Mechanical Systems · MODIFICATIONS TO EXSITING MECHANICAL DUCTWORK AND PIPING TO SUPPORT LINAC R441 & R443 EQUIPMENT UPGRADES ON THE 4TH FLOOR. NO CHANGE IN OCUPANCY, USE OR EGRESS.
No product keyword matched · NYC DOB building permits
General Construction · INTERIOR RENOIVATIONS FOR THE LINACS R441 & R443 EQUIPMENT REPLACEMENT ON THE 4TH FLOOR. NO CHANGE IN OCCUPANCY, USE OR EGRESS..
No product keyword matched · NYC DOB building permits
General Construction · Alteration of existing Workroom/Dry lab to a new Shared Tissue Culture Lab on the 4th floor room RL-430. New equipment, patching & repairing of existing surfaces, new flooring & wall finishes, and new light fixtures. No change in occupancy use or egress.
No product keyword matched · NYC DOB building permits
General Construction · Proposed equipment replacement of existing Autoclave located on the 12th fl room RL-1202 Soiled Utility (Dirty Cage Wash). Patching and repairing of existing finishes as required. No change to occupancy use, or egress.
No product keyword matched · NYC DOB building permits