Structural · Repair and reinforce vault slab at first floor, repair and reinforce beams and columns at cellar as the plan shown. There is no change occupancy, use or egress.
Structural · Repair and reinforce vault slab at first floor, repair and reinforce beams and columns at cellar as the plan shown. There is no change occupancy, use or egress.
No product keyword matched · NYC DOB building permits
General Construction · CORRECTIVE MEASURE TO VIOLATIONS ## FEU10301AK, FEU10302AK- REPAIR EXISTING FACADE: REPAIR CRACKS, DAMAGED BRICKS LOOSE MORTAR, SILLS AND CRACKED STEPS AT RESIDENTIAL ENTRANCE. PROVIDE REPOINTING WHERE NEEDED ON BOTH BUILDING EXPOSURES.
No product keyword matched · NYC DOB building permits