Companies with dated public signals, ranked by fit with your products.
| Tier | Company | Score | Latest signal | Signals 90d | Last signal |
|---|---|---|---|---|---|
| B | ESQUIRE MANAGEMENT CORP. NYC DOB building permits | 11 | General Construction · Interior renovation of apartment 2F. Work includes partition work, infilling the existing doorway with a new non-bearing partition, new sliding door and pocket door, cabinetry, new kitchen and bath fixtures, appliances and finishes. Wood floors refinished No product keyword matched | 2 | Oct 15, 2026 |
| B |
| SKYVISION CONSTRUCTIONS NYC DOB building permits |
| 11 |
Sidewalk Shed · PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. LIVE LOAD 300 PER SQUARE FEET. SIDEWALK SHED SHALL COMPLY WITH CHAPTER # 33 OF THE 2022 CODE. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATIONPROPOSED INSTALLATION OF HEAVY DUTY S No product keyword matched |
| 7 |
| Oct 15, 2026 |
| B | FUTURA BUILDERS GROUP INC NYC DOB building permits | 11 | General Construction · APPLICATION FILED HEREWITH FOR EXTERIOR LEAK REPAIRS AT APARTMENT TB WORK AS SHOWN ON PLANS SUBMITTED. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION No product keyword matched | 3 | Oct 15, 2026 |
| B | SEVA PROPERTY DEVLOPMENT NYC DOB building permits | 11 | Mechanical Systems · MECHANICAL WORK-TYPE ONLY IN SUBSEQUENT FILING OF GC JOB# B01148954 TO INSTALL A NEW DUCTLESS HVAC SYSTEMS IN AN EXISTING 2-FAMILY DWELLING UNIT. No product keyword matched | 3 | Oct 15, 2026 |
| B | ALL BOROUGH GROUP SVC INC NYC DOB building permits | 11 | Support of Excavation · SOE related to NB Q00778284 No product keyword matched | 4 | Oct 15, 2026 |
| B | SHUN XING CAPITAL IMPT IN NYC DOB building permits | 11 | General Construction · PROPOSED INTERIOR RENOVATION OF EXIST. 2 STORY BRICK BUILDING. GENERAL CONSTRUCTION WORK AT CEL, 01, AND 02 FLOOR; REMOVE & INSTALL WINDOWS, PARTITIONS, AND HARDWOOD FLOOR. INSTALL A STAIR FROM CELLAR TO STREET LEVEL. NO CHANGE IN USE, EGRESS, OCCUPANCY. No product keyword matched | 1 | Oct 15, 2026 |
| B | JIA WEI CONSTRUCTION INC NYC DOB building permits | 11 | General Construction · INTERIOR RENOVATION WITH PARTITION WORKS FOR CELLAR AND FIRST FLOOR BEAUTY SALON IN ORDER TO RESOLVE ECB VIOLATON# 35666080H AND 35729386X. NO CHANGE OF USE, EGRESS OR OCCUPANCY. No product keyword matched | 3 | Oct 15, 2026 |
| B | CANDOR CAPITAL ONE LLC NYC DOB building permits | 11 | General Construction · 10 STORY + CELLAR MIXED USE NEW BUILDING WITH 83 DWELLING UNITS No product keyword matched | 8 | Oct 15, 2026 |
| B | FIOCCHI GROUP LLC NYC DOB building permits | 11 | General Construction · INTERIOR RENOVATION TO COMBINE APARTMENTS 48C &48DE ON THE 46TH FLOOR. REMOVAL AND INSTALLATION OF INTERIOR NON-BEARING PARTITIONS, FIXTURES, AND FINISHES. NO CHANGE TO USE,OCCUPANCY, OR EGRESS UNDER THIS APPLICATION No product keyword matched | 3 | Oct 15, 2026 |
| B | MID-STATE CONSTRUCTION C NYC DOB building permits | 11 | Support of Excavation · #8877 - Support of Excavation for Foundation of new Elevator. No change in egress, use, or occupancy. No product keyword matched | 2 | Oct 15, 2026 |
