Mechanical Systems · Modifications to the existing HVAC System: Remove ductwork, piping and equipment back to building core on the 12th Floor as per plans (Hines - Demo, Corridor & Restroom) No change to use, egress or occupancy.
Mechanical Systems · Modifications to the existing HVAC System: Remove ductwork, piping and equipment back to building core on the 12th Floor as per plans (Hines - Demo, Corridor & Restroom) No change to use, egress or occupancy.
No product keyword matched · NYC DOB building permits
Sprinklers · Modifications to the existing Sprinkler System: Remove (206) existing sprinkler heads and Install (41) new sprinkler heads and associated Sprinkler Piping on the 12th Floor as per plans (Hines - Demo, Corridor & Restrooms.)
No product keyword matched · NYC DOB building permits
General Construction · Minor interior demolition. Installation of new interior partitions, doors, suspended ceilings, flooring and finishes on the 12th Floor as per plans (LL Work - Demo, Corridor & Restroom.) No change to use, egress or occupancy.
No product keyword matched · NYC DOB building permits
General Construction · Architectural work to new roof amenity building envelope, interior finish. Mechanical, Electrical and Plumbing Systems filed under separate application. Interior: Multifunction room w/ associated pre-function & lounge/ cafe space, outdoor terrace, kitchen
No product keyword matched · NYC DOB building permits
Structural · Structural Modifications: Structural Steel Reinforcing and Reinforcing Existing Roof Slab on the 40-42 and Roof Levels as per plans (ATRU Abatement Filing.) No change to use, egress or occupancy.
No product keyword matched · NYC DOB building permits
Structural · Exterior alterations to add new occupiable roof level; reinforcing existing roof slab, install new rooftop canopy structure, new slab opening for HVAC, slab infill on the 43rd Floors and Roof as per plans (Rooftop Amenity Space.)
No product keyword matched · NYC DOB building permits
Structural · Structural Modifications: Structural Steel Reinforcing and column reinforcement on 38-39th Floors as per plans (Rooftop Amenity Space.) No change to use, egress or occupancy.
No product keyword matched · NYC DOB building permits
Mechanical Systems · Modifications to the existing HVAC System on the 38-41st Floors and Roof Level as per plans (Roof Amenity Project.) No change to use, egress or occupancy.
No product keyword matched · NYC DOB building permits
Standpipe · Install (1) new 3-way roof manifold, (1) new FHR, (1) new Fire hose valve and (4) sprinkler heads on the Roof; Install (65) new sprinkler heads and associated SP/SD piping on the 41st Floor; and SP/DR piping on 40 as per plans (Rooftop Amenity Space.)
No product keyword matched · NYC DOB building permits
Standpipe · Install (1) new 3-way roof manifold, (1) new FHR, (1) new Fire hose valve and (4) sprinkler heads on the Roof; Install (65) new sprinkler heads and associated SP/SD piping on the 41st Floor; and SP/DR piping on 40 as per plans (Rooftop Amenity Space.)
No product keyword matched · NYC DOB building permits
General Construction · Architectural work to new roof amenity building envelope, interior finish. Mechanical, Electrical and Plumbing Systems filed under separate application. Interior: Multifunction room w/ associated pre-function & lounge/ cafe space, outdoor terrace, kitchen
No product keyword matched · NYC DOB building permits
Protection and Mechanical Methods · Installation and use of temporary work platform construction equipment as per plans filed herewith. THE WORK PLATFORM IN THE FIRE TOWER COURT IS ON THE 40TH FLOOR ABOVE THE MAIN ROOF.
No product keyword matched · NYC DOB building permits
Plumbing · Removal of existing plumbing fixtures and Install (2) urinals, (8) water closets, (9) lavatories, (1) HWH and associated CW/sanitary piping on the 30th Floor as per plans. (Hines - Demo, Whitebox Restrooms.) No change to use, egress or occupancy.
No product keyword matched · NYC DOB building permits
Mechanical Systems · Modifications to the existing HVAC System: Remove ductwork, piping and equipment back to building core on the 30th Floor as per plans (Hines - Full Floor Demo & Whitebox.) No change to use, egress or occupancy.
No product keyword matched · NYC DOB building permits