Add 125A circuit and breaker to existing spare slot in the basement 208V/3Ph Panel.
Reconfigure existing Level 1 Electrical Panels such that the 225A panel on the right feeds the left 100A panel via a BAB3100 breaker.
Add a 125A breaker to the top of the right 225A panel on the right and route the new circuit out the top of the panel. · Electrical
No product keyword matched · Seattle electrical permits
Replacing existing controllers with preprogrammed JCI FX90 supervisory controllers. (2) Sensors for Make Up Air Units, (9) controllers for Heat Pumps and (9) new thermostats including wiring for new controls. · Electrical
No product keyword matched · Seattle electrical permits