Companies with dated public signals, ranked by fit with your products.
| Tier | Company | Score | Latest signal | Signals 90d | Last signal |
|---|---|---|---|---|---|
| C | Greenspeed Energy Solutions, LLC Austin issued construction permits | 7 | Building Permit · Installation of EV chargers and upgrade of electrical service No product keyword matched | 1 | Oct 29, 2026 |
| C | Solterra Global LLC Seattle electrical permits |
| 7 |
Installation of 9.599 KW AC of solar system on roof of SFR and addition of (2) 30 kwh FranklinWH aPower2 battery [10/29/26 BGO - Approved PV+ESS Plan Set] · Electrical No product keyword matched |
| 11 |
| Oct 29, 2026 |
| C | SOUND POWER Seattle electrical permits | 7 | Relocated electrical service · Electrical No product keyword matched | 6 | Oct 29, 2026 |
| C | Austin Bridge & Road Austin issued construction permits | 7 | Building Permit · ePlan: BAUS Review - [CONCURRENT] Installation of New 120/240 V Electrical Service Feeding: ARFF Gate Equipment Racks Roadway and Site Lighting for Midfield TWY Project. No product keyword matched | 1 | Oct 28, 2026 |
| C | Cascade Integration Seattle electrical permits | 7 | Adding 50A circuit for sauna · Electrical No product keyword matched | 8 | Oct 28, 2026 |
| C | Allied Electrical contracting Seattle electrical permits | 7 | Relocate Overhead Electrical service to North side of property and install new 200amp Meter Main. Replace existing
electrical panel with new 40 / 60 space panel. (Existing Panel location to remain)
Rewire top floor remodel · Electrical No product keyword matched | 3 | Oct 28, 2026 |
| C | Black Dog Electric LLC Seattle electrical permits | 7 | Installed a larger space electrical panel with afci/GFCI breakers, updated bonding, grounding, and surge protection. · Electrical No product keyword matched | 5 | Oct 28, 2026 |
| C | Power Design Inc****MAIN*** Austin issued construction permits | 7 | Electrical Permit · ePlan: Expedited Review - New Construction of Parking Garage - Module C. No product keyword matched | 2 | Oct 27, 2026 |
| C | Efficient Air Conditioning Inc. Austin issued construction permits | 7 | Plumbing Permit · Hall Bath: Remove and replace tile shower/tub valve vanity and move vanity light. The tub will remain. Primary Bath: Remove and replace tile & shower pan shower valve vanity and move vanity light. Shower pan drain will not move. Shower valves will not move location only removing and replacing with new. Existing condominium community. No product keyword matched | 4 | Oct 27, 2026 |
| C | Amigos Electric Austin issued construction permits | 7 | Electrical Permit · 1103 SF of Level 2 Interior alterations to create a base building multi-tenant corridor shell suites and the reconfiguration of the existing toilet rooms to make them TAS Compliant. No product keyword matched | 8 | Oct 27, 2026 |
| C | Alpha and Omega Electric Seattle electrical permits | 7 | Replace in-wall heater · Electrical No product keyword matched | 13 | Oct 27, 2026 |
| C | PRECISION ELECTRIC GROUP, INC Seattle electrical permits | 7 | Swapping out service panel adding exterior service disconnect and surge protection devise · Electrical No product keyword matched | 8 | Oct 27, 2026 |
| C | Ellhouse Industries Austin issued construction permits | 7 | Electrical Permit · Electrical service for playground lighting irrigation and pavilion. No product keyword matched | 1 | Oct 26, 2026 |
| C | CGI Commercial Austin issued construction permits | 7 | Building Permit · Changing out existing generators and ATS units. Alama Building 50KW 120/208 Volt 3 Phase. CCS Building 40KW 120/240 single phase. No product keyword matched | 1 | Oct 26, 2026 |