| B | CONG KEREM CHAIM NYC DOB building permits | 11 | Construction Fence · PROPOSED 8FT CONSTRUCTION FENCE. NO CHANGE TO USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION. No product keyword matched | 1 | Oct 15, 2026 |
| B | ISLAMIC COUNCIL OF AMERICA, INC NYC DOB building permits | 11 | Mechanical Systems · NEW MECHANICAL SYSTEM No product keyword matched | 1 | Oct 15, 2026 |
| B | DOMAIN 41ST STREET SITE B LLC NYC DOB building permits | 11 | Supported Scaffold · TEMPORARY PIPE SCAFFOLD AS PER DRAWINGS. SCAFFOLD SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION. No product keyword matched | 9 | Oct 15, 2026 |
| B | SEA-DAR ENTERPRISES, INC NYC DOB building permits | 11 | Mechanical Systems · MODIFICATION OF HVAC EQUIPMENT AND DUCTWORK. No product keyword matched | 4 | Oct 15, 2026 |
| B | A10 Capital, LLC NYC DOB building permits | 11 | Structural · #8877 - Structural modifications to install an Elevator in Popmart space. No change in egress, use, or occupancy. No product keyword matched | 2 | Oct 15, 2026 |
| B | KM CONSTRUCTION GROUP INC NYC DOB building permits | 11 | General Construction · ALT1 FILED FOR PARTIAL REMOVAL OF TOP FLOOR, CONSTRUCTION OF NEW DECKS, AND INTERIOR RENOVATIONS CONSISTING OF PARTITIONS, FINISHES AND CHANGE FROM 5-FAMILY TO 1-FAMILY TOWNHOUSE AS PER PLANS FILED HEREWITH. No product keyword matched | 1 | Oct 15, 2026 |
| B | B36 SERVICES INC NYC DOB building permits | 11 | Structural · HORIZONTAL ENLARGEMENT OF EXIST. 2-STORY, 1-FAMILY BLDG. INTERIOR RENOVATION AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. TO ADDRESS HRP ASSOCIATED WITH COMPLAIN#4A35465. No product keyword matched | 16 | Oct 15, 2026 |
| B | AMSTERDAM 88 LLC NYC DOB building permits | 11 | General Construction · INSTALLATION OF AUTOMATED PARKING GARAGE SYSTEM IN PARTIAL FIRST, SECOND AND THIRD FLOORS PER OTCR SUBMITTAL CODE #09-25; STRUCTURAL SUPPORT (POURED, CAST-IN-PLACE, NON-COMBUSTIBLE CONCRETE FLOORS) FILED UNDER NB APPLICATION M01105098-i1 No product keyword matched | 2 | Oct 15, 2026 |
| B | MARK CONTRACTING NY INC NYC DOB building permits | 11 | Sidewalk Shed · INSTALLATION OF HEAVY DUTY SIDEWALK SHED AND PIPE SCAFFOLDING. No product keyword matched | 10 | Oct 15, 2026 |
| B | LICO CONTRACTING INC NYC DOB building permits | 11 | Mechanical Systems · Mechanical changes on the 9th floor as indicated on drawings. No product keyword matched | 2 | Oct 15, 2026 |
| B | FULL SERVICE CONTRACTING NYC DOB building permits | 11 | Mechanical Systems · REPLACE EXISTING HVAC AT ROOF AND NEW DUCT WORK AT FIRST AND SECOND FLOORS. NO CHANGES IN OCCUPANCY, USE GROUP OR EGREES No product keyword matched | 2 | Oct 15, 2026 |
| B | CHESS BUILDERS LLC NYC DOB building permits | 11 | Plumbing · PLUMBING SYSTEM FILED IN CONJUNCTION WITH NB JOB NUMBER M01146211-I1. No product keyword matched | 14 | Oct 15, 2026 |
| B | 8322 LLC NYC DOB building permits | 11 | Earth Work · VERTICAL & HORIZONTAL EXTENSION OF EXISTING ONE FAMILY. OBTAIN NEW C OF O. No product keyword matched | 1 | Oct 15, 2026 |
| B | NYC HOLDINGS MGMT NYC DOB building permits | 11 | General Construction · FACADES REPAIR : WORK INCLUDES BRICK REPLACEMENT, MASONRY MORTAR JOINTS, PARPET REBUILDING ,REMOVE AND REPLACE DEFECTIVE STUCO. ALL AS PLAN, NO CHANGE IN USE EGRESS OR OCCUPANCY. No product keyword matched | 1 | Oct 15, 2026 |
