Companies with dated public signals, ranked by fit with your products.
| Tier | Company | Score | Latest signal | Signals 90d | Last signal |
|---|---|---|---|---|---|
| B | Coxon NYC DOB building permits | 9 | General Construction · Proposed Renovation of the Basement Level of an Existing 2-Family Building. No Change in Use, Egress or Occupancy is proposed under this application No product keyword matched | 0 | Jul 6, 2026 |
| B | Buffoon Group LP |
| 9 |
Plumbing · PROPOSED PLUMBING WORK FOR AN EXIST. 3-STORY 3-FAMILY BUILDING. NO CHANGE TO EXIST. USE, EGRESS OR OCCUPANCY. No product keyword matched |
| 0 |
| Jul 6, 2026 |
| B | V.S. BUILDERS LLC NYC DOB building permits | 9 | Mechanical Systems · subsequent document for mechanical system No product keyword matched | 0 | Jul 6, 2026 |
| B | KURT NYC DOB building permits | 9 | Plumbing · PLUMBING WORK AS PER PLANS FILED HEREWITH. No product keyword matched | 0 | Jul 6, 2026 |
| B | EMDAD CONSTRUCTION INC NYC DOB building permits | 9 | Structural · RENOVATION OF AN EXISTING TWO-FAMILY BUILDING. INTERIOR WORK TO INCLUDE, NEW NON LOAD-BEARING PARTITIONS, FINISHES, AND FITTINGS. EXTERIOR WORK TO INCLUDE WINDOW AND SKYLIGHT REPLACEMENT ON ROOF IN EXISTING LOCATIONS. NO CHANGE TO USE,EGRESS, OR OCCUPANCY No product keyword matched | 0 | Jul 6, 2026 |
| B | FORTUNA CONSTRUCTION LLC NYC DOB building permits | 9 | General Construction · INSTALL A NEW CHAIN LINK MESH FENCE ON VACANT LOT. NO CHANGE IN USE OCCUPANCY OR EGRESS. No product keyword matched | 0 | Jul 6, 2026 |
| B | ELYSEE MANAGEMENT LLC NYC DOB building permits | 9 | Structural · Repair and reinforce vault slab at first floor, repair and reinforce beams and columns at cellar as the plan shown. There is no change occupancy, use or egress. No product keyword matched | 0 | Jul 6, 2026 |
| B | Jastkur Management Inc NYC DOB building permits | 9 | Plumbing · PLUMBING WORK FOR UNITS #1L,1R,2L,2R FROM CELLAR TO 2ND FLOOR.NO CHANGE TO USE, EGRESS OR OCCUPANCY. No product keyword matched | 0 | Jul 6, 2026 |
| B | Y R A DEVELOPMENT CORP NYC DOB building permits | 9 | Plumbing · HEREWITH TO PROPOSE PLUMBING SYSTEM AS PERPLANS. IN CONJUNCTION WITH DOB B01392181-I1 AND TO ADDRESS ECB# 39133150H,39133149K, 39133149K, 39120514R, 32088490J, 32070372N, 32070371L No product keyword matched | 0 | Jul 6, 2026 |
| B | El Mango Rico inc NYC DOB building permits | 9 | Sign · ERECT AN ILLUMINATED SIGN ON WALL.NOT WITHIN VIEW OF ARTERIAL HIGHWAY OR PUBLIC PARK 1/2 ACRE OR MORE. NO CHANGE IN USE, EGRESS OR OCCUPANCY. No product keyword matched | 0 | Jul 6, 2026 |
| B | LC EXPEDITING SRVCS CORP NYC DOB building permits | 9 | Full Demolition · This job is filed for full demotion work at 69-23 caldwell Ave, Queens, NY 11378 No product keyword matched | 0 | Jul 6, 2026 |
| B | LINKED MECHANICAL LLC NYC DOB building permits | 9 | Mechanical Systems · INSTALLMENT OF TWO YORK CHILLERS IN SUB-CELLAR 1, SUB-CELLAR 2 AND TWO SPLIT DAIKIN UNITS ON MAIN ROOF, NO CHANGE IN EGRESS OR OCCUPANCY. No product keyword matched | 0 | Jul 6, 2026 |
| B | Martha's Bakery NYC DOB building permits | 9 | Plumbing · HEREWITH FILED FOR MINOR PLUMBING WORK IN EXISTING STORE. TO INCLUDE REPLACEMENT OF FIXTURES IN SALES AREA AND BATHROOMS ON EXT'G ROUGHING IN EXT'G LOCATIONS. No product keyword matched | 0 | Jul 6, 2026 |