| C | DeBusk Electric Inc. Austin issued construction permits | 7 | Electrical Permit · 600amp 480volt oh service for temporary power
ref; 2026 041482 BP No product keyword matched | 6 | Oct 22, 2026 |
| C | ENERGY WORKS LLC Seattle electrical permits | 7 | Replacing old oil furnace with new Heat Pump System:
Adding/altering 1 x 40Amp and 1 x 20Amp circuits. · Electrical No product keyword matched | 7 | Oct 22, 2026 |
| C | Datskiy Electric LLC Seattle electrical permits | 7 | Low Voltage HVAC Energy Management Control System - Relocated VAV's and added VAV's · Electrical No product keyword matched | 13 | Oct 22, 2026 |
| C | Lightning Electrical Austin issued construction permits | 7 | Electrical Permit · ePlan: Commercial Expedited Review - Interior Remodel and Addition to Existing Building (2640 SF) . No product keyword matched | 7 | Oct 21, 2026 |
| C | Frank's Electric Austin issued construction permits | 7 | Electrical Permit · install Spectrum CCTV Cabinet No product keyword matched | 2 | Oct 21, 2026 |
| C | E-Power LLC Seattle electrical permits | 7 | rewiring · Electrical No product keyword matched | 7 | Oct 21, 2026 |
| C | Pacific Home Electric Seattle electrical permits | 7 | Panel with circuit modifications (Partial Re-wire) · Electrical No product keyword matched | 3 | Oct 21, 2026 |
| C | Black Sheep Electric LLC Seattle electrical permits | 7 | install/run new 240v 30amp circuit to new sauna loctaion. Install new 240v 60amp circuit for weather rated sub panel on back corner of house · Electrical No product keyword matched | 7 | Oct 21, 2026 |
| C | Knight Electrical Solutions LLC Austin issued construction permits | 7 | Electrical Permit · Emergency repair on an ethnic grocery store replaced CT meter added disconnect replaced wires going to the transformer. This was due to wires burning up. 1200 amps. No product keyword matched | 4 | Oct 20, 2026 |
| C | The Burt Group**MAIN** Austin issued construction permits | 7 | Building Permit · ePlan: Commercial Expedited Review - New Construction of Sports Facility - Transformer Pad. No product keyword matched | 8 | Oct 19, 2026 |
| C | Vital Mechanical Inc Seattle electrical permits | 7 | Replace existing 112.5kVA, 480V to 208Y/120V,3-phase transformer. [10/19/26 KEF - Plan set approved.] · Electrical No product keyword matched | 5 | Oct 19, 2026 |
| C | Sparkson Electrical LLC Seattle electrical permits | 7 | Install a dedicated 30-amp, 240-volt circuit and receptacle · Electrical No product keyword matched | 3 | Oct 18, 2026 |
| C | Will Power Electric Seattle electrical permits | 7 | Add a sub panel to the detached garage and use the sub panel to power a car charger
Adding a generator inlet to the main panel · Electrical No product keyword matched | 3 | Oct 16, 2026 |
| C | ANM Electric, Inc. Seattle electrical permits | 7 | Adding a transformer to derive a neutral, adding a panel and outlets. · Electrical No product keyword matched | 2 | Oct 15, 2026 |
| C | SV electric LLC Seattle electrical permits | 7 | 30? circuit for a Heat pump · Electrical No product keyword matched | 4 | Oct 14, 2026 |
| C | ROCK ELECTRIC Seattle electrical permits | 7 | 200 AMP SERVICE UPGRADE · Electrical No product keyword matched | 8 | Oct 14, 2026 |
| C | Energy Management Services Seattle electrical permits | 7 | Residential remodel wiring and panel · Electrical No product keyword matched | 5 | Oct 14, 2026 |
| C | Big State Electrical Austin issued construction permits | 7 | Electrical Permit · unit 100 (Whole Foods)
replacing burned guts from another contractor in switchboard - Emergency!