| B | FOY MECH AND SONS LLC NYC DOB building permits | 11 | Plumbing · MODIFICATIONS TO EXISTING PLUMBING AND SPRINKLER SYSTEMS. NO CHANGE TO USE, OCCUPANCY OR EGRESS No product keyword matched | 1 | Oct 15, 2026 |
| B | A.G.M. PLUMBING & HEATING NYC DOB building permits | 11 | Plumbing · Application is filed for plumbing work associated with interior renovation of existing 2 story 2 family building. All work as per plans submitted herewith. No change in use, egress or occupancy under this application. No new CO to be filed. No product keyword matched | 2 | Oct 15, 2026 |
| B | HASAN A SALIM NYC DOB building permits | 11 | General Construction · REPLACEMENT/REPAIR OF CONCRETE SLAB AND STAIRS COURT YARD. THERE IS NO CHANGE TO THE EXISTING USE, OCCUPANCY CLASSIFICATION, OR EGRESS UNDER THIS APPLICATION. No product keyword matched | 4 | Oct 15, 2026 |
| B | GEO CREATE SOLUTIONS INC NYC DOB building permits | 11 | Mechanical Systems · Removal of existing & installation of new mechanical equipment as part of Limited Townhouse Renovation Upgrade. No change to use, occupancy, or egress. No product keyword matched | 1 | Oct 15, 2026 |
| B | ZK DEVELOPMENT CORP NYC DOB building permits | 11 | General Construction · In-kind replacement of existing legally permitted greenhouse structure. No change to use, egress, or occupancy. No product keyword matched | 2 | Oct 15, 2026 |
| B | RKA PIPING AND HEATING NYC DOB building permits | 11 | Plumbing · RENOVATION OF EXISTING KITCHEN, RELOCATION OF EXISTING 3 PC BATHROOM. No product keyword matched | 2 | Oct 15, 2026 |
| B | THE PARKOFF ORGANIZATION NYC DOB building permits | 11 | Plumbing · PLUMBING WORK IN CONJUNCTION WITH GENERAL CONSTRUCTION WORKAS PER PLAN. REMOVE ECB VIOLATION # 39197647X AND VACATE ORDER #2446356. NO CHANGE IN USE,EGRESS OR OCCUPANCY. No product keyword matched | 7 | Oct 15, 2026 |
| B | K.W.MCINTOSH CONSTRUCTION NYC DOB building permits | 11 | Construction Fence · Temporary construction Fence No product keyword matched | 2 | Oct 15, 2026 |
| B | SEOUL INTERIOR & BUILD IN NYC DOB building permits | 11 | Mechanical Systems · INSTALLATION NEW HVAC FOR EXISTING STORE ON 1ST FLOOR. NO CHANGE IN USE, OCCUPANCY AND EGRESS UNDER THIS APPLICATION. No product keyword matched | 2 | Oct 15, 2026 |
| B | RIVER ARTS APARTMENTS NYC DOB building permits | 11 | Structural · Walkway and fire escape repairs as shown on the drawings filed herewith. No change in use, egress, or occupancy. No product keyword matched | 1 | Oct 15, 2026 |
| B | COLGATE MAINTENANCE CORP. NYC DOB building permits | 11 | Sprinklers · INSTALLATION OF NEW FIRE SPRINKLER SYSTEM WITH VALVES AND METER FOR SAME. FILED IN CONJUNCTION WITH NEW BUILDING APPLICATION # 510115705. No product keyword matched | 3 | Oct 15, 2026 |
| B | MIDLAND BEACH YARD LLC NYC DOB building permits | 11 | Plumbing · SUBMIT APPLICATION OF PLUMBING WORKS IN CONJUNCTION WITH NB APPLICATION NO. S08034063-I1 No product keyword matched | 7 | Oct 15, 2026 |
