PARTITION WORK ANDFINISH WORK AS PER PLAN. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. No product keyword matched | 11 | Nov 4, 2026 |
| B | Maimonides Health NYC DOB building permits | 11 | Protection and Mechanical Methods · filing for temporary bracing/shoring for garage repair at 4701 10 Avenue No product keyword matched | 5 | Nov 4, 2026 |
| B | GS INTERIORS LLC NYC DOB building permits | 11 | Plumbing · Plumbing work for New building filed in conjunction with GC #B01314334-I1 No product keyword matched | 14 | Nov 4, 2026 |
| B | MJM CONSTR ASSOCIATES LLC NYC DOB building permits | 11 | Foundation · FOUNDATION APPLICATION FILED IN CONJUNCTION WITH THE NEW MIXED-USE 14-STORY BUILDING FILED UNDER B00680247-I1 No product keyword matched | 9 | Nov 4, 2026 |
| B | 1411 IC-SIC PROPERTY LLC NYC DOB building permits | 11 | Mechanical Systems · Modifications to the existing HVAC System: Remove ductwork, piping and equipment back to building core on the 12th Floor as per plans (Hines - Demo, Corridor & Restroom) No change to use, egress or occupancy. No product keyword matched | 7 | Nov 4, 2026 |
| B | N TECH DESIGN OF AMERICA NYC DOB building permits | 11 | Full Demolition · This job is filed for demolition work at 46 3Ave, Brooklyn, NY 11217 No product keyword matched | 11 | Nov 4, 2026 |
| B | NOOR MECHANICAL SERVICES NYC DOB building permits | 11 | General Construction · INTERIOR RENOVATION AND REPAIR 1 ST FLOOR SLAB AS PER PLAN. NO CHANGE IN USE, MEANS OF EGRESS OR OCCUPANCY IN THIS APPLICATION. No product keyword matched | 10 | Nov 4, 2026 |
| B | OAK & STONE DEMOLITION NYC DOB building permits | 11 | Foundation · Replace existing 7' high retaining wall No product keyword matched | 3 | Nov 4, 2026 |
| B | EZFILINGNYCORP NYC DOB building permits | 11 | General Construction · HERE WITH FILING FOR THE INTERIOR ALTERATION AT BASEMENT, 1ST AND 2ND FLOORS.NO CHANGE TO USE OCCUPANCY OR EGRESS. No product keyword matched | 1 | Nov 4, 2026 |
| B | NEW LINE CONSTRUCTION LLC NYC DOB building permits | 11 | Support of Excavation · Support of excavation work in conjunction with NB application #X01198370-I1 No product keyword matched | 21 | Nov 4, 2026 |
| B | Synoptic Management NYC DOB building permits | 11 | General Construction · Construction of new accessible residential common roof deck and ramp as per plans. No change to use, egress, or occupancy. No product keyword matched | 10 | Nov 4, 2026 |
| B | OMNI BUILD INC NYC DOB building permits | 11 | Mechanical Systems · INSTALLATION OF MECHANCIAL SYSTEM FOR ENTIRE BUILDING IN CONJUNCTION WITH ALT 1 APPLICATION # M01151154. NO CHANGE IN USE, EGRESS OR OCCUPANCY. No product keyword matched | 6 | Nov 4, 2026 |
| B | COAST TO COAST PERMITS NYC DOB building permits | 11 | General Construction · Temporary Installations to be used on a temporary event Walgreens Bench. All the Installations are to be removed upon completion of the events. No product keyword matched | 4 | Nov 4, 2026 |
| B | SL Green NYC DOB building permits | 11 | Mechanical Systems · Mechanical changes as indicated on plans. No product keyword matched | 10 | Nov 4, 2026 |
| B | ROYAL HOME IMPROVEMENTS I NYC DOB building permits | 11 | General Construction · NEW EIGHT (8) STORY, FOURTY SEVEN (47) DWELLING UNIT BUILDING No product keyword matched | 2 | Nov 4, 2026 |
| B | LEFKO CAPITAL GROUP NYC DOB building permits | 11 | Sidewalk Shed · Installation of temporary sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application. No product keyword matched | 5 | Nov 4, 2026 |