| B | Tana United LLC NYC DOB building permits | 9 | Structural · INTERIOR STRUCTURAL WORK ON 3RD AND 4TH FLOORS AS INDICATED ON PLANS FILED HEREWITH FOR APARTMENT COMBINATION No product keyword matched | 0 | Jul 6, 2026 |
| B | ALBERT MAZZARISI NYC DOB building permits | 9 | Mechanical Systems · PROVIDE AND INSTALL HEATING, COOLING AND VENTILATION SYSTEM NEW ADDITINAL ROOMS IN SINGLE FAMILY HOUSE PER SUBMITTED PLANS No product keyword matched | 0 | Jul 6, 2026 |
| B | 234 HILLSIDE ACQUISITIONS LLC NYC DOB building permits | 9 | Mechanical Systems · Replace 2 old HVAC units with new ones on roof. No product keyword matched | 0 | Jul 6, 2026 |
| B | AXOS RENOVATIONS CORP NYC DOB building permits | 9 | Mechanical Systems · Convert existing 2-story and Cellar, 2-family house to One (1)-Family house. New layout as per accompanying plans. No product keyword matched | 0 | Jul 6, 2026 |
| B | 377 Broadway Condominium NYC DOB building permits | 9 | Suspended Scaffold · SUSPENDED SCAFFOLD OUTRIGGER SYSTEM FOR EXTERIOR FACADE RESTORATION WORK AND INSPECTION AT 377 BROADWAY, MANHATTAN, NY 10013 No product keyword matched | 0 | Jul 6, 2026 |
| B | BLDG INCORPORATED NYC DOB building permits | 9 | General Construction · ALTERATION (TYPE 2) OF AN EXISTING SINGLE FAMILY TOWNHOUSE. WORK TO INCLUDE 3RD FLOOR BATHROOM, INTERIOR PARTITION WORK, PLUMBING, AND ELECTRICAL. ROOF PAVER, CABINETRY, PLUMBING, GAS, AND ELECTRICAL. No product keyword matched | 0 | Jul 6, 2026 |
| B | Our Lady of Pompeii Church NYC DOB building permits | 9 | General Construction · Repairs to existing entry granite steps per plans submitted. No change in use, occupancy or egress proposed under this application. No product keyword matched | 0 | Jul 6, 2026 |
| B | ZHONGSHUN JIANZHU INC NYC DOB building permits | 9 | General Construction · HEREWITH FILE TO RESTORE THE FIRE DAMAGED RETAIL STORE INCLUDES THE REPLACEMENT OF FIRE-DAMAGED BEARING WALLS AND ROOFING, FLOORING REPAIRS, NEW PAINT, AND GENERAL CONSTRUCTION. NO CHANGE IN USE, EGRESS, AND OCCUPANCY. No product keyword matched | 0 | Jul 6, 2026 |
| B | ASTRAL PROPERTIES NYC DOB building permits | 9 | General Construction · ROOF REPLACEMENT AS PER PLANS FILED HEREWITH. NO CHANGE, TO USE EGREE OR OCCUPANCY. No product keyword matched | 0 | Jul 6, 2026 |
| B | Donnelly Building LLC NYC DOB building permits | 9 | Sign · ILLUMINATED NON-ADVERTISING ACCESSORY ELECTRONIC MESSAGE CENTER FOR DONNELLY MECHANICAL - IN PROPERTY LINES. NO CHANGE OF USE, EGRESS OR OCCUPANCY. No product keyword matched | 0 | Jul 6, 2026 |
| B | Hold Up Roll Up Brooklyn NYC DOB building permits | 9 | Sign · INSTALL EXTERIOR ILLUMINATED WALL SIGN (HOLD UP ROLL UP) No product keyword matched | 0 | Jul 6, 2026 |
| B | DENI INTERNATIONAL INC NYC DOB building permits | 9 | General Construction · GENERAL INTERIOR RENOVATIONS OF AN APARTMENT 2W. MINOR PARTITION REMOVAL. NO CHANGE IN USE, EGRESS OR OCCUPANCY. No product keyword matched | 0 | Jul 6, 2026 |
| B | SAUMIER HOLDING NYC DOB building permits | 9 | Supported Scaffold · INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. No product keyword matched | 0 | Jul 6, 2026 |