| B | HYDRONIC CONCEPTS NY P&H NYC DOB building permits | 11 | Plumbing · Filing plans herewith for plumbing work related to the interior renovation for a new Candy Land retail store. No change to use, egress, or occupancy. No product keyword matched | 1 | Oct 15, 2026 |
| B | 410 ZEREGA ROKO 9 LLC NYC DOB building permits | 11 | Mechanical Systems · Proposed mechanical equipment throughout building No product keyword matched | 3 | Oct 15, 2026 |
| B | FELIX ROASTING CO NYC DOB building permits | 11 | Structural · APPLICATION FILED FOR STRUCTURAL MODIFICATIONS/ADDITIONS AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. No product keyword matched | 1 | Oct 15, 2026 |
| B | FIVE POINTS DEVELOPMENT GROUP NYC DOB building permits | 11 | Sidewalk Shed · INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. LIVE LOAD 300PSF. No product keyword matched | 3 | Oct 15, 2026 |
| B | KJDS HOME IMPROVEMENT LLC NYC DOB building permits | 11 | General Construction · Remove/Replace/Renovate/Extend existing porch. No product keyword matched | 2 | Oct 15, 2026 |
| B | TJX COMPANIES NYC DOB building permits | 11 | Mechanical Systems · An HVAC upgrade. Replacement of existing air handling units and outside air fans. Installation of new refrigerant exhaust fans. No product keyword matched | 1 | Oct 15, 2026 |
| B | A. TRENKMANN ESTATE, INC. NYC DOB building permits | 11 | General Construction · PROPOSED FACADE REPARE AND REPLACEMENT OF LEANING MASONRY PARAPET IN KIND TO MATCH EXISTING IN MATERIAL, PROFILE, COLOR, AND TEXTURE AS PER PLAN.NO CHANGE IN USE, EGRESS, OR OCCUPANCY. No product keyword matched | 1 | Oct 15, 2026 |
| B | J & L HOLDING CORPORATION NYC DOB building permits | 11 | Sidewalk Shed · INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. LIVE LOAD 300PSF. No product keyword matched | 4 | Oct 15, 2026 |
| B | RMD ELECTRIC CORP NYC DOB electrical permits, NYC DOB building permits | 11 | Install Temp 400 amp three phase service/wiring of 3 temp trailers along with temp outdoor lighting. No product keyword matched | 1 | Oct 15, 2026 |
| B | CITYLINE RESTORATION INC. NYC DOB building permits | 11 | General Construction · REMOVAL OF EXISTING SOLID BRICK MASONRY PARAPET WALL, REBUILDING PARAPET WALL & INSTALLING NEW ROOF RAILING SYSTEM AS PER PLANS. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. No product keyword matched | 1 | Oct 15, 2026 |
| B | Rose Realty corp. NYC DOB building permits | 11 | Sidewalk Shed · INSTALLATION HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION. HEAVY DUTY SIDEWALK SHED SHALL COMPLY WITH CHAPTER 33 OF THE 2022 BUIILDING CODE. No product keyword matched | 1 | Oct 15, 2026 |
| B | 729 Van Sinderen HDFC NYC DOB building permits | 11 | Structural · Subsequent filing for proposed structural work for new residential building filed in conjunction with NB # B01043155-I1. No product keyword matched | 3 | Oct 15, 2026 |
| B | COFINANCE INC. NYC DOB building permits | 11 | Sprinklers · Application filed for the modification of the bldg.s sprinkler system. No change in use, egress or occupancy. No product keyword matched | 4 | Oct 15, 2026 |
| B | LEGACY PLUMBING & HTG LLC NYC DOB building permits | 11 | Plumbing · INSTALLATION OF PLUMBING FIXTURES AND COMMERCIAL COOKING EQUIPMENT No product keyword matched | 3 | Oct 15, 2026 |