| B | BLANK PROPERTY GROUP NYC DOB building permits | 11 | Sidewalk Shed · INSTALLATION OF HEAVY DUTY SIDE WALK SHED.AS PER PLAN. No product keyword matched | 12 | Nov 4, 2026 |
| B | EXPRESS BUILDERS JB INC NYC DOB building permits | 11 | Sidewalk Shed · Installation of a temporarily heavy-duty sidewalk shed and overhead protection per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application. No product keyword matched | 33 | Nov 4, 2026 |
| B | PELICAN MANAGEMENT INC. NYC DOB building permits | 11 | Sidewalk Shed · INSTALLATION OF SIDEWALK SHED IN CONJUNCTION WITH FACADE WORK AS SHOWN ON DRAWINGS. NO CHANGE IN USE EGRESS OR OCCUPANCY. WE SHALL COMPLY WITH CHAPTER 33 OF 2022 B.C No product keyword matched | 15 | Nov 4, 2026 |
| B | HOWARD WAREHOUSE INC. NYC DOB building permits | 11 | Structural · 9th Cycle FISP Repair. No Change to Use, Egress or Occupancy No product keyword matched | 3 | Nov 4, 2026 |
| B | BPP PCV OWNER LLC NYC DOB building permits | 11 | Sidewalk Shed · INSTALLATION OF SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. No product keyword matched | 37 | Nov 4, 2026 |
| B | ACER CONSTRUCTION INC NYC DOB building permits | 11 | Construction Fence · SUBMIT TEMPORARY CONSTRUCTION FENCE AT OPEN SPACE, IN CONJUNCTION WITH ALT-CO APPLICATION #:B01113016-I1. NO CHANGE IN USE, EGRESS OR OCCUPANCY. No product keyword matched | 35 | Nov 4, 2026 |
| B | FRANCHISE INTERIOR DEVELO NYC DOB building permits | 11 | General Construction · INTERIOR RENOVATION OF 3RD FLOOR OFFICE SPACE AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. No product keyword matched | 1 | Nov 4, 2026 |
| B | THE PROTESTANT EPISCOPAL CHURCH OF NYC DOB building permits | 11 | General Construction · roof areas; masonry and window restoration to rectory as per plans filed herewith. no change to use, egress or occupancy. No product keyword matched | 1 | Nov 4, 2026 |
| B | LEFRAK ORGANIZATION NYC DOB building permits | 11 | Mechanical Systems · MECHANICAL SYSTEM WORK AS PER THE PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY. No product keyword matched | 6 | Nov 4, 2026 |
| B | TABOULEHS LLC NYC DOB building permits | 11 | General Construction · Conversion of a mixed-use building to a single-family home. A new certificate of occupancy will be obtained. No product keyword matched | 1 | Nov 4, 2026 |
| B | DUAL FUEL PLUBING & HTING NYC DOB building permits | 11 | Boiler Equipment · Installation of additional boiler in conjunction with boiler replacement filed under M00848857-I1. No change to use, egress or occupancy No product keyword matched | 4 | Nov 4, 2026 |
| B | CAVAGNARO CONTRACTING LLC NYC DOB building permits | 11 | Earth Work · NEW TWO FAMILY RESIDENCE No product keyword matched | 2 | Nov 4, 2026 |
| B | SLOYER-FORMAN, INC. NYC DOB building permits | 11 | Suspended Scaffold · SUSPENDED SCAFFOLD OUTRIGGER SYSTEM FOR FACADE REPAIR AND INSPECTION No product keyword matched | 1 | Nov 4, 2026 |
| B | MACERICH NYC DOB building permits | 11 | Plumbing · INSTALLATION OF COOKING EQUIPMENT AND FIRE SUPPRESSION SYSTEM FOR FC#05 IN THE COMMERCIAL SPACE AT THE CELLAR LEVEL. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION. No product keyword matched | 12 | Nov 4, 2026 |
| B | MANHATTAN SKYLINE MANAGEMENT CORP NYC DOB building permits | 11 | Boiler Equipment · REPLACE EXISTING GAS-FIRED BOILERS AS PER PLANS. NO CHANGE TO USE, OCCUPANCY OR EGRESS. No product keyword matched | 12 | Nov 4, 2026 |