| B | 33RD AND BROADWAY LLC NYC DOB building permits | 9 | Plumbing · NEW GAS SERVICE AND GAS METER TO BE INSTALLED AS PER PLANS. NO CHANGE IN USE, OCCUPANCY OR EGRESS. No product keyword matched | 0 | Jul 6, 2026 |
| B | 250 PARK AVENUE, LLC NYC DOB building permits | 9 | Sprinklers · Modifications to the existing Sprinkler System: Relocate (12) existing sprinkler heads and piping and install (1) new head and associated piping on the 8th Floor as per plans (Kirby McInerney - Suite #820.) No change to use, egress or occupancy. No product keyword matched | 0 | Jul 6, 2026 |
| B | 209 MONTROSE LJ LLC NYC DOB building permits | 9 | General Construction · Proposed interior renovation to an existing three (3) story + cellar residential use building. No product keyword matched | 0 | Jul 6, 2026 |
| B | ROYAL KHALSA GEN'L CONST NYC DOB building permits | 9 | Construction Fence · Solid Ply-wood Construction fence as per plan filed. No product keyword matched | 0 | Jul 6, 2026 |
| B | COBY CONSTRUCTION LLC NYC DOB building permits | 9 | General Construction · INTERIOR ALTERATION (ALT-2) TO EXISTING CONDO APARTMENT UNITS. NEW WORK IS LIMITED TO THE INTERIOR OF APT 6N & 6M ON THE 6TH FLOOR. No product keyword matched | 0 | Jul 6, 2026 |
| B | Rhema Church NYC DOB building permits | 9 | Structural · RENOVATION TO RESTORE FIRE DAMAGE BUILDING. NO CHANGE IN USE. EGRESS OR OCCUPANCY. REPLACE PARTITIONS, RENOVATE EXIST KITCHENS & BATHROOMS. REPLACE DAMAGE CEILING & FLOORING W/NEW. REPLACE WINDOWS. PLUMING AND MECHANICAL FILED SEPARATE. No product keyword matched | 0 | Jul 6, 2026 |
| B | LOWVOLT TECH ENTERPRISES III INC NYC DOB building permits | 9 | Solar · ROOFTOP SOLAR INSTALLATION. NO CHANGE TO USE, OCCUPANCY OR EGRESS. No product keyword matched | 0 | Jul 6, 2026 |
| B | TYH BUILDERS LLC NYC DOB building permits | 9 | General Construction · APPLICATION FILED FOR AN ENLARGEMENT TO EXISTING 3 STORY + CELLAR. PROPOSED 6 STORY + CELLAR MIXED USE BUILDING. No product keyword matched | 0 | Jul 6, 2026 |
| B | Eim2 INC NYC DOB building permits | 9 | Mechanical Systems · INSTALL NEW VENTLESS HOOD AT 1ST FLOOR RESTAURANT OF EXISTING 6-STORY BUILDING AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR CERTIFICATE OF OCCUPANCY. No product keyword matched | 0 | Jul 6, 2026 |
| B | LIT GROUP, INC NYC DOB building permits | 9 | General Construction · Minor Interior renovation of existing apartment #2b on the 2nd floor. Architectural / Construction work only. No product keyword matched | 0 | Jul 6, 2026 |
| B | SAUSE ELECTRIC CO. NYC DOB electrical permits | 9 | Repurpose existing conduit run to feed a new 30 ckt 3 phase 277/480 volt distribution panel. No product keyword matched | 0 | Jul 6, 2026 |
| B | POWER SURGE ELECTRICAL IN NYC DOB electrical permits | 9 | Installation of (1) 600A rated end line box with coper detail, (1) 600A 3P disconnect switch, (1) 5-gang meter bank with 200A 3P main breakers, (1) 2-gang meter bank with 150A 3P main breakers and new grounding as per code. (4) 200A 3P panels for (4) apartment units with all new branch circuits for equipment, receptacles, lights and switches. (2) 150A 3P panels for (2) office spaces reconnecting existing circuits. (1) 200A 3P panel for receptacles, lights and switches. Power for new HVAC units. No product keyword matched | 0 | Jul 3, 2026 |