***not connected to any other EPs at this address-Hyatt*** No product keyword matched | 5 | Oct 13, 2026 |
| C | Royal Kings Electric llc Seattle electrical permits | 7 | Installing customer provided car charger. · Electrical No product keyword matched | 4 | Oct 13, 2026 |
| C | General Dynamics Information Technology, Inc. Austin issued construction permits | 7 | Electrical Permit · Generator replacement. Existing natural gas NG generator and its pad will be removed the new 4 x 8 pad to be poured to install new NG generator. A new ATS will be installed to replace existing on AT and Ts existing shelter building No product keyword matched | 2 | Sep 4, 2026 |
| C | SIGMA BLDG AND REMODELIN* NYC DOB building permits | 7 | General Construction · Horizontal Enlargement at Front and Rear with interior renovation and obtaining new C/O with Two accessory parking spaces at OSP. No product keyword matched | 0 | Feb 13, 2026 |
| C | STAR PLUMBING & HTNG LLC NYC DOB building permits | 7 | Plumbing · The scope of work consists of installing new toilets, sinks, water lines and gas line for commercial kitchen. No product keyword matched | 0 | Feb 13, 2026 |
| C | Heritage Human Services NYC DOB building permits | 7 | Plumbing · PLUMBING WORK ASSOCIATED WITH THE INTERIOR RENOVATION OF AN EXISTING OFFICE SPACE. POST APPROVAL AMENDMENT TO ADD SEWAGE EJECTOR PUMP SYSTEM. NO CHANGE IN USE, OCCUPANCY, OR MEANS OF EGRESS. NO GAS WORK. No product keyword matched | 0 | Feb 13, 2026 |
| C | EQUINITI NYC DOB building permits | 7 | General Construction · PROPOSED INTERIOR RENOVATION ON THE 53RD FLOOR INCLUDING PARTITIONS. ALL AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY. No product keyword matched | 0 | Feb 13, 2026 |
| C | Transamerica Financial Advisors NYC DOB building permits | 7 | Sprinklers · MODIFY EXISTING SPRINKLER HEADS FOR UNIT 2A No product keyword matched | 0 | Feb 13, 2026 |
| C | N & J HOME IMPROVEMNT COR NYC DOB building permits | 7 | General Construction · INTERIOR RENOVATION TO UNIT, REMOVAL OF WALL BOARDS AND PLUMBING FIXTURES IN EXISTING BATHROOMS. No product keyword matched | 0 | Feb 13, 2026 |
| C | 2683 Creston LLC NYC DOB building permits | 7 | Mechanical Systems · Mechanical work in conjunction with NB application #X01157822-I1 No product keyword matched | 0 | Feb 13, 2026 |
| C | ROYAL BUILDERS GROUP, INC NYC DOB building permits | 7 | Plumbing · INSTALLATION OF PLUMBING, SPRINKLER SYSTEMS AND SIAMESE INCONJUNCTION WITH NB APPLICATION# 421133543. NO CHANGE IN USE, EGRESS OR OCCUPANCY No product keyword matched | 0 | Feb 13, 2026 |
| C | QSR NY LLC NYC DOB building permits | 7 | Plumbing · new 2 replacement gas valve for ansul system No product keyword matched | 0 | Feb 13, 2026 |
| C | WHITESTAR ADVISORS, LLC NYC DOB building permits | 7 | General Construction · Proposed sub-division of existing office space on the 4th floor with rearrangement and construction of non-bearing interior partitions and door per plans. No change to building bulk, egress, use or occupancy. No product keyword matched | 0 | Feb 13, 2026 |
| C | MARK TWAIN OWNERS CORP. NYC DOB building permits | 7 | Plumbing · PLUMBING WORK RELATED TO THE INTERIOR COMBINATION AND RENOVATION OF APARTMENT 4GH ON THE FOURTH FLOOR AS PER TPPN 3/97. NO CHANGE TO USE, EGRESS, OR OCCUPANCY. No product keyword matched | 0 | Feb 13, 2026 |
| C | JOIE DU FOYER LLC NYC DOB building permits | 7 | Plumbing · HEREWITH FILING TO CORRECT VIOLATIONS # 39162751X, 39162752H, 39162748P, REMOVE ALL ILLEGAL NON-LOAD BEARING PARTITIONS AND PLUMBING FIXTURES AND CAP & REMOVE WATER & WASTE LINES AS PER PLANS. NO CHANGE OF USE, EGRESS OR OCCUPANCY THIS APPLICATION. No product keyword matched | 0 | Feb 13, 2026 |
| C | OMNI HOTELS NYC DOB building permits | 7 | Plumbing · INTERIOR RENOVATION EXISTING COMMERCIAL SPACE WITH PLUMBING WORK ON 1ST FLOOR. NO CHANGE IN USE, EGRESS OR OCCUPANCY. No product keyword matched | 0 | Feb 13, 2026 |
| C | Excelsior Dispensary LLC NYC DOB building permits | 7 | Plumbing · Modification to existing Plumbing system as per plans filed herewith. No change in use, egress or occupancy under this application. No product keyword matched | 0 | Feb 13, 2026 |
| C | SHELTERWOOD MANAGEMENT LLC NYC DOB building permits | 7 | General Construction · NON-ILLUMINATED NON-ADVERTISING ACCESSORY STOREFRONT AWNING - WHOLESURE. NO CHANGE OF USE, EGRESS OR OCCUPANCY. No product keyword matched | 0 | Feb 13, 2026 |
| C | FAIRBANK PROPERTIES NYC DOB building permits | 7 | Mechanical Systems · Modification of an existing Verizon site on the roof. Removal of (1) existing generator and all associated mounting hardware. All work in conformance with TPPN 5/98. No change in use, egress, or occupancy. No product keyword matched | 0 | Feb 13, 2026 |