Home
Workspace
Klise
Target
Seer
Signals
Competitors
Contacts
Log in
Seer/Prospects/Synoptic Management
Back to prospects

Synoptic Management

Manhattan, MANHATTAN, NY · Outside service region

AnalysisCompany profileContactsEmail draftSources

Analysis

Overall 11 / 20Tier B
Keyword
Seer chat
0 / 5
No keyword-matching signal in the last 90 days.
Freshness5 / 5Latest signal is within 30 days.
Place5 / 5NY matches the seller’s region.
Target fit1 / 5No target company types set; baseline is 1 star.

Company profile

Company
Synoptic Management
Source for Company (opens in new tab)
Signal source
NYC DOB building permits
Signal date
Nov 4, 2026
Source for Signal date (opens in new tab)
Signal count
21 saved signals, 10 in the last 90 days
Signal summary
General Construction · Construction of new accessible residential common roof deck and ramp as per plans. No change to use, egress, or occupancy.
Source for Signal summary (opens in new tab)
Address
909 E 5TH STREET APT B4
Source for Address (opens in new tab)
Phone
Not found
Email
Not found
Website
Not found
Decision maker
Not found
DM title
Not found

Contacts

No contact found

Phone: not found · See the source record

Log in to search contacts

Email draft

Add a contact before generating a draft.

Sources

21 signals
  • Nov 4, 2026
    Permit
    General Construction · Construction of new accessible residential common roof deck and ramp as per plans. No change to use, egress, or occupancy.
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)
  • Nov 4, 2026
    Permit
    General Construction · Renovation of Apt. 12D on 12th floor, kitchen and bathroom work per plans. PL work will be filed subsequently.
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)
  • Oct 20, 2026
    Permit
    Plumbing · Replace water closet, lavatory, tub, kitchen sink and gas range with new, install dishwasher.
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)
  • Oct 19, 2026
    Permit
    General Construction · Renovation of Apt. 12D on 12th floor, kitchen and bathroom work per plans. PL work will be filed subsequently.
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)
  • Oct 14, 2026
    Permit
    Sidewalk Shed · Installation of temporary heavy duty sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)
  • Oct 13, 2026
    Permit
    Plumbing · GAS CONNECTION TO REPLACEMENT BURNER.
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)
  • Oct 13, 2026
    Permit
    Boiler Equipment · REPLACE BOILER AND BURNER.
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)
  • Oct 13, 2026
    Permit
    General Construction · INSTALL CHIMNEY LINER PER PLANS.
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)
  • Sep 23, 2026
    Permit
    General Construction · FACADE REPAIR WORK AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)
  • Aug 31, 2026
    Permit
    General Construction · To file ST structural work to create stair opening at the 1st floor restaurant. No change in use, egress or occupancy under this application.
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)
  • Jul 31, 2026
    Permit
    General Construction · minor alteration .removal of convenience stair and minor partitions, and ceiling patch
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)
  • Jul 31, 2026
    Permit
    General Construction · Remove glass enclosure and install new metal and glass railing at existing platform in apartment 2A on the 2nd floor. General Construction. No change in use, occupancy or egress.
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)
  • Jul 22, 2026
    Permit
    Sidewalk Shed · Installation of temporary heavy duty sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)
  • Jul 17, 2026
    Permit
    Boiler Equipment · REFILING OF APPLICATION 100084043 TO OBTAIN INSPECTION AND SIGN-OFF. REQUEST TO MOVE BOILER NUMBER 95058-01 FROM BIN 1082058 TO BIN 1082059. BUILDINGS ARE ON SAME BLOCK AND LOT BUT BOILER IS ACTUALLY LOCATED UNDER BIN 1082059. (4967 BROADWAY)
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)
  • Jun 30, 2026
    Permit
    Mechanical Systems · MECHANICAL WORK FOR RENOVATIONS OF THE 9TH FL APARTMENT AS PER PLANS FILED HEREWITH.
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)
  • Jun 12, 2026
    Permit
    General Construction · Remove glass enclosure and install new metal and glass railing at existing platform in apartment 2A on the 2nd floor. General Construction. No change in use, occupancy or egress.
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)
  • Jun 11, 2026
    Permit
    General Construction · FACADE REPAIR
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)
  • Apr 14, 2026
    Permit
    General Construction · RENOVATION OF KITCHEN AND INSTALLATION OF A NEW ELECTRIC HVAC SPLIT SYSTEM WITH DUCTWORK IN APT. 2B AND A CONDENSING UNIT INSIDE EXTERIOR WALL. NO CHANGE IN USE, EGRESS OR OCCUPANCY. PL WORK WILL BE FILED SUBSEQUENTLY.
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)
  • Mar 25, 2026
    Permit
    Structural · COMBINE UPPER LEVEL APARTMENT 2W WITH APARTMENT 3W. WORK INCLUDES SECOND FLOOR FRAMING NEW OPENING FOR SPIRAL STAIRS AND CLOSING OLD STAIRCASE OPENING. NO CHANGE IN EGRESS OR OCCUPANCY.
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)
  • Feb 25, 2026
    Permit
    General Construction · Combination of apartment 2W-3W as per Memo 3/97. Installation of pre-fab steel spiral stair and new floor opening, minor layout changes
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)