| B | BLUESKY DEVELOPMENT NYC DOB building permits | 9 | General Construction · PROPOSED INTERIOR RENOVATION OF EXISTING APARTMENT. FILED TO ADDRESS VIOLATION 39145604L;39145603J;39145601X .CONSTRUCTION WORK AS PER PLAN. NO CHANGE IN EGRESS, USE OR OCCUPANCY. No product keyword matched | 0 | Jul 2, 2026 |
| B | MASTORAS BUILDERS LLC NYC DOB building permits | 9 | Mechanical Systems · PROPOSED MECHANICAL SYSTEMS FOR 2 STORY W/ CELLAR; 2 FAMILY NEW BUILDING FILED IN CONJUNCTION WITH Q01217849-I1 No product keyword matched | 0 | Jul 2, 2026 |
| B | REGAL ESTATES LLC NYC DOB building permits | 9 | Suspended Scaffold · FISP INSPECTION (Facade Inspec/on Safety Program) INDUSTRIAL ROPE ACCESS TECHNIQUES AND METHODSSEE ATTACHED PLANS Designated Primary Site supervisor: Jesus Decola No product keyword matched | 0 | Jul 2, 2026 |
| B | TSQ DEVELOPMENT , LLC NYC DOB building permits | 9 | Plumbing · HEREBY FILING FOR RELATED PLUMBING WORK FOR NEW BUILDING# M00498287-I1 No product keyword matched | 0 | Jul 2, 2026 |
| B | 2995 CONEY ISLAND LLC NYC DOB building permits | 9 | Mechanical Systems · MECHANICAL WORK TYPE FILED IN CONJUNCTION WITH NEW BUILDING APPLICATION #322000099. NO CHANGE IN USE, EGRESS, BULK OR OCCUPANCY UNDER THIS APPLICATION. No product keyword matched | 0 | Jul 2, 2026 |
| B | BOGARDUS NYC DOB building permits | 9 | Plumbing · Scope of work will include Installation of Plumbing Fixtures and Sprinkle modifications to an existing sprinkler systems as indicated on plans. No change in use ,occupancy or egress. No product keyword matched | 0 | Jul 2, 2026 |
| B | ARTISTRY WORKS CONTR LLC NYC DOB building permits | 9 | Protection and Mechanical Methods · TEMPORARY INSTALLATION OF SHORING ON 1ST FLOOR AT EXPOSURE 1 AS PER PLAN. NO CHANGE TO USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION. No product keyword matched | 0 | Jul 2, 2026 |
| B | BOINAH SATMAR LLC NYC DOB building permits | 9 | General Construction · THIS APPLICATION IS FILED TO LEGALIZE EXISTING INTERIM MULTIPLE DWELLING (LOFT BOARD #30119) AS PER MDL ARTICLE 7B & 7C. CHANGE IN USE FROM MANUFACTURING TO RESIDENTIAL. NO CHANGE IN EGRESS, FLOOR AREA, BULK AND HEIGHT UNDER THIS APPLICATION No product keyword matched | 0 | Jul 2, 2026 |
| B | 994356062 NYC DOB building permits | 9 | General Construction · APPLICATION FILED HEREWITH TO CONVERT AN EXISTING THREE STORY TWO FAMILY BUILDING TO AN EIGHT FAMILY No product keyword matched | 0 | Jul 2, 2026 |
| B | THE GREATER NEW YORK NETWORK INC NYC DOB building permits | 9 | Construction Fence · HEREWITH FILE ALTERATION IN ORDER TO ERECT TEMPORARY CONSTRUCTION PLYWOOD FENCE. No product keyword matched | 0 | Jul 2, 2026 |
| B | MICHAEL ANTHONY CONTRACTI NYC DOB building permits | 9 | General Construction · Interior renovations in the sub-cellar. No change in occupancy, use or egress. No product keyword matched | 0 | Jul 2, 2026 |
| B | STORO CONSTRUCTION MANAGEMENT NYC DOB building permits | 9 | Structural · DESIGN STRUCTURE TO FACILITATE CONSTRUCTION OF 4 STORY BIG ALT BUILDING No product keyword matched | 0 | Jul 2, 2026 |