Home
Workspace
Klise
Target
Seer
Signals
Competitors
Contacts
Log in
Seer/Prospects/PRECISION ELECTRIC GROUP, INC
Back to prospects

PRECISION ELECTRIC GROUP, INC

SEATTLE, TUKWILA, WA · Outside service region

AnalysisCompany profileContactsEmail draftSources

Analysis

Overall 7 / 20Tier C
Keyword
Seer chat
1 / 5
0 keyword-matching signals in the last 90 days.
Freshness5 / 5Latest signal is within 30 days.
Place0 / 5WA is outside the seller’s region and target regions.
Target fit1 / 5No target company types set; baseline is 1 star.

Company profile

Company
PRECISION ELECTRIC GROUP, INC
Source for Company (opens in new tab)
Signal source
Seattle electrical permits
Signal date
Oct 27, 2026
Source for Signal date (opens in new tab)
Signal count
53 saved signals, 8 in the last 90 days
Signal summary
Swapping out service panel adding exterior service disconnect and surge protection devise · Electrical
Source for Signal summary (opens in new tab)
Address
Not found
Phone
Not found
Email
Not found
Website
Not found
Decision maker
Not found
DM title
Not found

Contacts

No contact found

Phone: not found · See the source record

Log in to search contacts

Email draft

Add a contact before generating a draft.

Sources

53 signals
  • Oct 27, 2026
    Permit
    Swapping out service panel adding exterior service disconnect and surge protection devise · Electrical
    No product keyword matched · Seattle electrical permits
    Source record (opens in new tab)
  • Oct 22, 2026
    Permit
    Furniture feed to lobby desk · Electrical
    No product keyword matched · Seattle electrical permits
    Source record (opens in new tab)
  • Oct 21, 2026
    Permit
    Electrical tenant improvements for Genscript at 1551 Eastlake Ave E., Floor 1. Work includes selective electrical demolition; reallocation of existing lab branch circuits; added office furniture and desk power; two dedicated phone-booth circuits; relocation/reinstallation of existing lighting; and installation of eight new vapor-tight fixtures. Low-voltage work includes data drops, IDF buildout, access-control modifications, and CCTV cameras with associated cabling and equipment. Existing elect · Electrical
    No product keyword matched · Seattle electrical permits
    Source record (opens in new tab)
  • Oct 15, 2026
    Permit
    Furniture feeds in open office 3210 · Electrical
    No product keyword matched · Seattle electrical permits
    Source record (opens in new tab)
  • Oct 13, 2026
    Permit
    J00312684 - New notification devices to support new room layout on Level 6. New power supply provided to support added strobes, new speaker amplifier to supposed added speakers, new duct detectors and control modules for FSD's. · Electrical
    No product keyword matched · Seattle electrical permits
    Source record (opens in new tab)
  • Oct 9, 2026
    Permit
    Install one new outdoor 120/208V, single-phase Sports Court panel with a 50A feeder from existing panel 1L1. Add seven new 20A branch circuits and modify one existing 20A circuit. Provide exterior pergola and sports-court lighting, including 10 bollards, 5 vapor-tight fixtures, 7 pedestrian lights, and 6 pole-mounted sports lights. Install six weatherproof receptacles, timer/photocell lighting controls, and one 120V, 20A circuit for the irrigation controller. No changes to the existing electric · Electrical
    No product keyword matched · Seattle electrical permits
    Source record (opens in new tab)
  • Sep 25, 2026
    Permit
    Tenant build-out level 6 for life-science tenant. New power, lighting, low voltage, and mechanical systems. [9/24/26 KEF - Plan set approved.] · Electrical
    No product keyword matched · Seattle electrical permits
    Source record (opens in new tab)
  • Sep 15, 2026
    Permit
    Replace existing 100A, 120/240V, single-phase meter base/panelboard combination with a new 100A NEMA 3R meter-main/panelboard combination. Replace one 100A feeder raceway and conductors due to deterioration and reconnect existing outbuilding and convenience-power loads. Remove three existing security lights and photocell; install four LED security lights and one new photocell on existing poles. · Electrical
    No product keyword matched · Seattle electrical permits
    Source record (opens in new tab)
  • Jul 20, 2026
    Permit
    Power, lighting, and low voltage for minor modifications · Electrical
    No product keyword matched · Seattle electrical permits
    Source record (opens in new tab)
  • Jul 15, 2026
    Permit
    Furniture connections · Electrical
    No product keyword matched · Seattle electrical permits
    Source record (opens in new tab)
  • Jul 13, 2026
    Permit
    Bldg B - ComRoom Build Out. Installing data outlets, installing access control panel and card readers. · Electrical
    No product keyword matched · Seattle electrical permits
    Source record (opens in new tab)
  • Jul 13, 2026
    Permit
    Bldg A - Comroom build out. Adding low voltage outlets. · Electrical
    No product keyword matched · Seattle electrical permits
    Source record (opens in new tab)
  • Jul 1, 2026
    Permit
    Adding Power To Flex POD and HVAC Split Systems · Electrical
    No product keyword matched · Seattle electrical permits
    Source record (opens in new tab)
  • Jul 1, 2026
    Permit
    Remodel of existing lobby & conference room with new furnmiture, finishes & lighting [7/1/2026 BGO - Approved Plan Set] · Electrical
    No product keyword matched · Seattle electrical permits
    Source record (opens in new tab)
  • Jun 22, 2026
    Permit
    J00296049 Joint venture with PEGI. TI improvement on 3rd flr suite 2, 3, and 4. EST3 building panel to remain. Removing existing and add new notification devices to support new room layout (44). Existing power supplies and amplifiers to be used to support new layout. · Electrical
    No product keyword matched · Seattle electrical permits
    Source record (opens in new tab)
  • Jun 19, 2026
    Permit
    We are adding a 10.8kW solar panel system to Bush Middle School · Electrical
    No product keyword matched · Seattle electrical permits
    Source record (opens in new tab)
  • Jun 11, 2026
    Permit
    Interior improvements to level 2 office and research laboratory including power, lighting & low voltage · Electrical
    No product keyword matched · Seattle electrical permits
    Source record (opens in new tab)
  • Jun 11, 2026
    Permit
    Replace over 20% of luminaires in area of construction and power install for Fred Hutch Medical facility on Level 1. · Electrical
    No product keyword matched · Seattle electrical permits
    Source record (opens in new tab)
  • Jun 9, 2026
    Permit
    Adding (1) 30A circuit in RM 333 Adding (4) 30A circuits in RM 308 Adding (2) 20A circuits in RM 349 Adding (1) 40A circuit in Autoclave room Adding (1) 60A circuit in Auto clave room Adding (2) Card reader door packages · Electrical
    No product keyword matched · Seattle electrical permits
    Source record (opens in new tab)
  • Jun 9, 2026
    Permit
    Tenant improvements to existing level 3 office & research laboratory including power, lighting & low voltage [6/9/2026 BGO - Approved Plan Set] · Electrical
    No product keyword matched · Seattle electrical permits
    Source record (opens in new tab)